Presentation is loading. Please wait.

Presentation is loading. Please wait.

Update of current workplan activities 18 th Biannual Meeting in Brussels.

Similar presentations


Presentation on theme: "Update of current workplan activities 18 th Biannual Meeting in Brussels."— Presentation transcript:

1 Update of current workplan activities 18 th Biannual Meeting in Brussels

2 Financial and Funding Update ALNAP fully funded Cash flow healthy Multi-annual donors: 10 members have pledged for 2006/7 and 1 for 2007/8 Sound financial footing for the future

3 i.Norwegian Refugee Council FM representative: Eigil Olsen ii.Save the Children US FM representative: Tammie Willcuts Two new Full Members

4 Kashmir Earthquake Two papers: a)South Asia Earthquake 2005: Learning from Previous Earthquakes by Tony Beck b)Forthcoming title: South Asia Earthquake 2005 - Learning from Previous Recovery Operations

5 ALNAP Website

6 RHA in 2005 Chapter 1 overview – slightly expanded from previous years Evaluation synthesis Study on utilisation of evaluation findings and recommendations Meta-analysis once every two years Chapter 2 – now replaced by stand alone study, probably on participation and consultation of affected populations

7 ALNAP Guides a)Protection - An ALNAP Guide for Humanitarian Agencies First edition. Published 2005. Translated into Spanish and Arabic. French to be arranged. Japanese underway. Requests for translation in Russian and Indonesian. Oxfam to take over publication and distribution. b)Practitioners Handbook on Participation and Consultation Draft manual trialled. Re-write in progress, due to end in January 2006. To be published by Oxfam. c)Evaluating Humanitarian Action Final edit underway. Publication process to begin at the end of February 2006.

8 Evaluative Reports Database and Website a)A revamped version of the Evaluative Reports Database has been launched: Improved login facilities – ALNAP members need reapply for access. Improved management for secretariat. Feedback welcome b)Current overhaul/facelift planned for ALNAP website. c)Useful Resources Database To be phased out in 12 months or discontinued?

9 Meetings and Representation Official launch of ALNAP Protection Guide: Centre of Humanitarian Dialogue, Geneva Beyond the Blame Game: meeting on informing ongoing policy and programming in NIGER. Organised with HPG Meeting of Quality and Accountability Initiatives, Geneva. Danish Refugee Council: presentation by MH to Country Programme Managers USAID: presentation by TB on findings from ALNAP RHA. British Red Cross Society: presentation by JM on reflections on the RHA in the light of the work of Clara Barton. IECHA Madrid. presentation by JM on lessons from the RHA and reflections on the work of the TEC HPG Advisory Group: presentation by JM on potential findings from the TEC in the light of previous findings from the RHA.


Download ppt "Update of current workplan activities 18 th Biannual Meeting in Brussels."

Similar presentations


Ads by Google