Energy management for small & medium-sized manufacturers Nate Altfeather Industrial Sector Engineering Manager Focus on Energy
2
Topics Starting an energy efficiency program Tips and tricks for finding efficiency opportunities in your organization Focus on Energy for manufacturers
3
Power vs. energy 100,000 BTUh x 1 HOUR = 1 THERM 100,000 BTU/hr 1 HOUR POWERTIMEENERGY
4
1.3 hp = 1kW x 1 HOUR = 1 kWhr 1 kW 1 HOUR POWERTIMEENERGY Power vs. energy
5
Understanding energy kW TIME 17 kW
6
Energy management $ TIME
7
Where to start Understanding your potential –What is your annual energy expense? –Apply assumed potential savings ~10% –What can you do with this? Can I afford to hire a third party? Is it worth my time?
8
Understanding your energy profile EquipmentAvg. Power [BTU/hr or KW] Hrs/yrEnergy Use [therm or kWh] Cost of Energy Boiler1,000,0003,50035,000$28,000 Compressor377,500279,750$22,380 Lights206,000120,000$9,600 Total $/yr$59,980
9
Assess opportunity (in order of priority) 1.Do I even need my existing equipment? 2.Is my existing equipment working properly? 3.Is this the most efficient model/design? 4.What are the economics to upgrade?
10
Top 10 electric savings measures Industrial kWh: Jan 2010 – June 2010 implemented MeasureDescTxt UsagekWhSavings T8 lighting55323,993,485$1,919,479 Motor NEMA premium—all382453,663$36,293 Compresses air system leak repair total24923,221,456$1,857,716 Variable speed drive on pump/fan—all14818,476,423$1,478,114 Occupancy sensors—all1092,034,970$162,798 Air compressor equipped with VSD—all704,605,782$368,463 Custom projects—all (measure name starts with custom) 395,487,577$439,006 BOUNTY-T8—all2847,248$3,780 Chiller system tune-up, water/air cooled—all27508,512$40,681 All CFL related measures14130,327$10,434 Rooftop A/C—all843,327$3,466 Total$6,320,230
11
Top 10 gas savings measures Industrial Therm: Jan 2010 – June 2010 implemented MeasureDescTxt UsageThermsSavings Tune-up, boiler112505,816$404,653 Custom projects (measure name starts with custom) 39936,332$749,066 All dock door/ramp pit prescriptives3357,896$46,317 Repair leaking steam trap –all26185,789$148,631 Exhaust air heat recovery system8401,887$321,510 Linkageless boiler control, per output hp798,150$78,520 Process heat recovery6641,800$513,440 Boiler prescriptive space heating511,398$9,118 Infrared heating units—all46,782$5,426 Energy recovery ventilator—all42,925$2,340 Furnace with ECM fan motor—all41,519$1,215 Total$2,280,235
12
Contact Focus today Call: 800.762.7077 Email: focusinfo@focusonenergy.com Visit: focusonenergy.com Mail:Focus on Energy 431 Charmany Drive Madison, WI 53719 Nate Altfeather 608-277-2949 altfeathern@saic.com