Download presentation
Presentation is loading. Please wait.
Published byElla Marshall Modified over 9 years ago
1
ITU-R Liaison Group Report - Session #70 Opening Plenary IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE L802.16-10/00xx Date Submitted: 2010-11-08 Source: Takashi ShonoVoice:+81 3 6268 4665 Intel CorporationE-mail:takashi.shono@intel.com Venue: IEEE 802.16 Session #70, WG Opening Plenary Base Contribution: None. Purpose: ITU-R Liaison Group presentation to Opening Plenary of the WG, containing plan for the week Notice: This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16. Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: and.http://standards.ieee.org/guides/bylaws/sect6-7oman/se. Further information is located at <htFurther information is located at and.ateriml> and <
2
ITU-R Liaison Group Report - Session #70 Opening Plenary Takashi Shono Session #70 Acting Chair, 802.16 ITU-R Liaison Group IEEE 802.16 WG Session #70 Dallas, USA, 8-11 November 2010
3
Relevant Documents from Previous Sessions IEEE L802.16-10/0017r4 IEEE 802.16 ITU-R Liaison Group Workplan IEEE L802.16-10/0101r1 ITU-R Liaison Group Report to Closing Plenary of Session #69 ========== Also =========== IEEE L802.16-08/079 IEEE 802.18 IMT-Advanced review process (IEEE 802.18-08-0058/r6)
4
Input Documents for Session #70 Liaisons IEEE L802.16-10/0103 (From WiMAX Forum) Use of WiMAX Forum Mobile Radio Specification in P802.16m Draft and IEEE WirelessMAN-Advanced Specification (2010-10-06) IEEE L802.16-10/0105 (From ITU-R WP 5D) [Draft] Liaison Statement on IMT-Advanced Development (2010-10-20) IEEE L802.16-10/0106 (From ITU-R WP 5D) [Draft] Liaison Statement to External Organizations on the Schedule for Updating Recommendation ITU-R M.1457-10 to Revision 11 (2010-10-20) IEEE L802.16-10/0107 (From ITU-R WP 5D) [Draft] Liaison Statement to External Organizations (Revision of M.1224) (2010-10-20) IEEE L802.16-10/0108 (From ARIB) IMT-Advanced administrative documentation (2010-11-04) IEEE L802.16-10/0112 (From TTA) Discussion and proposal on the “Overview” section of the WirelessMAN-Advanced technology part in the Rec. ITU-R M.[RSPEC] Contributions IEEE C802.16itu-10/0004 Technical Overview of Wireless-MAN Advanced (IEEE 802.16m) for ITU-R M.[IMT.RSPEC]
5
Proposed Objectives for Session #70 Per Workplan Review the outcome of WP 5D #9 Prepare documentation for IMT.RSPEC (Overview in B.1 & titles and synopses of the GCS in B.2) Send LS to ARIB, TTA and the WiMAX Forum on the status of preparations for submission towards IMT.RSPEC, including the status of Certification B Beyond Workplan Review input contributions and take appropriate action Review input liaison statements and prepare responses as appropriate Finalize Certification B Issue Call for Comments on Overview in B.1 of IMT.RSPEC Help TGm resolve SB comments on Annexes T and U Update ITU LG workplan as appropriate
6
1) Introduction, approval of the agenda 2) Review and follow workplan of IEEE L802.16-10/0017r4 3) Review input contributions and liaisons, and prepare responses and any other output documents to external organizations as necessary 4) Update workplan 5) Approve all outgoing documents 6) Other business Proposed Agenda for the Week
7
Proposed Schedule for the Week (Room: Cumberland H) MondayTuesdayWednesdayThursday AM 08:30 to 12:00 3) Review input contributions and liaisons, and prepare responses and any other output documents to external organizations as necessary 3) Review input contributions and liaisons and prepare responses and any other output documents to external organizations as necessary 4) Update workplan 5) Approve all outgoing documents AM2: Join 802.18 to give them an update on WP 5D #9 PM 13:30 to 17:00 (Mon: 16:00 to 18:00) 1) Introduction, approval of the agenda 2) Review and follow workplan of IEEE L802.16-10/0017 3) Review input contributions and liaisons, and prepare responses and any other output documents to external organizations as necessary 6) Other business
8
To authorize the ITU-R Liaison Group to draft documents regarding contributions as needed, tentatively approve them on behalf of the WG (subject to confirmation at the 802.16 Closing Plenary), submit them for 802.18 TAG review, and represent the WG with the 802.18 TAG. For: Against: Abstain: Motion
9
UPDATE ON ITU-R IMT-ADVANCED DEVELOPMENT
10
We are here IMT-Advanced Development Process
11
WP 5D completed Steps 6 and 7 of the IMT-Advanced development process in conjunction with the Draft Report ITU-R M.[IMT.RADIO] The following two technologies has been approved by WP 5D as IMT-Advanced technologies: – IEEE Technology: WirelessMAN-Advanced – 3GPP Technology: LTE-Advanced Outcome of WP 5D #9
12
Finalize IMT.RSPEC – Annex B: Specification of the WirelessMAN-Advanced radio access technology B.1 Overview of the radio interface technology B.2 Detailed specification of the radio interface technology Expectations for WP 5D #10
13
ActivityStartStop ITU-R Action/Deliverable/Milestone WP 5D Meeting #8 9 Jun. 10 16 June 10 Liaison to External Organizations on the procedural details and detailed timelines for the completion of draft new Rec. ITU ‑ R M.[IMT.RSPEC]. RIT/SRIT Proponents - Due to ITU-R by 6 Oct. 10 Delivery to ITU-R by RIT/SRIT Proponents of Form A. See Item 4 (Table 3). WP 5D Meeting #9 13 Oct. 10 20 Oct. 10 WP 5D takes note of the Form A’s in order to determine the structure of draft new Rec. ITU-R M.[IMT.RSPEC]. WP 5D provides liaisons to RIT/SRIT Proponents and GCS Proponents. GCS Proponents - Due to ITU-R by 23 Mar. 11 Delivery to ITU-R by the GCS Proponents of the Overview and either titles and synopsis of the GCS, or the Directly Incorporated Specification when GCS is not utilized. See Item 1(Table 2). Delivery to ITU-R of the Global Core Specifications by the GCS Proponents. Detailed transposition references would not be required at this point. See Item 2 (Table 2). Delivery to ITU-R of Certification B by GCS Proponents. See Item 5 (Table 3). WP 5D Meeting #10 30 Mar. 11 6 Apr. 11 WP 5D takes note of the Certification B’s. WP 5D finalizes and preliminarily agrees draft new Rec. ITU-R M.[IMT.RSPEC] (not necessarily including the detailed transposition references). WP 5D Liaison of the preliminary WP 5D agreed draft new Rec. ITU-R M.[IMT.RSPEC] to the relevant GCS Proponents and authorized Transposing Organizations for their use in developing their inputs of the detailed references. WP 5D Meeting #11 7 July 11 14 July 11 WP 5D addresses responses from External Organizations on draft new Rec. ITU-R M.[IMT.RSPEC] Transposing Organizations (in the case of a GCS being utilized) - Due to ITU-R by 21 Sep. 11 Delivery to ITU-R of transposition references by each Transposing Organization for incorporation into the WP 5D preliminary agreed draft new Rec. ITU-R M.[IMT.RSPEC] See Item 3 (Table 2). Delivery to ITU-R of Certification C by each Transposing Organization. See Item 6 (Table 3). WP 5D Meeting #12 12 Oct. 11 19 Oct. 11 WP 5D reviews and agrees the completed draft new Rec. ITU-R M.[IMT.RSPEC] (which now includes all transposition references) and forwards to Study Group 5 Radiocommunication Bureau - 14 Nov. 11 Submission by Counsellor for SG 5 of completed draft new Rec. ITU-R M.[IMT.RSPEC] (with all transposition references) to SG 5, based on currently anticipated SG 5 meeting schedule Study Group 5 21 Nov. 11 22 Nov. 11 Study Group 5 considers adoption of the new Rec. ITU-R M.[IMT.RSPEC] for forwarding to the Radiocommunication Assembly for approval. Radiocommunication Assembly 16 Jan. 12 20 Jan. 12 Radiocommunication Assembly considers approval of Rec. ITU-R M.[IMT.RSPEC]
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.