0 Haldia Power Station Presentation Title ( Arial, Font size 28 )
The Tata Power Company Ltd. Haldia Power Station Date, Venue, etc..( Arial, Font size 18 )

1 Geographical Position of HALDIA
Site Location : The Geographical location of the site is Latitude : Between ” and ’ 15” North Longitude : Between ’51” and ’44” East The Site is located close to the northern bank of river Hooghly. Haldia River is also flowing North West side of the site. The confluence of Hooghly River and Haldia River is within 1 km on the Southwest side of the project site. Nearest village is Ranichak, which is about 4 kms away from the site. Access to Site : The site is well connected by rail and road with Kolkata and Kharagpur. It is also accessible from Kolkata by Hooghly River via Kukrahati ferry ghat. Kukrahati ferry ghat is connected via road to Chaitanyapur and then to NH-41 linking the site with Haldia.

2 Geographical Position of HALDIA
Haldia Power Station

3 Project Summary

4 Process Diagram Waste Heat Boiler =16 Rated 24.5 TPH Coke Oven
Rows = 04 nos, Batteries= 32 nos, Ovens = 352 nos) Turbine & Generator. UNIT#1 = 45 MW UNIT#2 = 45 MW UNIT#3 = 30 MW 132 KV SWITCHYARD GT = 3 Nos ST = 4 Nos

5 Carbonization Process

6 Waste Heat Recovery System
Boiler Chimney I/L damper ID Fan O/L damper Coke Oven Bypass damper

7 Plant Schematics 2 1 3 4 Turbine & Generator UNIT-1 UNIT-2 UNIT-3 O W
K E o V N 2/1 R O W 1 C K E o V N R O W 3 C K E o V N 3/1 R O W 4 C K E o V N 1/1 4/1 2/2 3/2 1/2 4/2 2/3 3/3 1/3 4/3 2/4 3/4 1/4 4/4 Boilers Boilers

8 BOP Schematic BOILER TURBINE BFP CEP CONDENSER DEARATOR COOLING TOWER
#1-4 #2-4 #3-4 #4-4 #1-3 #2-3 #3-3 #4-3 #1-2 #2-2 #3-2 #4-2 COOLING TOWER #1-1 #2-1 #3-1 #4-1 TURBINE BFP 45 MW 45 MW 30 MW CEP CONDENSER DEARATOR EJECTOR GSC DRAIN COOLER LPH

9 Boiler Schematic Puppy Header Drum 2 nos of Evaporator 6 nos of
Drum 2 nos of Evaporator 6 nos of Economiser 3 nos of Super heater From FRS To TG through MS Common Header

10 Schematic of Electrical Network

11 Haldia Power Sale Schematic
OA Customer WBSEDCL WBSEDCL sale will be 1/6th of total power Rs 1.86 per unit. Rest of power sale to OA customer through TPTCL. TPTCL 132 KV Bus Aux. Power Cons. has been segregated from TATA Steel w.e.f. 14th Nov 2011. TATA Power 120 MW TATA Steel

12 Haldia Milestones….. Commercial Date of Operation of Unit #1 : 8th Aug’08 Start of Open Access power sale : 20th Dec’08 Commercial Date of Operation of Unit#2 : 23rd Dec’08 Commissioning of new DM Plant : 16th July’09 Completion of Renovation of 132 kV transmission line : 6th Aug’09 Commercial Date of Operation of Unit # 3 : 10th Sept’09 Aux Power Segregation : 14th Nov’11

13 Website: