1 1 Date 00.00.00 Simon Gyde Route Asset Manager, Buildings Simon Gyde

2 Riviera stations regeneration Section number to go here

3 Date 00.00.00Create your footer by changing copy in the Header and Footer section3 Riviera Stations regeneration Major renewals and refurbishment planned at: Torquay Torre Paignton Works programmed late 2013 – April 2014. Network Rail funded works c.£2.8m

4 Date 00.00.00Create your footer by changing copy in the Header and Footer section4 Torquay station Phase 1 - Agreed package of reactive repairs completed 2012. AFC £50k. Phase 2 - Road bridge at country end of the station to be refurbished. AFC £400k. On site 20 May 2013 for 18 weeks. Phase 3 - Station footbridge and canopies to be refurbished late 2013 – April 2014. AFC £1.15m.

5 Date 00.00.00Presentation title to go here55 Torre station Phase 1 -Refurbishment of listed footbridge completed 2012. Total AFC: £350k Phase 2 – platform canopy to be refurbished late 2013 – completion by April 2014. Total AFC : £150k

6 Date 00.00.00Presentation title to go here66 Paignton station Ticket office roof repairs complete Spring 2013. Station footbridge and canopies to be refurbished late 2013. AFC: £1.13m Works to be completed by April 2014. New colour scheme proposed to match that of Torquay and Torre.

7 Date 00.00.00Create your footer by changing copy in the Header and Footer section7 In summary.. Major refurbishment proposals at Torquay, Teignmouth and Torre aim to restore the listed buildings and structures to former glory. ‘Riviera line’ colours scheme to be adopted at each location. All proposals will be fully integrated with other Non – Network Rail work items and funding streams. Work programmes to be shared with stakeholders. Total expenditure 2013 /14 = c.£2.8m Plus… similar packages of work proposed in 13/14 at Dawlish and Teignmouth stations.

8 Date 00.00.00Create your footer by changing copy in the Header and Footer section8 Riviera station regeneration Questions?