Presentation is loading. Please wait.

Presentation is loading. Please wait.

Bamah Nissi Multilinks Limited. A Dream Come True Our plan is to make home acquisition a possibility for every determined Nigerian Move from your village.

Similar presentations


Presentation on theme: "Bamah Nissi Multilinks Limited. A Dream Come True Our plan is to make home acquisition a possibility for every determined Nigerian Move from your village."— Presentation transcript:

1 Bamah Nissi Multilinks Limited

2 A Dream Come True Our plan is to make home acquisition a possibility for every determined Nigerian Move from your village hut To the home of your dreams When shall I become the owner of a decent & modern home on my low income?...If only I could acquire a home via installmental payments. How else could we have acquired this property?

3 Introduction  A A Real Estate company incorporated on September 15, 2006: RC Number: 666924  T he company also provides Civil Engineering Construction and Project Management Services

4 Our Vision “We shall be a Leading Real Estate Developer With Unmatched Engineering and Construction Capabilities. We shall strive to eclipse and exceed the highest Global building and Engineering Standards in our quest to providing World class Construction and Engineering Solutions to our Valued Customers”

5 Our Mission “To be the Best Indigenous Civil Engineering and Construction Firm in the Construction and Real Estate Sector of the Nigerian economy by expertly harnessing the rich pool of talent at our disposal for the provision of top-notch products and services”

6 Our 3 Estates Bamah Nissi Falling Rain Estate Located at Ogonbo off the Lekki-Epe Expressway on a total of 20 Hectares Rainbow Rain Estate Located at Ibeju-Lekki off the Lekki-Epe Expressway on a total of 67 Hectares Crystal Rain Estate Located at Olugborogan off the Lekki-Epe Expressway on a total of 20 Hectares of Prime Land; opposite the Chevron Quarters

7 Location Advantages The Location of the 3 Estates on the Lekki-Epe Expressway is a plus to residents as the Incessant traffic shall soon give way to free flowing Traffic upon completion of the 6 lane expressway currently under construction

8 Our Offer We are offering serviced plots to customers, especially corporate customers and co-operatives We commence allocation immediately the plots are completely paid for Our secondary offer is to construct or handle the actual construction of the buildings on the acquired plots

9 Payment Plan EstateLocationPrice per sq.m (Naira) DurationInitial Deposit Crystal RainOlugborogan30,000/sq.m24 Months 10-20% Rainbow RainIbeju Lekki3,000/sq.m24 Months 10-20% Falling RainOgombo -24 Months 10-20%

10 Title and Documentation

11 Security & Performance Guarantee  Our Bankers shall issue an APG to your co-operative or Group to secure your investment and payments  We can also insure your group or co-operative’s installmental payments.  A prime insurance company shall provide an insurance cover for all monies paid to our company towards the property acquisition.

12 Estate Layout Our estate shall be replete with all the conceivable trappings, infrastructure and amenities that estates of such calibre should possess. The estate layout shall be unmatched in every parameter

13 Estate Standards and Specifications Our estates shall have set standard specifications There shall be standards for the types of houses that can be constructed within our estates. There shall be standards for the following:  Building Type  Design and Other Specifications (Plumbing, Drainage etc)  Build and Quality of Finishing  Number of Gates  Distance from Street/Road  Wall height etc

14 Lagos State Government  The commitment of the Lagos State Government to transform the Lekki axis into the ‘New Lagos’, coupled with the speed of execution shall  The EPZ and speed of execution is also giving impetus to the rate of property appreciation  The planned International Airport, International Sea Port etc are all

15 Expansion of the Lekki-Epe Expressway into a 6 Lane Highway The expanded highway shall reduce commuting time from the Lekki Axis to Victoria Island/Ikoyi from a 2 Hour average to less than 20 minutes

16 Project Status Below is the BJ Hotel and I004 intersection on Ozumba Mbadiwe. This high quality construction shall extend to our estate and to your doorstep:

17 Planned Estate Facilities The Crystal Rain, Rainbow Rain and Falling Rain Estates shall all be replete with the following:  Quality Road network Tarred Main road  Paved Access Roads  Central Water Treatment Plant  Solar-Powered Street Lights  Central Waste Disposal and Treatment Plant  Central LPG Distribution Facility  Community Park with Swimming Pools  Estate Shopping Mall and Theater  2 Privately-run Primary Schools with creches  Security Post

18 Street Lights The estate shall be well lit with street lights on every street. Street lights shall not be on only major streets; the entire estate shall be well lit and lights shall be efficiently maintained and services to ensure adequate illumination estate-wide.

19 Solar Powered Street Lights Street lights shall be powered by solar panels to facilitate and enhance reliability of power for illuminating the estate.

20 Estate Road Network  All major roads shall be tarred Within the estates.  All access roads shall be constructed With paving stones  The estate shall be devoid of Earth roads and dusty or muddy lanes

21 Solar Energy for Domestic Use  The schematic illustrates The process of generating and Distributing solar generated Power for utilization of our Residents.  The schematic has been Simplified for easy comprehension

22 Central Gas Distribution Plant Our estates shall have a Central Gas Distribution Plant Channeled to each house. This shall facilitate convenience Since residents shall no longer have to convey bottles to and fro Gas meters shall be installed in Every house to calibrate usage and accurate billing.

23 Alternate Central Gas Distribution Technology

24 Water Treatment  The estate shall be equipped with a centralized water- Treatment plant  The schematic illustrates the technology and processed for the treatment and distribution of Safe, clean potable water Estate-wide

25 Alternative Water Treatment System s

26 Street Drainage and Gutters The estates shall have a covered and modern efficient drainage System that shall eliminate the hazard of flooding within the estate.

27 Project Status All Three Estates are under construction

28 Present Stage of W.I.P. We are at the land-allocation/allotment and clearing stage At this stage. we expect prospective Landlords to purchase land to any of our estates by subscribing to our smart and structured acquisition programme.

29 Layout Our Estate layout shall be the most modern and convenient with lots of attention and consideration given to space/ergonomics, convenience, road network, drainage systems and positioning.

30 Design Our customers shall have a wide array of picturesque and elegant Architectural masterpieces to choose from

31 Quality Construction

32 Wide Design Options

33 Bespoke Interiors

34 Bespoke Design Options

35 Prototypes to be customized with elaborate Floor Plans

36 Sensible and Convenient Layouts

37 Floor Plan Alternatives

38 Floor Plan of Ground Floor of 2 Storey & 3 Bed Detached House

39 Floor Plan of 3 Bed Detached House

40 Foundation & Form Work

41 Construction Procedures in Tandem with International Best Practice

42 Quality Materials and Symmetry throughout

43 Solid and Durable Blocks

44 Discussion Session

45

46

47

48

49


Download ppt "Bamah Nissi Multilinks Limited. A Dream Come True Our plan is to make home acquisition a possibility for every determined Nigerian Move from your village."

Similar presentations


Ads by Google