Presentation is loading. Please wait.

Presentation is loading. Please wait.

Harbour Esplanade - Deteriorating Wharf. Artist’s Impression.

Similar presentations


Presentation on theme: "Harbour Esplanade - Deteriorating Wharf. Artist’s Impression."— Presentation transcript:

1 Harbour Esplanade - Deteriorating Wharf

2 Artist’s Impression

3 Demolish Raised Wharf Decks & Commence Deck Reconstruction

4 Construction of Heritage Shed

5 Complete North End Ground Plane: 2 Wharf Decks & 1 Heritage Shed

6 Artist Impression of Completed Stage 2 A day down at the dock

7 Waterfront Attractions markets | recreation | events | boat building

8 Harbour Activities sailing | heritage ships | dragon boats | boat festivals | commercial operations

9 Now: Almost 350 children aged under 15 in Docklands ABS 2011 Census data: 0-4 years215 5-14 years128 + 245 young people aged 15-19 Docklands residents who go to school (Government and non-Government schools): Pre-school31 Primary School56 Secondary School152 TAFE or Uni751

10 By 2016: Almost 800 children aged under 14 in Docklands

11 Docklands School Bid Process May 2013 - bid process commenced to secure a private school in Docklands Subject site is located in Digital Harbour precinct (2,050m2) Mandatory bid requirement that the school includes a primary component (preparatory to yr 6)

12 Docklands School Bid Process School can be developed as a stand alone project or as part of a larger mixed use development An innovative vertical school model is sought in place of a traditional campus style approach to maximise the site opportunity Construction must commence by late 2014

13 Docklands School Bid Process Bid Process Communications advertised in AFR and The Age (2 and 4 May) notification letters sent to private school associations (2 May) notification email sent to Docklands Developers (2 May) briefing session held for registered parties (20 May) Register interest in the bid process and download bid documentation at: www.places.vic.gov.au/tenders.www.places.vic.gov.au/tenders

14 Docklands School Bid Process Timeframe bids must be received by 3pm Friday 14 June 2013 preferred bidder(s) selected mid / late July 2013 successful developer selected mid / late 2013 construction to commence by November 2014 Bids will be assessed against a range of criteria by teams selected from Places Victoria and the City of Melbourne.

15 Implementation Update Docklands Community Forum 29 May 2013

16 Garden Shelter (CoM lead) Building Permit approved and construction ready to proceed Access to site for shelter construction not expected until mid/late June due to hoardings

17 The Glass House (temporary activation) (PV lead) Sustainable outdoor communal backyard – plant installation and café. Construction contract signed. Fabrication commenced May; on-site works by late July.

18 Temporary Landscape (CoM Lead) Project in costing phase Initial application planned to complement the Glass House in Harbour Esplanade

19 Floating (Barge) Stage for Events (CoM lead) Successful Alma Doepel ship lift and barge move to Docklands in April CoM to explore future usage options for barge (post- completion of ship repairs)

20 Place of Worship (PV Lead) State Government planning policy Preferred Bidder in place – announcement later in 2013

21 Community Boating Hub / Family Services (Joint Project) Funding arrangements finalised CoM scoping Family Services component

22 Library and Community Centre (Joint Project) Sub-structure works complete Library to reach PC December 2013, opening in March 2014

23 Docklands Spaces being implemented First spaces opened: o Studio batch (industrial design) & Musk Architecture o Bird + Plane (picnic hampers) o NON (creative production) Project now expanding to NQ Central and HarbourTown Spaces for Community and Creative Enterprises (Joint Project)