JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING.

Similar presentations


Presentation on theme: "JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING."— Presentation transcript:

1 JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA US Army Corps of Engineers Jacksonville District US Army Corps of Engineers Jacksonville District Dan Beasley

2 Overview of SAJ FY08 Dredging Projects Florida Atlantic Ocean Gulf of Mexico Palm Beach Harbor Jacksonville Harbor & Mayport Naval Base Fernandina Harbor & Kings Bay Submarine Base Canaveral Harbor Manatee Harbor Tampa Harbor Port Sutton IWW Volusia County Captiva Island Beach US Army Corps of Engineers® Jacksonville District Nassau County Shore Protection IWW Jupiter Inlet Horseshoe Cove GIWW – Manatee Co

3

4 Fernandina Harbor, Kings Bay Entrance Ch Near shore Disposal Area Ocean Disposal Area

5 Project: Fernandina Harbor, Kings Bay Entrance Channel Type Work: Maintenance Dredging Depth: 49 feet + 2 allowable overdepth Width: 500 feet Length: Approximately 9 miles Quantity: 715,000 CY Type of Material: Sand and silt Placement Area: Beach/ODMDS Distance to Placement Area: 13 miles Type of Equipment: Hopper Small business Set Aside: No, unrestricted Last Dredged: 2007 Environmental Window: Yes, Dredging Prohibited 1 April – 14 December Reason for window: Sea Turtles FY 08 Funding: Between $1M and $5M Advertisement Date: 7 August 2007 Bid Opening Date: MATOC - To Be Determined Award Date: 3 December 7 Dredging Begins: 15 December 2007 Dredging Complete: 4 March 2008 Days to Dredge: 80 POC: Veronica Taylor, Contracting Specialist Ph: 904-232-2107

6 IWW Vicinity of Volusia County

7 Project:IWW Vicinity of Volusia County (Middle and North Reaches) Type Work: Maintenance Dredging Depth: 12 Feet + 2 Feet overdepth Width: 125 Feet Length: 15 Miles Quantity: 1,100,000 CY Type of Material: Sand Placement Area: Nearshore Distance to Placement Area: 2 miles Type of Equipment: Cuttersuction Small business Set Aside: Yes Last Dredged: 2003 Environmental Window: No FY 07 Funding: Between $10-$15M Advertisement Date: 7 August 2007 Bid Opening Date: MATOC – To be determined Award Date: 12 November 2007 Dredging Begins: 15 December 2007 Dredging Complete: 15 September 2008 Days to Dredge: 275 POC: Karla Garcia, Contracting Specialist Ph: 904-232-1015

8 Captiva Island Beach Renourishment Type of Dredge: Hopper/Spider Barge Quantity: 80,000 CY Distance to Borrow Area: 11 Miles Dates to Construct: Dec 07 – Jan 08 POC: Karla Garcia, Contracting Specialist 904-232-1015 Captiva Island Beach Renourishment Type of Dredge: Hopper/Spider Barge Quantity: 80,000 CY Distance to Borrow Area: 11 Miles Dates to Construct: Dec 07 – Jan 08 POC: Karla Garcia, Contracting Specialist 904-232-1015 SANIBEL ISLAND PINE ISLAND ESTERO ISLAND CAPTIVA ISLAND FORT MYERS BEACH MATANZAS PASS GASPARILLA ISLAND Gulf of Mexico BOCA GRANDE PASS Lee County

9 Mayport Naval Station – Jacksonville, Florida

10 Project: Mayport Naval Base, Jacksonville Florida Type Work: Maintenance Dredging Depth: 49 feet + 2 allowable overdepth Width: Varies Length: Approximately 1 mile Quantity: 600,000 CY Type of Material: Silt and Sand Placement Area: ODMDS/Upland Distance to Placement Area: 5 miles Type of Equipment: Hopper/Bucket & Pipeline Small business Set Aside: No, unrestricted Last Dredged: 2006 Environmental Window: None FY 08 Funding: Between $1M and $5M Advertisement Date: 7 August 2007 Bid Opening Date: MATOC - To Be Determined Award Date: 3 December 7 Dredging Begins: 21 January 2008 Dredging Complete: 21 April 2008 Days to Dredge: 91 POC: Veronica Taylor, Contracting Specialist Ph: 904-232-2107

11

12 Project: Jacksonville Florida Type Work: Maintenance Dredging Depth: 40 feet + 2 allowable overdepth Width: Varies Length: Approximately 15 mile Quantity: 200,000 CY Type of Material: Silt and Sand Placement Area: Upland Distance to Placement Area: 8 miles Type of Equipment: Hopper, Coast Guard Certified Small business Set Aside: No, unrestricted Last Dredged: 2007 Environmental Window: None FY 08 Funding: Between $1M and $5M Advertisement Date: 18 September 2007 Bid Opening Date: 23 October 2007 Award Date: 1 November 2007 Dredging Begins: 30 November 2007 Dredging Complete: 29 January 2008 Days to Dredge: 60 POC: Veronica Taylor, Contracting Specialist Ph: 904-232-2107

13

14 Project: Manatee Harbor – 1 st Contract Type Work: Maintenance Dredging Depth: 40 Feet Width: 400 Feet Length: Approximately 3 miles. Quantity: 60,000 CY Type of Material: Sand, Clay and shell Placement Area: ODMDS Distance to Placement Area: 34 miles Type of Equipment: Hopper Small Business Set Aside: No, unrestricted Last Dredged: 2002 Environmental Window: No FY 07 Funding: Between $1M and $5M Advertisement Date: 9 October 2007 Bid Opening Date: 8 November 2007 Award Date: 28 December 2007 Dredging Begins: 26 January 2008 Dredging Complete: 16 May 2008 Days to Dredge: 111 POC: Osvaldo Rodriguez 904-232-2909

15 Nassau County Atlantic Ocean GEORGIA AMELIA ISLAND NASSAU SOUND FERNANDINA BEACH FERNANDINA INLET Nassau County Shore Protection Project (SPP) Type of Dredge: Cutterhead Quantity: 2.4 Million CY Distance to Borrow Area: 4-5 Miles Length of Project: 3.6 Miles Dates to Construct: Apr 08 – Sep 08 POC: Rene Perez 904-232-1597 Nassau County Shore Protection Project (SPP) Type of Dredge: Cutterhead Quantity: 2.4 Million CY Distance to Borrow Area: 4-5 Miles Length of Project: 3.6 Miles Dates to Construct: Apr 08 – Sep 08 POC: Rene Perez 904-232-1597

16 IWW – Vicinity of Jupiter Inlet

17 Project:IWW Vicinity of Jupiter Inlet Type Work: Maintenance Dredging Depth: 11 Feet & 15 Feet + 1 Feet overdepth Width: 125 Feet Length: 2 Miles Quantity: 100,000 CY Type of Material: Sand Placement Area: Beach Distance to Placement Area: 1.5 miles Type of Equipment: Cuttersuction Small business Set Aside: Yes Last Dredged: 2003 Environmental Window: Yes November - April FY 07 Funding: Between $1-$5M Advertisement Date: 2 November 2007 Bid Opening Date: 17 December 2007 Award Date: 2 January 2008 Dredging Begins: 2 March 2008 Dredging Complete: 30 April 2008 Days to Dredge: 59 POC: Rick McMillen Ph: 904-232-1231

18

19 Project:Palm Beach Harbor Type Work: Maintenance Dredging Depth: 33 & 35 Feet Width: Ranges from 300 to 400 feet Length: Approximately 1.8 miles Quantity: 150,000 CY Type of Material: Sand Placement Area: Beach Distance to Placement Area: Approximately.6 miles Type of Equipment: Hopper Small business Set Aside: No, unrestricted Last Dredged: 2007 Environmental Window: Yes, Dredging Prohibited 1 May – 31 October Reason for window: Nesting Sea Turtles FY 07 Funding: Between $1M and $5M Advertisement Date: 15 November 2007 Bid Opening Date: 1 January 2008 Award Date: 15 January 2008 Dredging Begins: 1 February 2008 Dredging Complete: 30 April 2008 Days to Dredge: 89 POC: Dan Haubner Ph: 904-232-2798

20 Canaveral Harbor

21 Project:Canaveral Harbor Type Work: Maintenance Dredging Depth: 44 Feet + 2 Foot allowable Width: 400 feet Length: Approximately 2 miles Quantity: 265,000 CY Type of Material: Sand Placement Area: ODMDS/Nearshore/Upland Distance to Placement Area: Approximately 11.5 miles Type of Equipment: Mechanical Small business Set Aside: No, unrestricted Last Dredged: 2007 Environmental Window: Yes, Hopper Dredges prohibited year round Reason for window: Sea Turtles FY 07 Funding: Between $1M and $5M Advertisement Date: 31 December 2007 Bid Opening Date: 30 January 2008 Award Date: 29 Feb 2008 Dredging Begins: 27 April 2008 Dredging Complete: 15 August 2008 Days to Dredge: 110 POC: Osvaldo Rodriguez Ph: 904-232-2909

22 Kings Bay Navy Base

23 Project:Kings Bay Naval Submarine Base Type Work: Maintenance Dredging Depth: Varies Width: Varies Length: 2 Miles Quantity: 1,100,000 CY Type of Material: Sand & Silt Placement Area: Upland Distance to Placement Area: 2 miles Type of Equipment: Cuttersuction Small business Set Aside: Yes Last Dredged: 2006 Environmental Window: No FY 07 Funding: Between $1-$5M Advertisement Date: 10 January 2008 Bid Opening Date: 18 February 2008 Award Date: 3 March 2008 Dredging Begins: 13 April 2008 Dredging Complete: 14 July 2008 Days to Dredge: 92 POC: Dan Haubner Ph: 904-232-2798

24

25 Tampa Harbor Port Sutton Dredge Type: Cuttersuction Quantity: Based on Survey Distance to Disposal: Based on Survey Length of Project: Based on Survey Dates to Construct: Jul 08 – Sep 08 POC: Jackie Keiser 904-232-3915

26 Project:Horseshoe Cove Type Work: Maintenance Depth: 8 Foot Width: 80 Length: 2 Miles Quantity: 200,000 CY Type of Material: Sand & Silt Placement Area: Upland Distance to Placement: 2.3 miles Type of Equipment: Cuttersuction Small business Set Aside: Yes Last Dredged: 1997 Environmental Window: No FY 07 Funding: Between $1-$5M Adv Date: 11 April 2008 Bid Op Date: 3 June 2008 Award Date: 17 June 2008 Dredging Begins: 1 August 2008 Dredging Complete: 1 Nov 2008 Days to Dredge: 92 POC: Rick McMillen Ph: 904-232- 2798

27

28 Project: Manatee Harbor – 2nd Contract Type Work: Maintenance Dredging Depth: 40 Feet Width: 400 Feet Length: Approximately 3 miles. Quantity: 300,000 CY Type of Material: Sand, Clay and shell Placement Area: Upland Distance to Placement Area: 3 miles Type of Equipment: Cuttersuction Small Business Set Aside: No, unrestricted Last Dredged: 2002 Environmental Window: No FY 07 Funding: Between $1M and $5M Advertisement Date: 7 April 2008 Bid Opening Date: 5 June 2008 Award Date: 8 July 2008 Dredging Begins: 7 August 2008 Dredging Complete: 28 November 2008 Days to Dredge: 113 POC: Osvaldo Rodriguez 904-232-2909

29 GIWW CR to AR – Manatee County/Venice Inlet

30 Project:Gulf Intracoastal Waterway – CR to AR Type Work: Maintenance Depth: 10 Foot Width: 100 Length: 2 Miles Quantity: 270,000 CY Type of Material: Sand Placement Area: Beach Distance to Placement: 2 miles Type of Equipment: Cuttersuction Small business Set Aside: Yes Last Dredged: Unknown Environmental Window: No FY 07 Funding: Between $1-$5M Adv Date: 1 August 2008 Bid Op Date: 1 September 2008 Award Date: 1 October 2008 Dredging Begins: 1 November 2008 Dredging Complete: 1 December 2008 Days to Dredge: 30 POC: Rick McMillen Ph: 904-232-2798