1 LCG-France Vincent Breton, Eric Lançon and Fairouz Malek, CNRS-IN2P3 and LCG-France ISGC Symposium Taipei, March 27th 2007

2 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 2 LCG-France Project Goals  Setup, develop and maintain a LCG Tier-1 and an Analysis Facility at CC-IN2P3  Promote the creation and coordinate the integration of Tier-2/Tier-3 french sites into the LCG collaboration Funding  national funding for tier-1 and AF  Tier-2s and tier-3s funded by universities, local/regional governments, hosting laboratories, … Organization  Started in June 2004  Scientific and technical leaders appointed, management board (executive) and overview boards in place since then

3 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 3 LCG-France sites

4 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 4 LCG France contribution (October 2005 - September 2006) EGEE « CPU accounting » per EGEE region  French contribution includes LCG-France sites

5 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 5 sites contribution to LCG France (September 2005 - October 2006) « CPU accounting » per site for all EGEE Virtual Organizations

6 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 6 Tier-1 Contribution Planned contribution of LCG-France Tier-1  % of required resources for all tier-1s in 2008 Source: Comparison of New Requirements with Current Pledges – 24/10/2006Comparison of New Requirements with Current Pledges

7 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 7 Tier-1 Contribution (cont.) Planned contribution of LCG-France tier-1  % of required resources in all tier-1s in 2008 (to be finalized)

8 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 8 Tier-2s Contribution

9 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 9 Tier-1 Planned Evolution Increase rate over the period 2006-2010: CPU: x 17 DISK: x 16 MSS: x 18 Increase rate over the period 2006-2010: CPU: x 17 DISK: x 16 MSS: x 18

10 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 10 Tier-2s Planned Evolution Roughly equivalent to the planned Tier-1 CPU capacity the same year 43% of the planned Tier-1 disk capacity the same year

11 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 11 Tier-3s: Planned Evolution Data for IPNL (Lyon) are not included

12 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 12 Tier-2/Tier-3 Activities Coordination of LCG-France tier-2/tier-3 technical activities officially set up in April 2006  Frédérique Chollet is leading the group  Collaboration tools in place  Mailing list, wiki pages, regular video-conference meetings Activities  Very active in the Quattor working group  Used by most of the LCG-France sites  Network-level and SRM-level data transfer tests from and to tier-1  Including associated foreign sites (more on this later)  Meetings held with several potential hardware providers  Sharing of technical and commercial information (hardware evaluation results, commercial conditions, etc.)

13 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 13 Tier-2/Tier-3 Activities (cont.) In close contact with some foreign associated tier-2s  Europe  Belgium CMS Tier-2  Romanian Federation ATLAS Tier-2  Asia  IHEP China - ATLAS and CMS Tier2  ICEPP Japan - ATLAS Tier2

14 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 14 Tier-1: site overview Site BDII VO Box VO LHC Computing Element Computing Element Storage Element Storage Element VOMS 4 VOs LFC Central Biomed HPSS DCACHE Storage Element SRM Gridftp XFS Stockage BQS Anastasie WN Calcul LFC Local 4 VOs LHC FTS 4 VOs LHC MonBox 4 Sites Système d’informatio n de la grille VO Box VO LHC V OBox VO LHC VO Box VO LHC Service global Service régional/fédéral Service local Courtesy of Pierre Girard

15 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 15 Tier-1: site overview (cont.) Operating also several grid services for non- LHC VOs

16 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 16 Tier-1 Contribution in 2006 CPU time contributed by the french tier-1 in 2006  % of CPU time (grid and non-grid) used by the experiments in all the tier-1s The CC-IN2P3 contribution to the global effort in 2006 was 10% of the total CPU used by the 4 experiments in all the tier-1s. Source: WLCG Accounting Report Tier-1 Centres + CERNWLCG Accounting Report Tier-1 Centres + CERN

17 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 17 Tier-1 Contribution in 2006 (cont.) CPU utilisation by LHC experiments at all the tier-1s and at CC-IN2P3 Source: http://www3.egee.cesga.es/gridsite/accounting/CESGA/tier1_view.htmlhttp://www3.egee.cesga.es/gridsite/accounting/CESGA/tier1_view.html All Tier-1s (does not include non-grid usage of some sites) CC-IN2P3 (grid and non-grid)

18 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 18 Tier-1: grid vs. non-grid usage Site usage (grid vs. non-grid) greatly varies from one experiment to another  Both in terms of consumed capacity and number of jobs

19 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 19 Tier-1: efficiency (CPU time vs. wallclock) Measurement error.

20 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 20 Tier-1: CPU planned vs. actual consumption

21 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 21 Tier-1: CPU capacity delivered Several service interruptions in august and september due to problems with the cooling or power infrastructure 4 days-long scheduled complete shutdown of the site for replacing some central electric equipement

22 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 22 Tier-1: storage delivered Disk storage capacity  Delivered 34% (180 TB out of 520 TB planned)  More on this later Tape storage capacity  Installed capacity (as planned) of 535 TB (of which 73% was actually used)

23 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 23 Tier-1: data transfer exercises CERN → CC-IN2P3 (disk)  April 2006 CERN → CC-IN2P3 (MSS)  April 2006 Target: 200 MB/sec Target: 75 MB/sec

24 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 24 Tier-1: site availability Source: http://lcg.web.cern.ch/LCG/MB/availability/site_reliability.pdfhttp://lcg.web.cern.ch/LCG/MB/availability/site_reliability.pdf

25 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 25 Tier-1: capacity increase in 2006 CPU  +265 worker nodes (IBM, dual- processor dual-core AMD Opteron 275, 2.2 GHz, 2 GB/core, 290 GB internal disk)  Theoretical power: 1573 SI2000 per core  Total: 1,6 M SI2000  Observed power with typical applications is ~30% less than theoretical Disk storage  +400 TB of rack-mounted Sun Fire X4500 (aka Thumper)

26 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 26 Tier-1: capacity increase in 2006 (cont.) Tape storage  Call for tender for a new cartridge library  Selected Sun/StorageTek SL8500  30 T10000 drives  10 LTO-3 drives  Will progressively replace the current one  6 silos  Installation started in January  Expected to be finished by end of april 2007

27 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 27 Tier-1: capacity increase in 2006 (cont.) Databases  Reconfiguration of Oracle cluster  Extensible hardware architecture  +1 TB added to the dedicated SAN (2 TB total)  +3 front-end database servers (5 total)  2 of them will share the load of the LHC experiments International connectivity  Dedicated link CC-IN2P3↔CERN 10 Gbps  2 x 1 Gbps links CC-IN2P3 ↔ Fermilab

28 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 28 Hardware procurement Procurement process (evaluation, publication, selection) is more or less under control  Delivery delays are not!  In 2006, we suffered delivery delays of several months for some equipment  A fraction of the equipment is still not delivered! Procurement of equipment is an issue  Several constraints: space in the machine room, budget constraints, delivery delays, requested availability, …

29 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 29 Facility Upgrade Major effort for upgrading the electric and cooling infrastructure of the site  Currently reaching the limits of the installation  When the current works will be finished (april 2007)  from 500 kW to 1000 kW usable for computing equipement Courtesy of Dominique Boutigny Average total electrical power monthly consumption

30 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 30 Facility Upgrade (cont.) Scheduled 4 days-long complete shutdown of the site in December 2006 for replacing central electric equipment  Vital services (network equipment, mail servers, web servers, Oracle, FTS, LFCs, VOMS,…) were kept alive by ad hoc means)  Extensive use of virtual machines  Others services have been switched to partner sites  CIC Portal was hosted by CNAF during the shutdown and switched back to CC-IN2P3 afterwards  Failover procedure tested in real conditions

31 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 31 Plans for 2007 Tier-1  Consolidate current grid services and integrate them into « normal » operations  Works towards the stability desired not only by the experiments but by the people operating the services  Increase network bandwidth with tier-2s and backup link to other tier- 1s through FZK  Increase the rythm of the new machine room building project planned for 2009 Tier-2s/Tier-3s  Improve availability of the sites  Keep exercising the data transfer infrastructure All  Make sure site administrators understand the ways data will be accessed (!)

32 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 32 Conclusions Participating sites are very motivated to contribute to this project…  … but it is harder than most of us expected Ramp up plans of sites are rather aggressive  Several constraints don’t really make our life easier Operating the grid services in their current status is complex and requires (highly competent and motivated) people

33 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 33 For more information LCG-France website http://lcg.in2p3.frhttp://lcg.in2p3.fr LCG-France T2-T3 Technical coordination wiki page:http://lcg.in2p3.fr/wiki/index.php/T2- T3http://lcg.in2p3.fr/wiki/index.php/T2- T3 CC-IN2P3: http://cc.in2p3.frhttp://cc.in2p3.fr LCG-France Tier-1 resource planning  https://edms.in2p3.fr/document/I-004736 https://edms.in2p3.fr/document/I-004736 LCG-France Tier-2s resource planning  https://edms.in2p3.fr/document/I-008142 https://edms.in2p3.fr/document/I-008142

34 V. Breton, E. Lançon and F. Malek, ISGC symposium, March 27th 2007, Taipei 34 Aknowledgments Thanks to the people that contributed material to this talk  Most of the slides are taken from Fabio Hernandez talk at WLCG Collaboration Workshop (CERN, January 22nd 2007)  Special thanks to Eric Lançon and Fairouz Malek