Presentation is loading. Please wait.

Presentation is loading. Please wait.

Parkside Development Standards Colorado Springs Together Offices Monday, September 24, 2012 Tuesday, September 25, 2012.

Similar presentations


Presentation on theme: "Parkside Development Standards Colorado Springs Together Offices Monday, September 24, 2012 Tuesday, September 25, 2012."— Presentation transcript:

1 Parkside Development Standards Colorado Springs Together Offices Monday, September 24, 2012 Tuesday, September 25, 2012

2 Building Types Original DP specified which lots were planned to have each of the following building types: A - Ranch B - Bi-Level C - Tri-Level D - Two-Story For rebuilding purposes: The same type of home shown on the DP may be constructed; If a different building type was constructed than was shown on the plan, that non-conforming home may be rebuilt; A building type with a lower height may be built without formal City action; or A building type with a higher roof may be allowed with additional City review and neighborhood notification Basements will not be required or restricted

3 Building Setbacks Rear Yard Setbacks Adjacent to Flying W Ranch or Champagne – 30 ft. Adjacent to Majestic, Lions Gate, Hot Springs or Mirror Lake – 12 ft. Not adjacent to public streets – 10 ft. Front Yard Setbacks 18 ft. minimum driveway depth from curb* 5 ft. minimum structure setback from property line Side Yard Setbacks 5 ft. (10 ft. separation from adjacent structures) *Certain lots within Filing 5 are allowed a 16 ft. driveway depth

4 Lot Coverage and Height Maximum lot coverage allowance for the Parkside development is 40%* Lot coverage pertains to the square footage of any structure having a roof or decks that are 8 ft. above grade Maximum height is 30 ft. using non- hillside methodology *Certain lots within Filing 5 are allowed 45%

5 Patios and Decks Follow existing Codes and regulations: Under 18 in. from grade – may encroach into any front, side or rear setback 18 in. or higher – must meet the setbacks of the zone district Covered decks count toward the lot coverage allowance and are not permitted to encroach into setbacks 18 in.

6 Questions? Call or email: – Kyle Campbell, Interim Planning Director (719) 385-5360 kcampbell@springsgov.com – Erin McCauley, Planner II at the Land Use Review Division (719) 385-5369 or emccauley@springsgov.com


Download ppt "Parkside Development Standards Colorado Springs Together Offices Monday, September 24, 2012 Tuesday, September 25, 2012."

Similar presentations


Ads by Google