Presentation is loading. Please wait.

Presentation is loading. Please wait.

DISTRICT AIDS PREVENTION AND CONTROL UNIT District AIDS Prevention and Control Unit Office of the CMOH(PH Branch) Administrative Building Jalpaiguri District.

Similar presentations


Presentation on theme: "DISTRICT AIDS PREVENTION AND CONTROL UNIT District AIDS Prevention and Control Unit Office of the CMOH(PH Branch) Administrative Building Jalpaiguri District."— Presentation transcript:

1 DISTRICT AIDS PREVENTION AND CONTROL UNIT District AIDS Prevention and Control Unit Office of the CMOH(PH Branch) Administrative Building Jalpaiguri District Hospital Jalpaiguri

2 Facilities in the Dist. Number of Facilitie s No. of Facilities Working TI NGO’s11 Link Worker project 11 ICTCs15 Blood Banks22 Blood Storage units 41 STI Clinics22 ART Centre00 Link ART Centre 33 CCC11 SRL00 Name of the NGOsType of Program Covering AreaEstimated Population Gana Unnayan Porisad (Tracker’s -Fulbari) TI-NGO Working on HRG’s (Truck driver & Helper) Fulbari Truck terminal10000 Bharuka PWTCommunity Care Center Care and Support Of HIV +ve People, Mohitnagar Bed Capacity 10 CINILink Workers Scheme Project Office at Assrampara Siliguri Darjeeling Working on 10 GP Jalpaiguri District Jalpaiguri HRIDAYPPTCT Program Project Office at Ukilpara Jalpaiguri Working in the reactive ANC Mothers in Jalpaiguri District, 2

3 District Category Cumulative PLHA ever registered at ART centers ( As on Feb’13) Cumulative Number of patients ever started on ART (As on Feb’13) Cumulative Number of PLHA alive & on ART (As on Feb’13) AdultChildren JalpaiguriB2015111272618 Cumulative number of PLHIV of Jalpaiguri District,ever register at ART Centre as on Feb’13

4 HIV Positive Status of Jalpaiguri District 2012-2013 Sl. No. Year Number of TestFound PositivePercentage (%) General (HRG + Male+Female) ANC General (HRG + Male+Female) ANC General (HRG + Male+Female) ANC 1 2010-2011 (Apr’10- Mar’11) 213892551.21% 2 2011-2012 (Apr’11- Mar’12) 1268214480298172.35%0.12% 3 2012-2013 (Apr’12- Mar’13) 1308523585229341.75%0.15% Total (Apr’10 to Mar 2013) 852218331.00%

5 Indicators Annual Target Apr-12May-12Jun-12 Jul- 12 Aug-12Sep-12Oct-12 Nov- 12 Dec-12Jan-13Feb-13Mar-13 Total Total Number of clients tested for HIV (Male + Female + HRG) 3149587710551246146314151020958101795989910061170 13085 ANC tested in all the ICTCs 29426171022132159207522332266175518982032174218221680 23585 Number of Client found HIV reactive (Male + Female + HRG) 2227253017188101918 17 229 ANC client found HIV reactive 842523011431 34 Data Sources from the Monthly CMIS Data of the ICTC Unit of Jalpaiguri HIV Testing Scenario for the 2012-13

6 Monthly HIV Testing & positive Status of general client in 2012-13

7 Monthly HIV Testing & positive Status of ANC client in 2012-13

8 Unit Name Testingpositive TB/HIV Co- infected General ClientANC General ClientANC Rajganj1010 303 4 DH ICTC44150620 3 ANC10330167 0 Maynaguri408405681 1 Dhupguri9701998271 9 Falakata6672884106 6 MAL8951125192 2 Birpara14302229131 0 Alipurduar17693616439 1 Kamakhyaguri6761881104 0 Uttarlatabari12713710 0 Sulkapara594111600 0 Madarihat8417400 0 Jashodanga305800 0 Jalpaiguri HRIDAY0000 0 Total 130852358522934 26 Yearly HIV Testing & positive Status with Co-infected in 2012-13

9 Graphical presentation of Yearly HIV Testing & positive Status with Co-infected in 2012-13

10 Sub- Divissoin Jalpaiguri SadarMalbazarAlipurduar Total Name of the Unit Rajg anj RH Distri ct Hospi tal ANC of DH Hrid ay CB O Mayna guri RH Dhup guri RH Mal SDH Sulkap ara F- ICTC Falak ata RH Birp ara SGH Madari hat Alipur duar SDH Kamak shyagu ri BPHC Kalch ini General Client3062608271901013043101 229 ANC Mother30701120610940 34 Total33621309282101614052141263 Positivity145 (Positivity rate is 1.00%) 21 (Positivity rate is 1.06%) 96 (Positivity Rate is 0.9%) Positivity Rate of th District in this Year 2012-13 is 0.75% (Where the ANC Positivity is.14% & the General Client Positivity is 1.76%) Positivity Rate of 2012-13

11 Status of Link ART Centre at Jalpaiguri District in 2012-2013 Unit Name Number of Individuals in Treatment MaleFemaleChildDeath APD SDH16500 JAL DH5301 MAL SDH2200 Total231001

12 Name of the Block Number of Sub-center WBFPT KIT Receive (1 Box = 30 Test KIT) Name of the Month:- December 2012 Name of the Month:- January 2013 Name of the Month:- February 2013 Name of the Month:- March 2013 OB Test Waste +ve Ref. ICTC CB MB OB Test Waste +ve Ref. ICTC CB MB OB Test Waste +ve Ref. ICTC CB MB OB Test Waste +ve Ref. ICTC CB MB SADAR4814400000000 3900014010 109000139201401 RAJGANJ4814400000000000000000000000000000 MAYNAGU RI 461380Not Yet Started DHUPGURI641920180120230037029315110014105463922002860546 FALAKATA441320Not Yet Started MAL51153000000005862491900318050913800037105301380003920 MATIALI226600000000 1600064406491070005420649410006080 NAGRAKA TA 2266000000005792090003700 12200030803701410003170 MADARIH AT 3711100000000000000000000000000000 APD-I36108000000009070300170 APD-II361080000000000000000 0 KALCHINI481440000000000000000 95984003970 KUMARGR AM 351050000000000000006533160003370653 Labour Ward1600 240005760 320005440 200005240544 Total5381671078014423 6130422476623 34350468912042 12662 6150 Whole Blood finger Prick Test at Sub-Centre Level in 2012-13

13 Name of the Block Number of Sub-centre WBFPT KIT Receive (1 Box = 30 Test KIT) Name of the Month:- January 2013Name of the Month:- February 2013 Opening Balance No. Of Test Done Wastage No. pf Positive/Reactive Actually reached ICTC Closing Balance No. of NB pair receive Opening Balance No. Of Test Done Wastage No. pf Positive/Reactive Actually reached ICTC Closing Balance No. of NB pair receive SADAR 120121111070 70001000 RAJGANJ 292000270 3000240 MAYNAGURI 9011000790 24000550 DHUPGURI 210200111900 350001550 FALAKATA 180160001640 200001440 MAL 1264500081010239000630 NAGRAKATA 150430001070 33000740 MADARIHAT 901000890 1000880 APD 0000000120140001060 KALCHINI 12042700710 00000 Total001115192822915010562470008090 Whole Blood finger Prick Test at DMC/TU Level in 2012-13

14


Download ppt "DISTRICT AIDS PREVENTION AND CONTROL UNIT District AIDS Prevention and Control Unit Office of the CMOH(PH Branch) Administrative Building Jalpaiguri District."

Similar presentations


Ads by Google