Presentation is loading. Please wait.

Presentation is loading. Please wait.

Group E. .1.1.1-Project Goals 1.1.2-Scope Definition. 1.1.3-Project milestones. 1.1.4-Assumption,Constrains&Dependencies. 1.1.5-Project risks. 1.1.6-Project.

Similar presentations


Presentation on theme: "Group E. .1.1.1-Project Goals 1.1.2-Scope Definition. 1.1.3-Project milestones. 1.1.4-Assumption,Constrains&Dependencies. 1.1.5-Project risks. 1.1.6-Project."— Presentation transcript:

1 Group E

2

3

4 .1.1.1-Project Goals 1.1.2-Scope Definition. 1.1.3-Project milestones. 1.1.4-Assumption,Constrains&Dependencies. 1.1.5-Project risks. 1.1.6-Project Organizational Structure and communication strategy. 1.1.7- Project Cost estimate and source of funding.

5

6 A)Schedule:-

7 Schedule (continue):-

8 B)Fast track:-

9 Fast track (continue):-

10

11 Cost (continue):-

12

13

14

15 5.1-Risk Management planning. 5.1.1-objective. 5.2-Risk Breakdown Structure. 5.3-Risk Identification.

16 5.4-Risk Assessment. 5.4.1-Qualitive risk Analysis. 5.4.1.1-Initial Risk priorities. 5.4.2-Quantitive Risk Analysis. 5.5-Risk Response:- 5.6-Risk monitor and controlling.

17 6.1-Definitions. 6.2-Purpose and scope. of Project quality system. 6.3-Quality management (requirements - responsibility):-

18 6.4-Responsibility foe each stakeholders:- 6.4.1-Project Manager. 6.4.2-Quality control Manager. 6.4.3-Quality engineer. 6.5-Quality Control:- 6.5.1-Project Activities. 6.5.1.1- mobilization. 6.5.1.2-Excavation for foundation. (Before execution-During execution-after execution) 6.5.1.3-Backfilling (Material soil compaction)

19 6.5.4-Formwork. 6.5.5 -Steel reinforcement (steel properties). 6.5.6-Concrete work. 6.5.6.1-Before execution.(Cement-water-reinforcing steel). 6.5.6.2-During Transportation. 6.5.6.2.1-transportation of concrete. 6.5.6.2.2-methods of transportations (truck mixer-pump) 6.5.6.3-During Execution (fresh concrete tests-slump test- placing of concrete-additives or admixtures) 6.5.6.4-After execution(hardened concrete test- compaction of concrete-curing of concrete-control on hardened concrete).

20 6.5.7-Masonary work (Mortar) 6.5.8-Painting and clear finishing. 6.5.8.1-painting surface 6.5.8.2-painting. 6.4-Quality Assurance. 6.5-Corrective reaction &prevention reaction.


Download ppt "Group E. .1.1.1-Project Goals 1.1.2-Scope Definition. 1.1.3-Project milestones. 1.1.4-Assumption,Constrains&Dependencies. 1.1.5-Project risks. 1.1.6-Project."

Similar presentations


Ads by Google