Piping network THE PIPING SYSTEMS
2
Compressor room Flexibles Isolating valves Bucled main ring Global piping network design Inlet and Main drain Air drops Adapted tank
3
Compressor room Global piping network design Compressor room should be : Large for an easy maintenance : Insulated and with a good aeration Flexibles will allow to : Move easily the different machines : Stop vibrations transmission Flexibles
4
Global piping network design Tank will be well adapted : Compressor flow in L/mn : 3 = tank volume in liters Main drain and valve : Drain can be at the tank or down the ring inlet : Will eliminate the first condensates before coming in the piping Main drain Adapted tank
5
Global piping network design Buckled main ring : Better flow at any point of the network : Pression is equal all along the pipe. Bucled main ring Isolating valves : Allow a ring portion isolation for maintenance or modifications Isolating valves
6
Global piping network design Air drops : Adapted diameter (20 mm is advised) : A good number of drops will avoid too many flexibles on the floor. Air drops
7
Piping network calculation Pipe diameter (mm*) Line lenght CV x 7 = M3/h KW x 10 = M3/h 1) Flow calculation : 2) Pipe lenght : Mesure the maximum lenght between the air inlet and the furthest air drop. 3) Pipe diameter : (*) SCFM x 1,7 = m3/h
8
The mounting 1) Wall supports : Each 3 meters 2) Main line : Don ’t forget expansion flexibles for lenght more than 40 - 50 m 3) Drops : Blow chips before mounting the couplers or others accessories Wall supports Expansion flexibles
9
The Prevost ALR connection system Polyamid nut 316 L Stainless steel teeth ring The ALR system nitril O ’ring Polyamid body Polyamid pushing ring
10
The airdrop design The Prevost ALR drop system A curved pipe can be necessar to reach the wall Air pipe Air outlet Condensation Drilling guide
11
The airdrop design The Prevost ALR drop system 2 : Rotation 180° 3 : Tight the screw 1 : Drill Positioning mark
12
The airdrop design The Prevost ALR drop system 1/2 or 3/4 Inlet metal insert Easy mounting 1/2 outlet metal inserts Drain in option Angle : 45° lateral and 45° vertical 120 / 150 cm
13
The ALR system The Prevost ALR Technical Data Aluminium 6060 alloy. Density 2,7 kg / dm31) Aluminium pipe : Chromophosphatizing treatment of inside and outside surfaces 2) Surfaces treatment : Thermoplastic technopolymere compounds4) Composite connectors : Standard blue electropainting3) Coloration pipe : AISI 316 and AISI 403 stainless steel standards5) Connectors metal parts : Nitrile rubber (NBR)6) Seals material : -20 C° to +70 C°7) Temperatures : DL = 0,024 x L x DT°8) Expansion : Compressed air, water, drinking water, alimentary liquids9) Fluids transported :
14
The Prevost ALR standards The ALR system UNI standard 9006 / 11) Aluminium pipe : ISO 727, DIN 8063, NF T54028, KIWA 54, UNI 7441-75 & UNI 7442-75 2) Pipes and fittings : UNI 8470, UNI 84714) Valves : ISO 228 / 1, DIN 2999, UNI 338, BS 213) Cylindrical threading : AISI 316 and AISI 403 stainless steel standards5) Connectors metal parts :
15
The ALR system EXAMPLEOFCALCULATION
16
Outlet 1 ’ ’1/4 BSP Femelle
17
The ALR system ( 36m x 2 ) + ( 30m x 2 ) = 126m for the main ring 126m / 3 = 42 supports Step 1 : The supports
18
The ALR system 35 ( cv ) x 7 = 245 M3/h flow => Diameter = 40 mm Step 2 : The main ring 126m / 4 = 32 tubes Unions will be : ALR UN40 ( 30 pieces ) 126m / 2 ( Bucled loop ) = 63m
19
The ALR system Step 3 : The flexibles Diameter corresponding to 40mm = 1 ’ ’ Flexibles will be : FLEX FFT 34 (4 pieces ) Corresponding connectors will be : ALR PM4034 ( 8 pieces )
20
The ALR system Step 4 : The isolating valves Valve corresponding to 40mm = ALR VA40 ( 4 pieces )
21
The ALR system Step 5 : The drops Drops diameter = The most frequently 20mm The drop connector will be : ALR BP 4020 ( 8 pieces ) The drop tubes will be : ALR TU20 ( 8 pieces )
22
The ALR system 1) Drop connector : ALR BP4020 2) Male threaded connector : ALR PM4034 3) Wall support : AVR Y 1212P Step 5 : The drops
23
The ALR system Step 6 : The inlet pipe Inlet pipe diameter = 40mm The tank outlet is 1 ’ ’1/4 femelle thread
24
The ALR system Step 6 : The inlet pipe 1) Equal TEE connector : ALR TE40 3) Equal TEE connector : ALR TE40 4) Male threaded connector : ALR PM4034 5) Flexible : FLEX FFT42 6) Main drain valve : ALR VA40 2) Main valve : ALR VA40