HOORRRAAAAYYYYYY GOAL... ? FINAL TEST: TEST THE BRIDGE WITH WEIGHTS TO SEE THE LOAD IT CAN CARRY BEFORE BREAKING!! PURPOSE: (FOR YOU AS GRADE 7 STUDENTS)... ? BRIDGE BUILDING PROJECT (bbp)
4
THE BRIDGE.... MUST SPAN 30 CM AND BE NO LONGER THAN 40 cm BE 5 CM ACROSS (WIDE) BE ABLE TO HAVE A WEIGHT HOOKED OVER THE CENTER INCLUDE AT LEAST 1 TYPE OF BRIDGE CANNOT HAVE PILLARS Height cannot exceed 1/3 of length ANYTHING ELSE??
5
ROLES ACCOUNTANT: ARTIST: BUILDER: PROJECT MANAGER: BE MORE DOG VIDEO
6
Accountant ACCOUNTANT MUST FILL OUT THE FOLLOWING CHART (SEE WORKSHEET) ESTIMATED VALUES ACTUAL VALUES RETURNS Budget is 110 000 (10 x $10 000, 10 x $1 000) TAXES KEEP TRACK OF $ (IF YOU LOSE IT, IT’S GONE FOR GOOD!) FOR EVERY 10 000$, 1 BONUS POINT WILL BE GIVEN WORK ON VIDEO/BLOG??
7
Artist COMPLETES THE MAIN DESIGN ALTHOUGH EACH STUDENT ALSO MUST COMPLETE A DRAWING ON THEIR WORKSHEET THE DRAWING MUST BE HANDED IN, LABELLED, DETAILED, HAVE MEASUREMENTS AND INCLUDE GROUP IDEAS FOR POSSIBLE CHANGES THE ARTIST WILL ALSO HELP/OVERSEE BUILDING and make sure it FOLLOWS THE DESIGN
8
Builder BUILDS THE BRIDGE (ARTIST HELPS WITH THIS PART TOO). OTHER TEAM MEMBERS ARE ALSO A PART OF THIS BY GETTING THE BUILDER MATERIALS, HOLDS THINGS, HELPS GLUE ETC.
9
Project Manager OVERSEES ALL OTHER WORKERS SHOULD BE ORGANIZED AND ON TASK!!! TELL PEOPLE WHAT THEY SHOULD BE DOING IF GROUP IS OFF TRACK, THE MANAGER GETS PPL BACK ON TRACK (OTHERWISE FINES ARE GIVEN) BLOGS/WORKS ON VIDEO! (ARTIST/ACCOUNTANT CAN HELP TOO)
10
OUTLINE FOR PROJECT ASSIGN TASKS DESIGN AS A GROUP BRAINSTORM IDEAS (SHOULD TAKE ~ 40 MINS) POSTER (NEEDS TO BE HANDED IN W/ REPORT: ARTIST) THERE CAN BE MANY DRAFTS BUT 1 FINAL ARTIST POSTER ESTIMATED # OF MATERIALS:ACCOUNTANT MANAGER: START BLOG COME UP WITH GROUP NAME (MANAGER?) BUILD THE BRIDGE HAND EVERYTHING IN... TEST THE BRIDGE
11
Cost of Materials SCISSORS$10 000/20 MINS PAPER$15 000/ SHEET POPSICLE STICKS$ 2 000/STICK ADD’N TOOTHPICKS $ 1 000/PICK PIPECLEANERS$ 1 000/PIPECLEANER TAPE (CLEAR TAPE)$ 10 000/10 CM TAPE (MASKING TAPE)$20 000/ 5 CM STRING $30 000/ 10 CM RETURNS MUST BE MADE THE SAME CLASS AND CANNOT BE DAMAGED! PROOF OF PURCHASE REQUIRED (ACCOUNTANT SHEET) TAXES MUST BE DONE ON FINAL CHART.
12
FINAL PROJECT GO THROUGH EACH PART (report) SELF-ASSESSMENT AND PEER ASSESSMENT (report) AT THE END: YOU WILL HAND IN 4 REPORTS 1 DETAILED DRAWING 1 ACCOUNTANT CHART BLOG AND/OR VIDEO FINAL BRIDGE MODEL!!! VIDEO: HOW TO DEFEND YOURSELF BY CHOCHAGAK
13
Blog/video Every manager must blog about their groups daily activities Managers can also create a video of their bridge being built every day (this can be done as creatively as desired; will be submitted to me online) Videos cannot have faces of students in them!! Must only be talking/daily construction of bridge
Similar presentations