Presentation is loading. Please wait.

Presentation is loading. Please wait.

MINISTRY OF WATER RESOURCES,RIVER DEVELOPMENT &GANGA REJUVENATION

Similar presentations


Presentation on theme: "MINISTRY OF WATER RESOURCES,RIVER DEVELOPMENT &GANGA REJUVENATION"— Presentation transcript:

1 MINISTRY OF WATER RESOURCES,RIVER DEVELOPMENT &GANGA REJUVENATION 13-5-2015

2 Priorities of Ministry
Inter linking Category 1 Ken Betwa Mahanadi Sapta Kosi Karnali Jammu Tabi Lake Middle Siang Projects Category 2 Daman Ganga pinjal Par Tapi narmada Polavaram AIBP DRIP Irrigation( Haryana ,UP particularly) Ganga Rejuvenation( Role of AIBP,FMP,CWC,CGWB) FMP Kedar Nath Mirzapur Majauli Jal Kranti Abhiyan Ganga – Our Priority Ganga Rejuvenation

3 Priorities/Focus Areas
WATER RESOURCE Abetment of Pollution(Arsenic) Jal Kranti Abhiyan Development of Ground Water Resources Development of water resources data base Disaster Management and Dam Safety Flood control through flood forecasting system Completion of Flood Management Program(FMP) Taking up new projects under FMP at Mirzpur,Kedarnath, Majauli DRIP Irrigation Method(UP,Haryana particularly) Integration of role of AIBP,FMP,CWC,CGWB for Ganga Rejuveanation Establishment of Pancheswar Multipurpose Project Release of funds to alrady approved projects under AIBP Fixing of priority, timelines for each activities of Ministry including public benefit components

4 Priorities/Focus Areas-Contd
RIVER DEVELOPMENT Inter-linking of Rivers(Ken Betwa,Daman Ganga Pinjal,Par Tapi Narmada & Mahanadi Godavari Link Projects) Revival of National Projects(Gosikhurd etc) Release of funds to Polavaram Project Preparation of Siang Middle Project GANGA REJUVENATION Better Coordination with status and GIU at states Expediting work Plan and works

5 Inter linking of Rivers
NWDA with the concurrence of concerned states undertaken the preparation of DPR of agreed links DPR for Ken Betwa Link Phase-I&II and Daman Ganga Pinjal link completed DPR for Par Tapi Narmada link is under progress. Will be submitted A Task Force also Constituted on Inter-linking, three meetings held.

6 Inter linking of Rivers- issues/constrants
Preparation of DPR of linking projects can be taken only after consensus among concerned states Clearance from various appraisal agencies such as MoE&F, MoTA Investment clearance by NITI AYOG & Techno economic clearance by TAC of Ministry Projects to be implemented either through state Govt funds or by financial assistance by MOWR under AIBP or by other agencies.

7 Abetment of Arsenic contamination: Issues/Constraint
PRIORITY Preparation of comprehensive project on Arsenic mitigation for whole country IMG constituted under MD, NWM COS meeting on

8 Development of Ground Water Resources: Issues/constraints
“Web based system for Receipt and Issuing of NOC by Central Ground Water Authority to Abstract Ground Water” for Integration with e-Biz Portal already functioning under NAQUIM. Data gap analysis completed for an area of 5.89 lakh sq.km. in Aquifer mapping programme. Ground water recharge and Arsenic mitigation along Ganga basin: Action Plan for pilot under preparation Constraints: Only 93 crore funds available

9 AIBP- Issues/Constraints
Budget of the Ministry has been drastically cut, Only Rs 1000 crore available for National Projects and MMI Scheme PMKSY- Rs 1000 crore available for CADWM,RRR & MI and other schemes proposed by state including Ground Water Funding pattern being finalized No money for Ken Betwa interlinking, Siang Middle , Lakhwar,Renuka, Kishau Projects

10 JAL Kranti Abhiyan- Issues/constraints
To be launched from 15th May 2015.Guidelines under submission. Development of model command area

11 Flood Management Programme
Funds for the approved proposals will be released on priority Release will be proportioned within allocated BE of Rs 200 crore A cushion of Rs 50 crore for flood protection works on Ganga from Mirzapur to Varanasi and emergent works on Jhelum will be kept Constraints: Insufficient funds

12 Flood Forecasting CWC started flood forecasting in J&K at Rammunshibagh on Jhelum near Srinagar. New flood forecasting web site launched for timely dissemination of flood data. Suitable advisories issued to States during unprecedented floods and very severe cyclonic storms (HUDHUD and NILOFER). Regional office of GFCC opened at Lucknow for better coordination.

13 Polavaram Projects Notification of Polavaram Project Authority issued.
Rs. 250 crore released for Polavaram Project A CEO and other senior officers appointed. First meeting of the Polavaram River Project held in March 2015 Constraints: Investment clearance from NITI AYOG for revised cost

14 PANCHESHWAR PROJECT Pursuant to Article 10 of Mahakali Treaty, Indo Nepal Pancheshwar Development Authority (PDA) for implementation of Pancheshwar Multipurpose project set up. Two meetings of its Governing Body have been held 3+DPR under preparation by WAPCOS Constraints: Finalization of funding pattern & involvement of Nepalese side in DPR

15 Siang Middle Projects A cumulative basin impact study for Siang sub-basin of Brahmaputra basin carried out and master plan based strategy on hydro development was developed paving way for development of 17,800 MW hydropower Meeting with Chief Minister of Arunachal Pradesh held in April 2015 Constraints: No funds for this project in this year

16 E Governace Iniatives Handy pocket books highlighting the achievements of Ministry launched by Hon’ble Minister on E Book uploaded on website Online portal for grant of NOC for extraction of ground water started E procurement hands on training organized in association with NIC Web based water resources information system on GIS platform – India-WRIS was maintained. Unclassified data of CWC and CGWB placed on portal for public access.

17 THANKS


Download ppt "MINISTRY OF WATER RESOURCES,RIVER DEVELOPMENT &GANGA REJUVENATION"

Similar presentations


Ads by Google