Presentation is loading. Please wait.

Presentation is loading. Please wait.

PI at NB Power Presented by Steve Boyko. Introduction About NB Power Our PI history Current PI status Specific PI applications Future PI applications.

Similar presentations


Presentation on theme: "PI at NB Power Presented by Steve Boyko. Introduction About NB Power Our PI history Current PI status Specific PI applications Future PI applications."— Presentation transcript:

1 PI at NB Power Presented by Steve Boyko

2 Introduction About NB Power Our PI history Current PI status Specific PI applications Future PI applications Observed benefits Conclusions & questions About NB Power Our PI history Current PI status Specific PI applications Future PI applications Observed benefits Conclusions & questions

3 New Brunswick

4 About NB Power Founded in 1920 Provincially owned (crown corporation) 2500 employees 6,600 km transmission lines Serves over 300,000 customers Net generation - 4119 MW $1.2 billion sales in 1998-1999 15 generating stations: nuclear, oil, Orimulsion tm, coal, gas turbine, hydro Founded in 1920 Provincially owned (crown corporation) 2500 employees 6,600 km transmission lines Serves over 300,000 customers Net generation - 4119 MW $1.2 billion sales in 1998-1999 15 generating stations: nuclear, oil, Orimulsion tm, coal, gas turbine, hydro

5 NB Power Today Increasing challenges... Transmission deregulation Increasing competition Increasing challenges... Transmission deregulation Increasing competition

6 NB Power Today … create a need for: Paying down debt Greater efficiencies Emphasis on the “bottom line” … create a need for: Paying down debt Greater efficiencies Emphasis on the “bottom line”

7 Deregulation Transmission has been partially deregulated Generators can sell “through” or “out” but not “in” Division into business units: > Generation > Nuclear > Transmission & Distribution > Customer Service & Marketing Transmission has been partially deregulated Generators can sell “through” or “out” but not “in” Division into business units: > Generation > Nuclear > Transmission & Distribution > Customer Service & Marketing

8 NB Power’s PI History First PI installation 1992 in new Belledune generating station: > PI 2 system provided by Westinghouse > 20,000 points First PI installation 1992 in new Belledune generating station: > PI 2 system provided by Westinghouse > 20,000 points

9 NB Power’s PI History Bulk tag purchase made in spring 1999 as Year 2000 replacement and standardization of historian platforms Four new PI servers installed in summer 1999 > three power plants > Energy Control Center Belledune PI 2 server to be upgraded to PI 3 in April 2000 Bulk tag purchase made in spring 1999 as Year 2000 replacement and standardization of historian platforms Four new PI servers installed in summer 1999 > three power plants > Energy Control Center Belledune PI 2 server to be upgraded to PI 3 in April 2000

10 Current PI Status 65,000 tags across five servers 87 ProcessBook users 76 DataLink users Users access servers locally and across our WAN Applications growing.. 65,000 tags across five servers 87 ProcessBook users 76 DataLink users Users access servers locally and across our WAN Applications growing..

11 Specific PI Applications Shared ProcessBooks Transmission system monitoring Opacity monitoring Web page captures Web applications Equipment running hours tracking Report scheduling Electricity marketing Shared ProcessBooks Transmission system monitoring Opacity monitoring Web page captures Web applications Equipment running hours tracking Report scheduling Electricity marketing

12 Shared ProcessBooks Plants and business units have developed their own and most share them across our WAN General process overviews, trends Plants and business units have developed their own and most share them across our WAN General process overviews, trends

13 Coleson Cove Unit 2

14 Dalhousie Scrubber

15 Dalhousie Unit 2 Cycle

16 Transmission Monitoring NB Power oversees the Maritime Control Area Standards for responding to loss of load or generation NB Power is responsible for maintaining 60 Hz frequency on grid We adjust the frequency by raising/lowering load on units PI used to demonstrate compliance, prepare reports NB Power oversees the Maritime Control Area Standards for responding to loss of load or generation NB Power is responsible for maintaining 60 Hz frequency on grid We adjust the frequency by raising/lowering load on units PI used to demonstrate compliance, prepare reports

17 Frequency Control

18 Opacity Monitoring Provincial regulations stipulate that our Dalhousie plant must report an exceedance if we exceed 20% opacity in any 4 minutes of a 20 minute period > Very difficult to calculate using DCS > Many spikes due to rapping Solution - PI-API! Provincial regulations stipulate that our Dalhousie plant must report an exceedance if we exceed 20% opacity in any 4 minutes of a 20 minute period > Very difficult to calculate using DCS > Many spikes due to rapping Solution - PI-API!

19 Opacity Monitoring NT service written in C Runs on PI server Tracks opacities for each unit Should an exceedance occur, it > generates a report of opacities during the period > alarms the unit operator NT service written in C Runs on PI server Tracks opacities for each unit Should an exceedance occur, it > generates a report of opacities during the period > alarms the unit operator

20 Opacity Monitoring

21 Web Page Captures Our Generation Marketing group requires market information to make energy purchases and sales Current information is generally available on the Internet Historical information is either lacking or poorly organized Solution - put it in PI! Our Generation Marketing group requires market information to make energy purchases and sales Current information is generally available on the Internet Historical information is either lacking or poorly organized Solution - put it in PI!

22 This...

23 … becomes this!

24 Web Page Captures Software written using Visual Basic and PI-API Captures web pages at predetermined intervals Scans page source for certain strings, e.g. “Current Cleveland Weather via PI” Downside - dependent on page format not changing Software written using Visual Basic and PI-API Captures web pages at predetermined intervals Scans page source for certain strings, e.g. “Current Cleveland Weather via PI” Downside - dependent on page format not changing

25 OSI DevNet The DevNet home page shows the current temperature in Cleveland Easy to capture and put into PI The DevNet home page shows the current temperature in Cleveland Easy to capture and put into PI

26 OSI DevNet Current Cleveland Weather via PI Temp. 39 F Humidity 57 % Wind 2 MPH

27 Cleveland Weather in PI

28 Web Applications Some users require only a snapshot of the process DataLink or ProcessBook is overkill Solution - Web pages on Intranet via PI-API Some users require only a snapshot of the process DataLink or ProcessBook is overkill Solution - Web pages on Intranet via PI-API

29 Sample Web Page More links Links

30 Equipment Running Hours Machinery needs periodic maintenance (lubrication, vibration testing, etc.)

31 Equipment Running Hours Done in past with PIM (Periodic Inspection and Maintenance) work orders > Time-consuming > Manpower-intensive Current maintenance done on a running hours basis Some equipment not attached to DCS Solution - PI with manual entry Done in past with PIM (Periodic Inspection and Maintenance) work orders > Time-consuming > Manpower-intensive Current maintenance done on a running hours basis Some equipment not attached to DCS Solution - PI with manual entry

32 Equipment Running Hours Modern plants can calculate running hours from DCS points Older plants perform manual entry into PI using Manual Point Data Entry Control Visual Basic program (using PI-API) to extract data from PI Microsoft Access front-end for users Modern plants can calculate running hours from DCS points Older plants perform manual entry into PI using Manual Point Data Entry Control Visual Basic program (using PI-API) to extract data from PI Microsoft Access front-end for users

33 Report Scheduling Needed automatic report generation solution Replacement for ReportWriter and other reporting systems Want to email reports to save paper Solution - Visual Basic and PI-DataLink Needed automatic report generation solution Replacement for ReportWriter and other reporting systems Want to email reports to save paper Solution - Visual Basic and PI-DataLink

34 Report Scheduling An NT service monitors: date/time digital trigger points Loads Excel spreadsheets (with PI-DataLink calls) Prints and/or emails them Visual Basic front-end for configuration An NT service monitors: date/time digital trigger points Loads Excel spreadsheets (with PI-DataLink calls) Prints and/or emails them Visual Basic front-end for configuration

35 Electricity Marketing NB Power sells energy to Eastern Canada and into the New England power market Our Marketing group uses PI to track energy prices actual sales unit availability air temperatures billing NB Power sells energy to Eastern Canada and into the New England power market Our Marketing group uses PI to track energy prices actual sales unit availability air temperatures billing

36 Outage Costing Unit outages (trips) result in: increased fuel cost for replacement power lost revenue and/or opportunities Marketing uses PI to tie lost megawatts and lost sales together to put a dollar value on an outage Unit outages (trips) result in: increased fuel cost for replacement power lost revenue and/or opportunities Marketing uses PI to tie lost megawatts and lost sales together to put a dollar value on an outage

37 Outage Costing PI provides critical information: actual costs of an outage cost of restoring unit quickly vs. lost revenue/opportunities PI provides critical information: actual costs of an outage cost of restoring unit quickly vs. lost revenue/opportunities

38 PI Applications Shared ProcessBooks Transmission system monitoring Opacity monitoring Web page captures Web applications Equipment running hours tracking Report scheduling Electricity marketing Use of PI-API, DataLink, ProcessBook Shared ProcessBooks Transmission system monitoring Opacity monitoring Web page captures Web applications Equipment running hours tracking Report scheduling Electricity marketing Use of PI-API, DataLink, ProcessBook

39 The Future Integration of more stand-alone systems (interfaces) Performance monitoring Investigate other products: PI-BatchView PI-ActiveView SAP integration? More Internet applications More PI servers Integration of more stand-alone systems (interfaces) Performance monitoring Investigate other products: PI-BatchView PI-ActiveView SAP integration? More Internet applications More PI servers

40 Observed Benefits Much more data stored Unifies diverse data stores Widely accessible Faster and easier analysis Much more data stored Unifies diverse data stores Widely accessible Faster and easier analysis

41 Conclusions PI selected as standard historian platform for NB Power Provides a robust platform on which to build applications Endless applications... PI selected as standard historian platform for NB Power Provides a robust platform on which to build applications Endless applications...

42 Questions


Download ppt "PI at NB Power Presented by Steve Boyko. Introduction About NB Power Our PI history Current PI status Specific PI applications Future PI applications."

Similar presentations


Ads by Google