Presentation is loading. Please wait.

Presentation is loading. Please wait.

Overview and Operations of FITSAT-1 (NIWAKA) RAST2013 Istanbul 13 th June, 2013 Takushi Tanaka FITSAT-project Fukuoka Institute of Technology

Similar presentations


Presentation on theme: "Overview and Operations of FITSAT-1 (NIWAKA) RAST2013 Istanbul 13 th June, 2013 Takushi Tanaka FITSAT-project Fukuoka Institute of Technology"— Presentation transcript:

1 Overview and Operations of FITSAT-1 (NIWAKA) RAST2013 Istanbul 13 th June, 2013 Takushi Tanaka FITSAT-project Fukuoka Institute of Technology http://www.fit.ac.jp/~tanaka/fitsat.shtml

2 Missions of NIWAKA  High-speed transmission (5.84GHz, 115.2kbps)  Twinkle as an artificial star (first experiment)

3 Freq. = 5.84GHz RF-output = 2W DC-input = 15W Speed = 115.2kbps Band width = 300kHz Modulation: FSK (±50kHz)  First Mission: 5.8GHz module (Logical Product. Corp.)

4  Second Mission: Morse code mode, 10Hz mode

5 Green:230W Red:160W

6 Communication System

7 Antennas of NIWAKA 437MHz 1.26GHz 5.84GHz

8 Structures of NIWAKA Cutting square pipe Top panel (+Z) Camera Hole

9 Side and Bottom Side (-Y) Bottom panel (-Z) Camera Hole

10 Batteries Rithium-ion battery (maxell INR18650PB2G) 1450mAH (sigle+3series) 3 ~ 4 V, max 25 A

11 Solar cells  2 cells x 4 sides (+X,+Y,-X,-Y) 4.7 V x 0.49 A ≒ 2.3 W (each side)

12 CPU board RX-CPU, TX-CPU, Power controller, Sensor amp.

13 Inside (+X)

14 Inside(-Y)

15 Inside(-Z) 1.26GHz RX(behind –Z panel) 437MHz Ant. Flight Pin Neogi.magnet behind PCB

16 Orbit and Posture (North path) 437MHz Ant. stands vertically. (South path) 5.8GHz Ant. faces to the ground st.

17 Ground Station 5.8GHzLNB 437MHz, 1.26GHz Yagi Antenna Parabola with Telescope

18 Beam Pattern 5.8G Patch 5.8G Parabola 435M Yagi

19 Tanegashima Isrand to ISS 2012.7.21

20

21

22 Deployment: 5 th Oct. 2012, 00:44

23

24

25 Pictures from NIWAKA  First Picture

26

27

28

29

30

31

32

33

34 ドイツ Bochum Observatory AMSAT-DL team

35

36

37 LED light from NIWAKA

38

39 (Ebina City, Kanagawa Pref.)

40 (Mikame Town, Nishiyo City, Ehime Pref.)

41

42

43 (Dec. 14, 2012, Tadashi HAYASHI, Toyama Science Museum)

44 Telemetry by beacon Temperatures around full sunshine by Colin, VK5HI

45 Voltage and Current around flashing LED Current of Voltage of 3 cell batteries 16 th Jan. 2013 (6 sec sampling)

46 Temperatures around flashing LED from shade to sunshine (1 cycle around the world) 1 st Feb. 2013 (1 min. sampling) Current 3 cell batt. Voltage 3 cell batt.

47 Strength of beacon signal  Changing sig. strength (437.250MHz,CW) 3 rd Nov. 2012

48 Joachim Köppen DF3GJ Observatoire de Strasbourg T = 28.5 sec 8 th Nov. 2012

49 Voltage change of solar cells 6 th Nov. 2012 (3 sec sampling) 33秒で Z 軸中心に回転 X → Y → -X → -Y (left rotation) T = 33 (sec)

50 Voltage change of solar cells T = 12.3 (sec) 8 th Feb. 2013 (1 sec sampling)

51 Rotation around Z-axis Rotation Period Energy

52 Please watch NIWAKA light ! Send me report! You will receive verification card:

53


Download ppt "Overview and Operations of FITSAT-1 (NIWAKA) RAST2013 Istanbul 13 th June, 2013 Takushi Tanaka FITSAT-project Fukuoka Institute of Technology"

Similar presentations


Ads by Google