Presentation is loading. Please wait.

Presentation is loading. Please wait.

Load Research System Update and Timeline Report to the Profiling Working Group March 25, 2009.

Similar presentations


Presentation on theme: "Load Research System Update and Timeline Report to the Profiling Working Group March 25, 2009."— Presentation transcript:

1 Load Research System Update and Timeline Report to the Profiling Working Group March 25, 2009

2 2 Percent of Interval Data Received by TDSP

3

4 4 LRS Database Update Interval database was migrated from Pervasive BTrieve to Oracle 10g data repository. Reasons for migration.  Save ~$2500 cost for BTrieve upgrade.  Improve database support – ERCOT has tools and expertise to support Oracle.  Improve access to interval data and analysis results by including tools such as SAS and TOAD. With BTrieve, C/S Lodestar and Interval Data Manager (IDM) are the only available access tools.  Database architecture is similar to “big” Lodestar database used in settlements.

5 5 Primary ERCOT Contacts Each TDSP should call or email their primary ERCOT contact if they have any questions regarding sample point transactions. Contact the ERCOT Help Desk with FTP Replacement related questions. CenterPointDiana OttDott@ercot.comx3934 ONCORRon Hernandez Rhernandez@ercot.co m x6523 TNMP, SharylandAdrian Marquez Amarquez@ercot.comx3915 AEPBill BoswellBboswell@ercot.comx3169


Download ppt "Load Research System Update and Timeline Report to the Profiling Working Group March 25, 2009."

Similar presentations


Ads by Google