23 October 2001 RRB-131 Draft Budget for CMS M&O and C&I in 2002 Draft Budget for CMS Maintenance & Operation and Commissioning & Integration in the Year.

Similar presentations


Presentation on theme: "23 October 2001 RRB-131 Draft Budget for CMS M&O and C&I in 2002 Draft Budget for CMS Maintenance & Operation and Commissioning & Integration in the Year."— Presentation transcript:

1 23 October 2001 RRB-131 Draft Budget for CMS M&O and C&I in 2002 Draft Budget for CMS Maintenance & Operation and Commissioning & Integration in the Year 2002 D. Blechschmidt (CMS Resources Manager)

2 23 October 2001 RRB-132 Draft Budget for CMS M&O and C&I in 2002 This document is submitted in response to a request by the CMS Resources Review Board of April 2001 It summarizes the estimated payments that the CMS Collaboration will have to make in 2002 for Maintenance & Operations (M&O) and for Commissioning & Integration (C&I) for Category A items only

3 23 October 2001 RRB-133 Draft Budget for CMS M&O and C&I in 2002 This document further shows the proposed sharing of contributions by Funding Agency to cover the M&O costs and This document also invites the RRB to consider how to meet the C&I costs

4 23 October 2001 RRB-134 Draft Budget for CMS Construction in 2002 1. Cost Estimates and Breakdown The Costs were estimated by the Collaboration (MOTF+CERN) These Estimates were checked by the RRB Scrutiny Group (SG) The SG recommended to clearly separate these costs into :  M&O = recurrent, and work in or near experimental vault  C&I = non-recurrent, required up to end 2006, for activities in mounting and test areas, far from the experimental vault

5 23 October 2001 RRB-135 Draft Budget for CMS Construction in 2002 For CMS, the C&I costs in the year 2002 mainly arise from unpredictable circumstances, such as those caused by delays in civil engineering of the experimental area, or by inevitable changes to the detector mounting & integration scheme

6 23 October 2001 RRB-136 Draft Budget for CMS Construction in 2002 2. Cost Categories In accordance with the procedure established for the LEP Programme, M&O costs are broken down into :  Category A = costs to be covered by the Collaboration as a whole  Category B = sub-detector specific costs to be covered by the participating Institutions  Category C = costs covered by CERN as the Host Institute in accordance with Annex 11 of the MoU for Construction

7 23 October 2001 RRB-137 Draft Budget for CMS Construction in 2002 All the costs presented herein are of Category A only, as defined by CERN and agreed by the SG Category B estimates are not presented as these cannot be reliable at this stage (most equipment is still with Institutes) Category C will, as in the past, be covered by CERN cf. Annex 11 of the CMS-MoU

8 23 October 2001 RRB-138 Draft Budget for CMS Construction in 2002 3. Estimated Costs and Proposed Sharing The cost sharing for M&O and C&I has been determined in proportion to the registered number of PhD physicists supported by a particular Funding Agency In order to cover the estimated M&O and C&I costs as shown in Annex 1 it is proposed to raise, as of early 2002, the contributions as shown in Annex 2 These contributions would be paid into a special fund that is operated like the Common Funds for Construction

9 23 October 2001 RRB-139 Draft Budget for CMS M&O and C&I in 2002

10 23 October 2001 RRB-1310 Draft Budget for CMS M&O and C&I in 2002 Totals [kCHF] 29.7 52.0 17.3 146.2 101.6 17.3 2.5 9.9 27.3 32.2 106.6 94.2 37.2 66.9 59.5 381.7 76.8 29.7 22.3 7.4 337.1 166.0 62.0 2860 42.1 22.3 19.8 44.6 74.4 750.9 Share in C&I [kCHF] 19.0 33.3 11.1 93.6 65.0 11.1 1.6 6.3 17.4 20.6 68.2 60.3 23.8 42.8 38.1 244.2 49.2 19.0 14.3 4.8 215.7 106.2 39.6 27.0 14.3 12.7 28.5 47.6 480.5 1830 Share in M&O [kCHF] 10.7 18.7 6.2 52.7 36.6 6.2 0.9 3.6 9.8 11.6 38.4 33.9 13.4 24.1 21.4 137.5 27.7 10.7 8.0 2.7 121.4 59.8 22.3 15.2 8.0 7.1 16.1 26.8 270.4 1030 Share [%] 1.0 1.8 0.6 5.1 3.6 0.6 0.1 0.3 1.0 1.1 3.7 3.3 1.3 2.3 2.1 13.3 2.7 1.0 0.8 0.3 11.8 5.8 2.2 1.5 0.8 0.7 1.6 2.6 26.3 100 Users with PhD 12 21 7 59 41 7 1 4 11 13 43 38 15 27 24 154 31 12 9 3 136 67 25 17 9 9 8 18 30 303 1154 Regis- tered Users 23 45 26 159 48 8 2 5 43 32 99 92 28 43 39 281 60 20 21 19 239 83 40 50 15 16 10 20 79 466 2111 AUS BEL BUL CERN CHI CRO CYP EST FIN FR-C FR-I GER GRE HUN IND ITA KOR PAK POL POR RUS DMS SPA SW-E SW-P SW-U TAI TUR UK US Totals

11 23 October 2001 RRB-1311 Draft Budget for CMS Construction in 2002 RECOMMENDATION The RRB is invited to agree to the proposed M&O expenditure in 2002, and to the sharing of this expenditure amongst the CMS Funding Agencies The RRB is further invited to recognize the C&I needs for the year 2002, and to consider how these should shared amongst the CMS Funding Agencies

12 23 October 2001 RRB-1312 Draft Budget for CMS Construction in 2002