Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Business Operations October 27, 2011 HOUSTON INDEPENDENT SCHOOL DISTRICT Construction and Facility Services Transportation Food Services Police Business.

Similar presentations


Presentation on theme: "1 Business Operations October 27, 2011 HOUSTON INDEPENDENT SCHOOL DISTRICT Construction and Facility Services Transportation Food Services Police Business."— Presentation transcript:

1 1 Business Operations October 27, 2011 HOUSTON INDEPENDENT SCHOOL DISTRICT Construction and Facility Services Transportation Food Services Police Business Assistance Leo Bobadilla, Chief Operating Officer

2 2 Business Operations- Overview 5,000 employees supporting the work of our schools everyday. $230 million annual operating budget 30 million sq. ft. of space in over 300 locations Serve over 240,000 meals a day Drive over 12 million miles annually transporting 29,000 students Protect students/staff with a fully accredited police force with almost 200 sworn officers. $1.1 billion capital building program Insure over $3.2 billion in assets Process over 17,000 warehouse purchase orders Maintain a fleet of over 2000 vehicles

3 3 What drives us… Customer-Focused (exceed expectations) Innovative-Thinking (continuous improvement) Team-Work (together we can) Solution-Driven (no excuses) Relationship-Building (engage our stakeholders) Safety and Integrity in everything we do

4 4 Data Driven…Of course Metrics Custodial Cost per Square Foot% of work orders completed annually Custodial Workload (Sq. Ft. Per Custodian)Number of building code and fire marshal violations M&O Expenditures as % of General Fund Expenditures % of employees participating in > or = 40 hrs. of job specific professional development Maintenance Cost Per Sq. Ft.% of open positions unfilled in > 90 days Work Order Completion Time (in Days)Customer service survey results Custodial Supply Costs per Square Foot% of projects completed at or under budget Utility Usage per Square Foot% of projects completed on schedule Response time for priority 1 work orders% Minority/Women Owned Business Enterprises Participation Average completion time for priority 1 and 2 work orders Preventable versus non-preventable accidents. On-time performanceAverage Age of Fleet Miles Between AccidentsCost per District-Operated Bus Average Daily Ride TimeBus accidents per 100,000 miles

5 5 More Metrics Metrics Annual hours of training for each driver Bus operator attendance per route Route riders per mile – regular / magnet Food Services Total Costs per Revenue Route riders per mile – special educationFood Costs per Revenue Route riders per bus – regular / magnetFood Services Labor Costs per Revenue Route riders per bus – special educationFund Balance as a Percent of Revenue Miles between road calls or breakdownsAverage meals per labor hour Maximum rider trip timeBreakfast and Lunch participation rates Turnover time per bus repair% of campuses receiving 2 required site visits by City of Houston Health Inspectors Cost per route%of campuses receiving 2 documented visits by Quality Control Department Cost per student rider% of internal warehouse orders filled accurately % of state reimbursementAverage response time for priority 1 calls-Police Transportation costs as a percent of general fundSupplier On-time Delivery performance %preventive maintenance completed on time# of Campus Safety Inspections, Fire Safety Inspections, and Intruder Drills conducted Between CGCS KPI work and our local metrics we have over 200 metrics to gauge our performance.

6 6 2010-11 Highlights- By the numbers Maintenance overtime reduced by over 60%...productivity increased. ($4.3M savings) Preventative maintenance teams inputting more than 50% of all work orders. Painting cycle cut by over 50% while reducing costs. EPA Tools for Schools implementation –saving over $100k by proactively managing Indoor Air Quality. Transportation costs as a percentage of the general fund is 2.90% which is below state average of 3.32% Crime in and around schools is down by 7.8% Whole grains at lunch increased by 71% Dark green/orange vegetable servings increased by 9%

7 7 2010-11 Highlights- By the numbers Bond Work: Keeping our Promises – Planning Phase:32 projects – Design Phase:51 projects – Bid-Award Phase:20 projects – Construction Phase:61 projects – Warranty Phase:14 projects TOTAL178 projects 8 new schools opened (built to Leadership in Energy and Environmental Design (LEED) Standards) Over 8000 security cameras installed in schools. Overall M/WBE Participation (Bond): 31%

8 8 2010-11 Highlights- By the numbers

9 9 2010-11 Highlights-In Pictures Central production facility- improved quality control and ingredient control (less fat, sugar, and salt with more whole grains) Working with local farmers to bring more fresh fruits/vegetables to students New dining concept lines-more fresh, healthy choices Breakfast in the classroom- All ES and MS implementation

10 10 Grant for salad bars in schools 2010-11 Highlights-In Pictures

11 11 Multi-million dollar grant for propane buses 2010-11 Highlights-In Pictures Cost-effective, efficient and environmentally responsible operations Only school district recognized in the 100 Best Fleets in the nation

12 12 2010-11 Highlights-In Pictures Stakeholder Engagement

13 13 2010-11 Highlights-In Pictures Bus Advertising- New Revenue Source Teamwork and Employee Recognition University Of Houston, Cullen College Of Engineering/ HISD Partnership To Test Emerging Technology On Reducing Diesel Emissions

14 14 2010-11 Highlights-In Pictures New Schools/Renovations/Additions- spaces conducive to learning providing, among other features, safety enhancements, state-of-the-art technology, improved indoor air quality and energy/resource conservation.

15 15 Thank you Our students are counting on us everyday!


Download ppt "1 Business Operations October 27, 2011 HOUSTON INDEPENDENT SCHOOL DISTRICT Construction and Facility Services Transportation Food Services Police Business."

Similar presentations


Ads by Google