Download presentation
Presentation is loading. Please wait.
Published byAbigayle Cannon Modified over 10 years ago
1
Dr. Can Türker (Functional Genomics Center Zurich) B-Fabric for Switzerland Generalizing B-Fabric towards an Infrastructure for Collaborative Research in Switzerland · · · · tuerker@fgcz.ethz.ch · · · · Bern, January 2010 ·
2
· · · 2 B-Fabric: The FGCZ Approach to Data Management and Integration
3
B-Fabric from the User’s Perspective Functionality Register samples/extracts Import and annotate data files One-click access to all “my” data Browse data network Quick/Advanced search Export and download data Direct link to open tasks Run external applications Manage annotations Benefits Secure, long-term data storage Easy web-based data access Fast access to relevant data Data reuse Reduced annotation work through automatic export to external marts Access-controlled data sharing Increased data quality Generation of reports etc. Reproducibility of research results · · · 3
4
B-Fabric Architecture · · · 4 Registered Applications B-Fabric Repositories B-Fabric Workhorses Messaging Copier Indexer Searcher Grid Engine Worker Frontend Web Portal Workflow Messaging Logging B-Fabric Database B-Fabric Database External Data Stores User PCs Data Evaluation Instrument PCs Affymetrix GeneChip ABI MALDI TOF/TOF LTQ-Orbitrap Scientific Data Marts Rosetta Resolver Mascot Integra Computing Clusters Sun Grid Engine LogicalImport SGEExecutable AffymetrixImport Completely based on open source technologies Implementation started in 2005 Running in daily business at FGCZ since 2007 Completely based on open source technologies Implementation started in 2005 Running in daily business at FGCZ since 2007 Users1559 Institutes225 Organizations59 Projects756 Extracts3699 Workunits (experiments)24108 FGCZ B-Fabric Deployment January 2010
5
Switch Project: “B-Fabric for Switzerland” Project Number: UZH.5 Start/End: June 2009/May 2011 Goal: open and generalize B-Fabric such that a broader research community in Switzerland can profit from it Two essential application scenarios: Local deployment and administration of B-Fabric in research groups with the required technical/human resources Ad-hoc coupling of external data resources with an FGCZ B-Fabric instance for others · · · 5
6
Project Tasks: B-Fabric Generalization w.r.t. Ad-hoc coupling of data sources Declarative, dynamic coupling of external data resources with B-Fabric Fine-grained, dynamically adaptable access management Role-based access model Fine-grained access rights Ad-hoc granting/revoking access rights Switch AAI Shibboleth-based authorization and authentication Switch AAI/Shibboleth-based access to B-Fabric Advanced annotation management: Support optional links to external annotation vocabularies Synchronization with external annotation vocabularies Extend annotation review/release process · · · 6
7
Demonstrate usefulness of B-Fabric outside FGCZ Institute of Molecular Systems Biology (IMSB), ETH Zurich: Dr. Lars Malmström Evaluating a locally deployed instance of B-Fabric Couple representative IMSB data sources with this IMSB B-Fabric instance EAWAG Swiss Federal Institute of Aquatic Science and Technology: Dr. Marc Suter Evaluating ad-hoc coupling of external data sources Couple selected EAWAG data sources with an FGCZ B-Fabric instance EAWAGFGCZ Collaborators · · · 7 B-Fabric IMSB B-Fabric
8
Task: Ad-hoc coupling of data sources · · · 8
9
Project Milestones/Deliveries · · · 9 Mile- stone TitleDate DueComment Project Start01.06.09Official Project Start 1Organization of Project Kick-off MeetingJune 09Kick-off Meeting bringing together all project participants/collaborators 2Setting up a web page for project documentationJune 09Deliverable: Project Web Page 3Concept for ad-hoc integration of external data sources31.07.09Deliverable: Specification for ad-hoc coupling of external data sources 4Implementing & Testing ad-hoc coupling of data sources30.09.09Deliverable: B-Fabric with support for ad-hoc data source coupling 5Quarterly Progress ReportSep 09Deliverable: Progress Report 6Coupling selected external data sources from EAWAG30.11.09Deliverable: Selected EAWAG data resources are coupled with B-Fabric 7B-Fabric DemonstrationDec 09Public B-Fabric Demo 8Quarterly Progress ReportDec 09Deliverable: Progress Report 9Conception of a role-based access model31.01.10Deliverable: Specification of a role-based access model for B-Fabric 10Quarterly Progress ReportMar 10Deliverable: Progress Report 11Implementing & Testing the role-based access model31.05.10Deliverable: B-Fabric supporting a role-based access model 12Concept for Authentication via SwitchAAI Shibboleth30.06.10Deliverable: Specification of the Integration of SwitchAAI Shibboleth into B-Fabric 13Annual Progress Report & Project MeetingJun 10Meeting Goal: evaluating project state and achievements and defining actions if needed 14Implementing & Testing SwitchAAI Shibboleth-based Authentication31.07.10Deliverable: B-Fabric with support for SwitchAAI Shibboleth-based authentication 15Deployment and Evaluation of B-Fabric at IMSB31.08.10Deliverable: B-Fabric running and evaluated at IMSB 16Quarterly Progress ReportSep 10Deliverable: Progress Report 17Revision & Generalization of the annotation management31.10.10Deliverable: Specification of the generalized annotation management 18Quarterly Progress ReportDec 10Deliverable: Progress Report 19Implementing & Testing of the annotation management28.02.11Deliverable: B-Fabric with generalized annotation management feature 20Evaluation of Generalized Annotation management31.03.11Deliverable: Evaluation report on B-Fabric running at FGCZ/IMSB 21Quarterly Progress ReportMar 11Deliverable: Progress Report 22B-Fabric DemonstrationMay 11Public B-Fabric Demo 23B-Fabric PublicationMay 11Paper(s) on B-Fabric accepted for presentation at conferences and workshops, resp. 24Final Revisions & Bugfixing31.05.11Deliverable: Final B-Fabric Version 25B-Fabric User Manual & FAQ31.05.11Deliverable: B-Fabric User Manual and FAQ 26Final Project Report & Project MeetingJune 11Summary and presentation of the results of this project Project Finish31.05.11Official Project Finish
10
People Behind B-Fabric · · · 10 Prof. Ralph Schlapbach FGCZ Scientific Director B-Fabric Initiator & Sponsor Dr. Can Türker B-Fabric Project Leader Dieter Joho B-Fabric Design & Development Marco Schmidt FGCZ IT Coordinator (Admin/Support) FGCZ Bio-Informatics Experts Dr. Christian Panse, Simon Barkow Oesterreicher, Dr. Hubert Rehrauer Feeding and Coupling B-Fabric with External Applications Dr. Fuat Akal B-Fabric Design & Development Further B-Fabric Developers: Christian Decker Michael Fetzer Benedikt Thelen Felix Knecht Giacomo Pati (Otego AG Zurich)
Similar presentations
© 2025 SlidePlayer.com Inc.
All rights reserved.