Presentation is loading. Please wait.

Presentation is loading. Please wait.

APUC Supplier eEnablement Supporting the Collaborative Procurement Process (V4 26 August 2008) eProcurement Key Outputs from Supplier Adoption.

Similar presentations


Presentation on theme: "APUC Supplier eEnablement Supporting the Collaborative Procurement Process (V4 26 August 2008) eProcurement Key Outputs from Supplier Adoption."— Presentation transcript:

1 APUC Supplier eEnablement Supporting the Collaborative Procurement Process (V4 26 August 2008) eProcurement Scotl@nd Key Outputs from Supplier Adoption Key Activities of Supplier Adoption By commodity: SeEM & PPS will create a Supplier Data Report showing ePS active suppliers, both through institutions & ePS generally  Content availability  Connection types  Catalogues size  Develop a list of specific and general issues / requirements relevant to each commodity SeEM & PPS will create a Catalogue Routing Form detailing the recommendation for implementing the commodity onto PECOS including pricing strategy and time required for the lead-in period SeEM may be invited to UIG meeting by PPS if specific info/guidance/knowledge is required Report of ePS active suppliers, both through institutions & ePS generally  Content availability  Connection types  Catalogues size List of specific and general issues / requirements relevant to each commodity Supplier Data Report Estimate of lead in period for detailing in adverts & ITT PROJECT START UP & COMMODITY STRATEGY ITT CAN & TENDER EVALUATION/BID CLARIFICATION STANDSTILL PERIOD (where applicable) AWARD & LEAD-IN PERIOD CONTRACT MANAGEMENT SeEM may be invited to UIG meeting by PPS if specific info/guidance/knowledge is required PPS to use the standard text in the ITT: in Schedule 3 of the ITT, the ePS questions in Schedule 7, & issues the ITT with the Supplier Readiness Questionnaire General technical advice and guidance for PPS and UIG CAN Stage: PPS may ask SeEM for assistance in answering supplier queries regarding ePS Tender Evaluation/Bid Clarification: PPS to issue SeEM each tenderer’s response to Appendix 1 and their answers to the ePS questions in Schedule 7 of the ITT General technical advice and guidance for PPS and suppliers at CAN Stage Assess tenderers’ responses to Appendix 1 and ITT Schedule 7ePS questions At start of Standstill Period PPS to: advise SeEM of names of contractors. SeEM to liaise with suppliers and develop content & connection options, obtaining and approving content from suppliers agree content maintenance process and suitable timeframes address any previously identified challenges / issues regarding P2P process set up Contractor(s) onto PECOS Level 1 (if not already available) load catalogue against Level 1 profile (as appropriate). PPS to validate prior to loading PPS creates Buyers Guide including creation, with SeEM, of ePS Contract Bulletin. PPS & SeEM agree roll out strategy Supplier profile set-up on PECOS Validated content available on PECOS Actions related to specific challenges related to the P2P process Where Standstill Period not applicable: undertake actions detailed in previous Standstill Period section PPS & SeEM then to decide on PPS/ePS roll out regarding ePS Contract Bulletin SeEM to: develop & finalise advanced connection options (as appropriate) establish a Test Institution for initial set-up (if required) establish Roll-out Plan carry out Roll-out Plan create a Transition Plan for institutions with a requirement to rework existing content / connections with specific suppliers issue APUC ePS Contract Bulletin including advice re arrangements for new user training Roll-out Plan Transition Plan SeEM to: undertake a post implementation internal review (with PPS & UIG) undertake a post implementation external review (including suppliers) undertake as part of the supplier management process: – to create and agree supplier ePS Development Plan – to review General Roll-out Plans address unplanned catalogue / content change management action any price changes Supplier ePS Development Plan PROJECT START UP & STRATEGY ITT CAN/TENDER EVALUATION STANDSTILL PERIOD AWARD & LEAD-IN PERIOD CONTRACT MANAGEMENT


Download ppt "APUC Supplier eEnablement Supporting the Collaborative Procurement Process (V4 26 August 2008) eProcurement Key Outputs from Supplier Adoption."

Similar presentations


Ads by Google