1 Civil Engineer Program Outlook
Mr. Harry (Buddy) Briesmaster 75 CEG/CL

2 Overview Programmatic Changes
Contract Vehicles & Upcoming Procurements A & E Services MACC Service Contracts IDIQ Commodities MILCON / USACE Projects

3 Programmatic Changes New AF Installation & Mission Support Center (AFIMSC) Consolidates most HQ roles into single command or center Parent org for AFCEC & numerous other orgs Cuts across large number of functional areas including Civil Engineering Most details have yet to be released Strategic sourcing is being discussed (e.g. regional contracts) Funding Focus funding eliminated (e.g. Energy, Dorms, etc.) Centralized funding concept AF-wide Scoring model determines project funding priorities Model measures risk to mission, risk of facility failure, cost savings

4 Contracts - A&E Services
Architecture & Engineering Services (A&E) Scope: A&E Services under Brooks Act Design, Construction Management, Special Studies, Master Planning (FY13-18) Basic + 4 option yrs (Current contract awarded Jan 2013) Specifics $1.6M ceiling/contractor ($4.4 M expended to-date of $9.6M for entire pool of contractors) Task orders selected on technical qualifications 6 Firms: AJC, Architectural Nexus, Baker, Design West, GBS, URS POCs: Contractual: Ted Griffiths, PZIOC, (801) Technical: Jonathan Ramras, 75 CEG/CENMP, (801)

5 Contracts – MACC II Design/Build Multi Award Construction Contract (MACC) Scope: Design and Construction (D/B or DBB) Basic + 4 option yrs (Awarded Sep 2012) Design/Build or Build under Design/Bid/Build Specifics $95M total procurement ceiling, ~$86M awarded to-date Competitive Task Orders Nine contractors w/ $19M annual ceiling each (e-Corp, Advanced Solutions Group, Grand Enterprises, Sahara Palms, K.O.O Construction, A4 Construction, Au' Authum Ki, Pesavento, Sierra-H1 Joint Venture) POCs: Contractual: Ted Griffiths, PZIOC, (801) Technical: Jim Ingold, 75 CEG/CENME, (801) MACC II Contractors Contractor/Contract Number Address Primary POC Alternate POC E-CORP FA D N Hill Field Rd, Ste B Layton, UT Shaun Froelich David Willis         Advanced Solutions Group FA D E Crestwood Rd, Ste 1 Kaysville, UT Denise Mitchell Blair Giles         Grand Enterprises FA D S 3800 W Ogden, UT Todd Grandstaff Tammy Grandstaff         Sahara Palms FA D Country Oaks Dr Layton, UT Patricia Morgan Kevin Morgan         K.O.O. Construction FA D Boatman Ave West Sacramento, CA Keith Odister , x15 Moneeta Kumar , x18         A4 Construction FA D S Main St Salt Lake City, UT Shawn Anderson Amy Anderson         Au' Authum Ki FA D W. Allison Rd Chandler, AZ Vicki Frizzell Margaret Rodriguez         Pesavento Construction FA D S Arville St Las Vegas, NV Todd Pesavento Robert Pesavento Sierra-H1, Joint Venture FA D S 500 E, Suite 205 Clearfield, UT Ron Garner Erendira Garner

6 Contracts – MACC III MACC III is in the procurement process POCs:
Industry Day held 9 Oct 2014 Anticipate scope and contract similar to MACC II ($95M – 5 yrs) RFP expected Feb/Mar 2015 Contract Award expected Fall 2015 POCs: TSgt Bedoya PZIE, (801) Tracy Beringer PZIE (801) MACC II Contractors Contractor/Contract Number Address Primary POC Alternate POC E-CORP FA D N Hill Field Rd, Ste B Layton, UT Shaun Froelich David Willis         Advanced Solutions Group FA D E Crestwood Rd, Ste 1 Kaysville, UT Denise Mitchell Blair Giles         Grand Enterprises FA D S 3800 W Ogden, UT Todd Grandstaff Tammy Grandstaff         Sahara Palms FA D Country Oaks Dr Layton, UT Patricia Morgan Kevin Morgan         K.O.O. Construction FA D Boatman Ave West Sacramento, CA Keith Odister , x15 Moneeta Kumar , x18         A4 Construction FA D S Main St Salt Lake City, UT Shawn Anderson Amy Anderson         Au' Authum Ki FA D W. Allison Rd Chandler, AZ Vicki Frizzell Margaret Rodriguez         Pesavento Construction FA D S Arville St Las Vegas, NV Todd Pesavento Robert Pesavento Sierra-H1, Joint Venture FA D S 500 E, Suite 205 Clearfield, UT Ron Garner Erendira Garner

7 Service Contracts 10 contracts providing broad range of services
Custodial, Refuse, Grounds, Cranes/Hoists, Elevators, Porta-Potties, Snow Removal, Lab Equipment, Hoods/Ducts, Cathodic Protection Specifics Excess of $45M Competitive bid every 5 years or when ceilings reached Typically 5 years (basic + 4 option yrs) Small Business POC: Rodney Sanders, 75 CES, (801) Service contracts that will be re-competed in the next 18 months are: Elevator, Refuse

8 Upcoming Service Contracts
Elevator Maintenance Requirements document underway Anticipated contract award Feb 2015 Refuse Anticipated contract award Sept 2015

9 ID/IQ Contracts Indefinite Delivery/Indefinite Quantity (ID/IQ) Contracts Scope: Pavements, Fence, Carpet, Paint, Roofs, Epoxy Floor Coating, SABER Each contract has established ceilings Typically Basic + 4 option years Acquisition Strategy: Procured every 5 years or when ceiling reached Task order based contracts POC: Kent Nomura (801)

10 Upcoming ID/IQ Program: Asbestos IDIQ Ready for Solicitation/RFP
Contract award expected Mar 2015 Program: SABER Procurement process underway RFP date TBD Contract award expected Sep 2015 POC: TSgt David McDonald, PZIOC,

11 Commodities Commodity Purchasing
Scope: Shop materials and tools (benchstock), road salt and deicers, IWTP Chemicals, Boiler Chemicals, Electrical Parts, Asphalt/Concrete $5M/year Acquisition Strategies Competitive bids Government Purchase Card Blanket Purchase Agreement GSA or Prime Vendor POC: Chad Dellamore, 75 CES (Logistics)

12 MILCON Projects Project Title Cost Range ($M) FY Est Award Date
Fire Crash Rescue Station $18 14 TBD B40/42 ADAL AMU $21 16 May 2016 B118 ADD Flight Simulator Phase II $6 F-35 Munitions Complex $10 17 Apr 2017 Construct 9 Hayman Igloos Bldgs $11 Construct POL Pump House Bldg 870 $9 18

13 Questions?