Presentation is loading. Please wait.

Presentation is loading. Please wait.

Engineering Agile Combat Support Worldwide Air Force Civil Engineer Support Agency AFCESA Contract Opportunities Briefing Mr. Michael Clawson, PE, REM.

Similar presentations


Presentation on theme: "Engineering Agile Combat Support Worldwide Air Force Civil Engineer Support Agency AFCESA Contract Opportunities Briefing Mr. Michael Clawson, PE, REM."— Presentation transcript:

1 Engineering Agile Combat Support Worldwide Air Force Civil Engineer Support Agency AFCESA Contract Opportunities Briefing Mr. Michael Clawson, PE, REM Chief, Contract Support Division 26 July 2011

2 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 2 AFCESA Contract Programs Sustainment, Restoration, and Modernization (S/R&M) Air Force Contract Augmentation Program (AFCAP) Labor Support Utilities Privatization* Energy Savings Performance Contracts* *Programs in red not included in this briefing

3 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 3 AFCESA S/R&M Support Repair Runway Dover AFB A/E Services - Planning, Design, Const Management Construction Services Infrastructure O&M Task Order Development, Negotiation, Award Task Order Management PM oversight/Title II Funds Management Contract Administration Financial/physical closeout Technical Reach Back

4 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 4 S/R&M Support Business Model Enable successful execution of complex Air Force S/R&M Synergy of top Air Force contract management and technical subject matter expertise Host of proven contractors, readily available worldwide Integrated contracting capability – accelerated acquisition Execution enabler for customers Replace Rwy 06/24 McGuire AFB

5 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 55 AFCESA S/R&M Core Competencies FacilitiesCivilMechanicalElectrical Anti-Terrorism/ Force Protection Life Safety Energy Roof Systems Structural Systems Airfield Lighting/Marking Pavements Structural/Friction Evaluations Water/Wastewater/ Solid Waste Aircraft Arresting Systems HVAC Systems Fire Suppression Natural Gas Systems Boiler Systems Plumbing Systems POL Systems Industrial Waste Systems Elec Distribution Power Plants Ext/Int Elec Generators Lightning Protection SCADA Cathodic Protection FOA SRM execution is aligned along Core Competencies AFCESA’s Core Competencies:

6 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e S/R&M Contract Toolbox AE Services 4PAE/08 29 contractors $3B w/ ordering period through Aug 2013 DCO authority from AFCEE Construction Services S/R&M Acquisition Task Order Contract (SATOC) 6 Dollars By FY FY08 - $458.5M FY09 - $443.0M FY10 - $395.2M FY11 – $387M (Projected) Charleston AFB Runway Repair

7 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 7 S/R&M Acquisition & Task Order Contract (SATOC) Multiple Construction Delivery Methods Turnkey, Design-Build, Traditional Construction 20 contractors including small business 8(a), Hubzone, and Service Disabled Veteran Owned Small Business Program Ceiling 5-year basic ($4B), 5 one-year options (total 10 yrs @ $4B) Based on forecast for FY06-FY10 S/R&M Program Current Flexibility for unknown (unpredictable) disaster response/contingencies Awarded May 2008 Limited DCO Authority issued to other AF Contracting offices

8 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 8 SATOC Contractors AMEC CDM/CAPE JV CH2M Hill AECOM ECC Innovative Technical Solutions Jacobs Government Services Parsons Tutor Perini Corp MACTEC * SB Toltest *NorthWind *SEI Group, Inc. Weston Solutions Johnson Controls/Versar JV *Barlovento, LLC *J2 Engineering *Charter Environmental *DWG & Associates EQM

9 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 9 AFCAP What is it? Multi-year/vendor, ID/IQ-type contract, for contingencies Capable of rapid response Available to support National Command Authority Awarded 2005, Ends 30 Sep 2015 Definition – a contingent contract tool, teaming Government & private industry, providing responsive solutions to National Command Authority challenges - - leveraging greater impact toward meeting urgent demands 9

10 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 10 Response Spectrum Broad Range of Capabilities Installation Support Services Fill forward gaps Sustainment Reconstitution Bridge home station shortfalls Contingent Logistics War reserve materiel augmentation Vehicles & heavy equipment / leases Just-in-time supplies / materials Humanitarian relief support Expeditionary Construction Planning, facility hardening Emergency, disaster/base recovery Site restoration 10

11 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 11 IRAQ IRAN SAUDI ARABIA UAE OMAN AFGHANISTAN TURKMENISTAN UZBEKISTAN KAZAKHSTAN TAJIKISTAN KYRGYZSTAN AZERBAIJAN TURKEY KUWAIT PAKISTAN CHINA Al Dhafra Ali Al Salem Manas BAHRAIN QATAR GEORGIA Al Udeid INDIA Bagram Al Jaber AFCAP in SWA Current Locations JORDAN Speicher Taji Balad Kirkuk Victory Base Complex Sather Al Asad Kandahar Jalalabad Salerno Sharana Ali 11

12 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 12 AFCAP Demographics Fiscal Year 2010 Customers by % of $$ Customers by qty of actions Task types by $$ Task types by qty of actions Funded amount = $385M, Quantity of actions = 302 76% 16% $61.1 $293.1 $22.2 $8.1 10% 80% 97% 3% $372.9 $11.3 $0.4 85% 13% 6%

13 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 13 Surge Capability Required How Fast? MISSION: Curb the tide of death & human suffering Haiti Earthquake; cholera outbreak human remains pouches pharmaceuticals IVs & surgical kits cholera beds water purification Mexico flooding; kitchen sets Pakistan flooding; concrete saws water purification blankets, tarpaulins 13

14 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 14 Disaster Response AF Needs & Response to Civil Authorities Elevated tornado season Hurricane season starts 1 June AFCAP has provided; damage assessments route clearing backup generators utility restorations heavy equipment debris removal measures to cease further degradation of facilities “blue” roofs mold remediation temporary facilities facility restorations 14

15 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 15 AFCAP Contractors Prime Contractors – URS Group, Inc & Louis Berger Group, Inc, JV – DynCorp International, LLC – CH2MHill & KBR Global Services, LLC – Readiness Management Support, LC – URS Energy & Construction ( formerly Washington Group ) 15

16 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 16 Labor Support GSA recently awarded new follow-on multi-award Labor Support BPAs for AFCESA support Replaces current single award BPA Current BPA provides over 400 FTEs to Air Force New BPAs use 8 existing GSA labor schedules Selected Firms: Booz Allen Hamilton Inc J. M. Waller Associates Inc Northrop Grumman Information Tech. Inc. Future AFCESA requirements will be competed among these BPA holders 16

17 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 17 Labor Support Intent is for AFCESA to use this vehicle for 2 years for A&AS and 3 years for Non-A&AS Labor Support Requirements Current plan is to off-ramp A&AS requirements to the new GEITA contract and non-A&AS to a yet to be defined contract BPAs awarded by GSA are for 5 Years By going through GSA, this contract vehicle is available for use by DoD organizations other than AFCESA 17

18 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 18 Opportunity Summary Partnering with current contract holders on AFCAP, SATOC, & Labor Support is one alternative for going after AFCESA contract opportunities Starting procurement for AFCAP IV on horizon Transition of AFCESA A&AS requirements to GEITA

19 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 19 Questions

20 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 20 Backup Slides

21 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 21 SATOC Contractor Contact Info AECOM Technical Services, Inc (EarthTech) Attn: Jennifer Mullins 717 17th Street, Suite 2600 Denver, CO 80202 AMEC Earth & Environmental, Inc Attn: York Thorpe 2308 E. 9th Street Lynn Haven, FL 32444 Barlovento, LLC Attn: Jane Soloman 431 Technolgy Drive Dothan, Al 36303 CDM/CAPE, a Joint Venture Attn: Patrice Melancon TBPE Firm Registration No. F-3043 12357-A Riata Trace Pkwy, Ste 210 Austin, TX 78727 Charter Environmental Attn: Tim Cady 560 Harrison Avenue Suite 500 Boston, MA 02118-2592 CH2M Hill Constructors, Inc Attn: Bill Owens 3011 SW Williston Road Gainesville, FL 32608 DWG & Associates Attn: Carl Johnson 8535 S. 700 W. Unit 1-A Sandy, Utah 84070 ECC Attn: Jeff Leptrone 433 Harrison Ave Panama City, FL 32401 Environmental Quality Management, Inc. Attn: Jim Zody 1800 Carillon Boulevard Cincinnati, Ohio 45240 ITSI Attn: Dan R. Ledford 2730 Shadelands Drive, Suite 100 Walnut Creek, California 94598 J2-Engineering, Inc. AttnL Joes Morales 6921 Pistol Range Road, Suite 101 Tampa, FL 33635 Jacobs Government Services Attn: Debra Hickman 125 Broadway Avenue Oak Ridge, TN 37830 Johnson Controls/Versar (JCFSV) Attn: Brenda Chube 6850 Versar Center, Ste 200 Springfield, VA 22151-4175 MACTEC Attn: Pete Campbell 9177 Sky Park Court San Diego, CA 92123 NorthWind, Inc. Attn: Rusty Gilbert 433 Kitty Hawk Road, Suite 211 Universal City, TX 78148 Parsons Infrastructure & Technology Group, Inc Attn: Jerry Osterwiecki 100 West Walnut Street Pasadena, CA 91124 SEI Group, Inc. Attn: SATOC-Jensen Osterdorf 303 Williams Ave, Suite 135 Huntsville, AL 35801 Toltest, Inc Attn: SATOC Program C/O Linda Barclay 1480 Ford Street Maumee, OH 43537 Tutor-Perini Corp Attn: John Gerstenlauer 73 Mt. Wayte Avenue Framingham, MA 01701-9160 Weston Solutions Attn: Dwayne Sellers 70 N.E. Loop 410, Ste 600 San Antonio TX, 78216

22 E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 22 AFCAP Contractor Contact Info – URS Group, Inc & Louis Berger Group, Inc, JV Mr. Kurt Bergman; e-mail: URSAFCAPPMP@urscorp.com – DynCorp International, LLC Mr. Eppie Walker; e-mail: eppie.walker@dyn-int.com – CH2MHill & KBR Global Services, LLC Mr. Henry Arboleda; e-mail: henry.arboeda@ch2m.com – Readiness Management Support, LC Mr. Dan Barker; e-mail: daniel.j.barker@iapws.com – URS Energy & Construction ( formerly Washington Group ) M r. Alex Formwalt; e-mail: alex.formwalt@urs.com


Download ppt "Engineering Agile Combat Support Worldwide Air Force Civil Engineer Support Agency AFCESA Contract Opportunities Briefing Mr. Michael Clawson, PE, REM."

Similar presentations


Ads by Google