METGRID 2005. 1. 27 KMA Supercomputer Center Dongil LEE.

Similar presentations


Presentation on theme: "METGRID 2005. 1. 27 KMA Supercomputer Center Dongil LEE."— Presentation transcript:

1 METGRID 2005. 1. 27 KMA Supercomputer Center Dongil LEE

2 Background of METGRID  Why weather agencies are using Supercomputer?  Current and future weather forecasting -> Numerical Weather Prediction  Two ways of best efforts Improving the initial field of NWP (best analysis, data assimilation…) Decreasing the uncertainty of NWP product (ensemble weather forecasting, super -, Multi- model ensemble with different initial field

3 Limitation of Single Center for weather forecasting Human resources Data resources Computing resources

4 Some basis/related issues THOPEX WMO FWIS GEOSS Gloriad Grid E-Science Single Global Weather Forecasting

5 METGRID starting Dr. David Roger (Chief Executive, Met Office, UK) outlined a possible future scenario for global weather forecasting – August 2004 Prof. Geerd-R Hoffmann (DWD), Vice president of CBS, WMO prepared ‘proposal for a technical feasibility study’ - November 2004 7 centers will have first coordination meeting of METGRID – March 2005

6 Purpose of METGRID All major global weather forecasting centers of the world To share their global forecasts with each other as a multi-model ensemble To agree on areas of the world which merited further studies To carry-out detailed ensemble predictions for these regions Studies are undertaken as part of the THOPEX research program

7 Partners of METGRID NameSystem installedContact CMAIBM Power 4SHI Peiliang DWDIBM Power 3Geerd-R. Hoffmann ECMWFIBM Power 4/5Walter Zwieflhofer KMACRAY X1EDongil Lee Météo FranceFujitsu VPP 5000Dominique André NCARIBM Power 3/4Al Kellie UKMetNEC SX-6Steve Foreman

8 Issues of METGRID Organizational issues Communication Software Operational aspects Pilot phase and other aspects

9 Action needed Agree on first outline of proposal in principle Agree on proposal for study Set up a project for carrying out the study and agree on resources Deliver results of study ( ~ 09/2005 ) Start of pilot phase ( 01/2006 ~ )

10 KMA status Partnership with DWD for V-GISC Simple UNICORE test with DWD Setting up UNICORE including user interface for 2 nd Supercomputer System Intent to expand Partnership with CAgM of WMO, NCAR, Grid Community and others…

11 Thank you