Download presentation
Presentation is loading. Please wait.
Published byMia Carpenter Modified over 11 years ago
1
APII APII & TEIN Update: New Initiative & considering points APAN-18/Backbone 6 July 2004, Cairns, AU Bo-Hyun SEO Director of APII-CC, KISDI Member of ANF Council, KR seo@kisdi.re.kr
2
APII APAN-18, July 2004, Cairns, AU 2 APII & TEIN Update (2004) APII KR-JP 1Gbps >> (10Gbps) To be upgraded to enhance global connectivity KR-US 155Mbps >> 1Gbps* Upgraded in May 2004 KR-SG6Mbps >> 8Mbps* ** Upgraded in May 2004 KR-CN155Mbps 2 To launch a new link, end of July or early August TEIN (KR-FR)34Mbps >> 155+Mbps
3
APII APAN-18, July 2004, Cairns, AU 3 JP KR CN New Initiative @ North Asia …CJK G+ Triangle CJK APEC, ASEM, ASEAN+3 EU-TEIN, US-IRNC APII Workshop APAN Strengthen R&A Collaboration CJK IT MM ASEAN+3 TEL APEC TEL Bridge the Digital Divide Enhance Global Connectivity (2.5G+) IRNC TEIN+TEIN2 KR-CN, KR-JP, CN-JP, + other links
4
APII APAN-18, July 2004, Cairns, AU 4 Discuss @APAN18 (Case) Recognition @APAN18/SEA Difficulty & diversity of SEA Community Big hands at now – SEA: SIREN + TEIN2 Urgent to meet due date of each projects timeline Ad hoc TF, continuing to work even after APAN/SEA Necessity of sharing & coordinating b/w relevant projects TEIN2 + NICT or SIREN (General) Considering points Identify utilizable joint efforts in common Inter-regional: TEIN2, SIREN, IRNC… Intra-regional: TEIN2, SIREN, APII… & Bilateral links Maximize multilateral effect, while keeping independent initiative Purpose, scope, time, funding Top-down, Bottom-up What should be the role of chairing group of PL/WGs of APAN Community, what should be the role of and relation of APAN chairs of each country, from the perspective of R&A demand side, to utilize the supply-support to maximum
5
APII APAN-18, July 2004, Cairns, AU 5 Thank you seo@kisdi.re.kr
Similar presentations
© 2025 SlidePlayer.com Inc.
All rights reserved.