Neyland Stadium Expansion Gate 21 Plaza Area and Tennessee Terrace Club
2
Hard Bid Project Competition Bell and Associates – Brentwood, Tn. Denark – Knoxville, Tn. Johnson and Gaylon – Knoxville, Tn. Merit – Knoxville, Tn Messer Contruction – Knoxville, Tn. Rentenbach – Knoxville, Tn. VCC General Contractor – Atlanta, Ga.
3
Spread Bell 17,800,000 Blaine16,148,000 Denark17,000,000 Merit17,033,000 Messer16,935,000 Rentenbach 16,349,000 VCC - 18,639,000 Spread = 1.2% between 1 st and 2nd
4
P roject Team Blaine Construction – General Contractor McCarty Holsaple McCarty – Architects Ross Bryan and Associates – Structural Eng. Wilbur Smith – Civil Engineer Carrol Johnson – Landscape Architects Smith Seckman Reid – Mechanical, Plumbing, and Electrical Eng.
5
Project Features New Plaza New Amphitheater New Gate 21 New West Side Façade New Tennessee Terrace Area
6
New Plaza
7
New Amphitheater and Gate 21
8
New West Side Facade
9
New Tennessee Terrace
10
Project Difficulties Spread Out Work Low Bid Subs Lowest Price doesn’t change expectations Difficult Schedule Several Changes to implement Sequence Controlled by one key Subcontractor