Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group.

Similar presentations


Presentation on theme: "Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group."— Presentation transcript:

1 Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

2 Overview of AWEA – Mission – Members – TLWG – Transportation Logistics Working Group North America Wind Energy – Early Beginnings – Transition Years – Current Status Wind Farm Locations

3 Founded in 1974 More than 2,500 business members – Wind project developers – Transportation and construction companies – Manufacturers from bolts to turbines More than 8,000 parts in a turbine www.AWEA.org provides extensive info on wind AWEA – American Wind Energy Association

4 Trade association for the wind energy industry Over 2,500 business members www.awea.org Develops policies and conducts analysis to support wind industry growth Executes wind industry’s legislative agenda Promotes wind energy through advocacy, advertising and media relations Convenes conferences and workshops to educate the public and bring industry members together

5 TLWG - Transportation Logistics Working Group AWEA has established a Transportation and Logistics Working Group (TLWG) to identify the key transportation challenges facing the industry and work toward solutions to ensure wind energy growth continues on the path to 20% by 2030. Member companies involved in manufacturing, transportation and logistics are represented.

6 TLWG - Transportation Logistics Working Group There are key transportation and logistics challenges impacting all modes of transport. For trucking, challenges include a variety of state and local permitting rules for oversized/overweight loads; driver shortages and training; tight carrier capacity and non-optimized loads/scheduling; rising fuel costs; and hours of service constraints.

7 U.S. Wind Industry Timeline

8 U.S. Annual and Cumulative Wind Power Capacity Growth (Utility-Scale Wind) The wind industry installed 5,116 MW in the U.S. in 2010 15% growth in 2010 Total U.S. wind installations stand at 40,181 MW Average annual growth for the past five years was 35 % U.S. wind installations represent over 21% of global wind capacity Source: AWEA U.S. Wind Industry Annual Market Report Year Ending 2010

9

10 U.S. Wind Power Capacity Installations by State in 2010 (MW) 38 states have utility-scale wind installations. 14 states have more than 1,000 MW installed.

11 Wind Power Project Locations for 2009 and 2010

12 Manufacturing – History Import – Transition to North American Factories Shorten The Supply Chain – Employment Value to State and Local Governments Growth during Recession

13 Wind Power Manufacturing Locations 2004 Nacelle Factories 2004 Blade Factories 2004 Tower Factories 2004

14 All Online Wind-Related Manufacturing Facilities At the end of 2010, there were over 400 manufacturing facilities online making wind- related products. The online facilities span 42 states

15 U.S. Wind Industry Jobs by State Of the 75,000 jobs across the wind industry, Texas ranked No.1 with the largest amount of new capacity in 2010, energy- hub and offices in Houston and strong manufacturing across the state. Illinois took the No. 2 spot with strong 2010 installations and growing manufacturing base. With the recent heaving manufacturing investment in Colorado, the state ranked No. 3 in terms of wind jobs.

16 Winds Economic Ripple Effect for Jobs

17 U.S. Wind Industry Total Employment Over Time Manufacturing continued to grow in 2010, leading to a year-end total of roughly 20,000 jobs in wind-related manufacturing. Increase in permanent operations & maintenance jobs to help run the expanding wind power fleet. However, jobs in construction and the various service sectors that support project installation were reduced from 2009 due to the decline in new wind installations. Overall, even with the economic headwinds, the U.S. wind industry was still able to support 75,000 direct and indirect jobs in 2010, compared with 85,000 in 2009.

18 Nacelle Tower Section Blade Hub

19

20

21

22

23

24

25 Modes of Transport – Truck – Rail – Barge – Ship Current and Future Logistical Delivery – Multi-Mode

26

27

28

29

30 Challenges to deliver the product – Safety to the public – Multiple differences in the Commodities – Lack of Uniformity Weight restrictions Height Restrictions Route Continuity Pass Through Restrictions State /Police and Pilot Car Differences – County and City Changes and Restrictions – Construction

31 How Can We Improve The Process – Work closer with State and Local Governments – Wind Corridors – Uniformity Weight Length – Width – Height Police and Commercial Escort Requirements – Multi-State Routes – Multi-State Permits

32 On the Road to Success – WASHTO Multi State Permit – TxPROS – Texas Permitting and Routing Optimization System – Wisconsin OS/OW Freight Network – Regional State DOT/Permit Association SASHTO - MAASTO - NASTO

33 OS/OW Supply Chain Management OS/OW Freight Network On the Road to Success


Download ppt "Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group."