Download presentation
Presentation is loading. Please wait.
Published byRoberta French Modified over 9 years ago
1
Building for the future... Capital Stewardship Campaign (CSC) Recommendation Vote
2
Building for the future... Agenda Welcome Review Council Recommendations and Congregational Modifications Vote
3
Building for the future... Recommendation Based on CFS recommendation, conduct a Capital Stewardship Campaign (CSC) for the purpose of: Construction of signage/improve frontage Retiring ACME debt Removal of ACME building and conversion of property into parking
4
Building for the future... Specific Recommendations Work with architect to develop detailed design for desired signage/building frontage Pay off ACME debt Solicit bids to demolish ACME building and develop parking lot, including moving generator shed Prepare a detailed long range plan for the growth of LCG physical plant and ministry Place additional funds in a building fund for future expansion of education wing (EW)/ Tender Shepherd Pre-School (TSP)
5
Building for the future... Follow-on Recommendations Develop and execute a detailed outreach plan Analyze current space usage to ensure maximum potential Work with architect to refine plans for the EW/TSP expansion Contact church construction missions to determine potential for assistance Based on pledges from 2008 CSC, consider earlier execution of follow-on phases Solicit additional sources of income above and beyond CSC
6
Building for the future... Long Term Recommendations Conduct a second CSC in 2011 to gather funds for EW/TSP expansion Ground breaking for EW/TSP expansion in Summer 2013 Conduct a third CSC in 2014 for debt reduction of EW/TSP construction Until construction of a new sanctuary, continue and increase multiple worship services to meet needs of the congregation
7
Building for the future... Move to accept Recommendations Second Vote
8
Building for the future... THANK YOU!
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.