1 9 th Oct. 2008 Design and Construction of Main & Crescent Bridges.

Similar presentations


Presentation on theme: "1 9 th Oct. 2008 Design and Construction of Main & Crescent Bridges."— Presentation transcript:

1 1 9 th Oct. 2008 Design and Construction of Main & Crescent Bridges

2 2 Dubai Waterfront Palm Jebel Ali Palm Jumeirah The World Palm Deira Location

3 3 Trunk Frond C1 L=380m 3Lanesx2 L=380m 3Lanesx2 M1 L=1,200m 4Lanesx2 L=1,200m 4Lanesx2 C3 L=380m 2Lanesx2 L=380m 2Lanesx2 C4 L=380m 3Lanesx2 L=380m 3Lanesx2 M3 L=1,450m 4Lanesx2 L=1,450m 4Lanesx2 A = 11,600,000 m 2 Nakheel Site Office PC Yard Site Office PC Yard Site Office Site Layout

4 4 Main and Crescent Bridges Project, Palm Jebel Ali 2007.4.1 ~ 2010.11.30 (44months) US$ 350,286,921 (AED 1,285,553,000) NAKHEEL PARSONS PTG Halcrow International Partnership Item Main BridgesCrescent Bridges Sum M1M3C1 / C4C3 Total Length1,200mx21,450mx2380mx2x2380mx27,580m Steel Rebar (Dia.16~40mm) 15,295ton19,421ton14,385ton5,540ton54,641ton Concrete (Strength 40~50Mpa) 82,538m 3 100,601m 3 61,361m 3 23,898m 3 268,398m 3 Design & Build (Lump Sum) Project Name Construction Period Contract Amount Employer Consultant Designer Contract COWI 3 rd Party Checker Contract

5 5 23.5m Main Bridge

6 6 19.35m Crescent Bridge

7 7 Description 2007200820092010 4681012246810122468101224681012 Detail Design M1 Bored Piling Substructure Superstructure (PSM) M3 Bored Piling Substructure Superstructure (PSM) C1 Bored Piling Substructure Superstructure (FSM) C4 Bored Piling Substructure Superstructure (FSM) C3 Bored Piling Substructure Superstructure (FSM) Pavement Utility Progress ( %)12.6 %44.7 %82.4 %100.0 % 32% Work Programme

8 8 Casting Cell (Mould) Steel Shop Gantry Crane Rebar Jig Steam Curing Chamber Batch Plant 123 456 PC Yard area : 700m x 200m 1 4 6 2 3 5 Office Stock yard Workshop Launching Girder Seg Transporter DescriptionQty Casting Cell Typical Seg.6set Pier Seg.2set Gantry Crane 180 ton2nos 30ton1nos Tower Crane3nos SteamCuring Chamber8set PC Production / PC Yard Layout

9 9 Casting Mould Match Casting Rebar Jig Steam Curing Gantry Crane Batching Plant Workshop Manipulator PC Production / PC Yard Overview

10 10 PC Erection / Transport - Self weight of transporter : 44ton - Carrying capacity : 170ton - Length : 27.1m - Width : 4.68m - Carrying speed : 3km/hr 1500m 800m 1600m 850m M1 M3 Transporter Hydraulic cylinder 27.1m Carrying Path Transporter

11 11 Plan View Lateral ViewWinch Group Typical Section 127m (1023 ton) Image of Launching Girder PC Erection / Launching Girder

12 12 Daily Manpower On Site Manger / Engineer Operator Electrician / Mechanic 90 48 32 1,353 Tool Box MeetingRefreshing Shelter Worker / Etc.1,128 Supervisor / Foreman 55 Manpower Nationality Bangladesh 719 Thailand 84 India 219 Pakistan 25 Philippines 35 1,353 China / Etc. 271 Worker Camp Progress / Manpower

13 13 SEGMENT PRODUCTION YARDSEGMENT TRANSPORTATION SEGMENT ERECTIONMAIN BRIDGE 1 SPAN 24 Progress

14 14 CON’C BATCH PLANT ABUTMENT BORED PILE CRESCENT BRIDGE 1 BRIDGE PIER HEAD Progress

15 15 THANK YOU