Prague 2004. Plant Data Kilns 2 x 1,300 tpd clinker  Vertical Coal Mill 15 tph  Cement Mills 3 x 100 tph + 1 x 30 tph  Own Quarries for Marl, Limestone.

Similar presentations


Presentation on theme: "Prague 2004. Plant Data Kilns 2 x 1,300 tpd clinker  Vertical Coal Mill 15 tph  Cement Mills 3 x 100 tph + 1 x 30 tph  Own Quarries for Marl, Limestone."— Presentation transcript:

1 Prague 2004

2 Plant Data Kilns 2 x 1,300 tpd clinker  Vertical Coal Mill 15 tph  Cement Mills 3 x 100 tph + 1 x 30 tph  Own Quarries for Marl, Limestone and Sand  Reserves of Raw Materials: Approximately 30 Years for marl and limestone  Insulation Material Production Plant  RMC Plant  Number of Employees: 574

3 Location of “USJE” Located in the southeastern part of Skopje 3.5 km. from the center of the town Surrounded by civilian houses

4 The location of the factory brings up the: ENVIRONMENTAL QUESTION

5 The manufacturing of the cement influences the environment Excavation of the raw materials changes the landscape Transportation of the raw materials as a source of dust The production of clinker has the biggest impact on the environment –Big usage of energy –Air emissions ( dust, SO 2, NOx, CO…) Storage of clinker, grinding of clinker and packing of cement are also dust sources

6 technicaltechnological The environmental impact of the working processes of “USJE” has been mitigated through the technical and technological interventions

7 accomplished These improvements are accomplished through the years 1993 – Two concrete silos for clinker ( 25000 tones each ) with a closed belt conveyer and a complete dedusting system 1993 – Electrostatic precipitator for clinker cooler ( each kiln has it ) 1997 – Gasification of the boiler room for production of steam

8 1999 – Bag filters for cement mills 4, 5 & 6 1999 – Bag filter for rotary Kiln No. 3 2001 – Vertical mill for petcoke, with bag filter and system for fire protection 2003 – Bag filter for rotary Kiln No. 4 2004 – Puzzolana substituted by Fly Ash

9 Continuous Emissions Monitoring Installation of a network which connects all measuring instruments –Instruments for dust measurement installed on: Coal Mills Cement Mills Raw Mill Preparation Exhaust Gases –Instruments for measurement of SO 2, NOx, and flow installed on: Stack

10 August 2004 – integration of all “in – situ” signals in the network (company “SICK” has installed the software program “MEAC 2000”) ON – LINE regular reporting on a 30 min basis

11 Trial use of shredded tyres as an alternative fuel in rotary Kiln No. 4 Phase 1: Phase 1: Getting necessary permissions Phase 2: Phase 2: ACTION PLAN – Internal preparation of the plant Phase 3: Phase 3: Experimental testing: 15 th – 17 th September 2004 Phase 4: Phase 4: Results from the testing

12 Environmental Legislation Current Law in force –Limit values: SO 2 = 400 mg/Nm 3 ( mean 67,9-USJE ) NOx = 1300 mg/Nm 3 (mean 834,6-USJE) Dust = 50 mg/Nm 3 (mean 15,8-USJE) Proposed version that is in Parliamentary procedure adjusted to the EU Law

13 To comply with BAT Raw materials handling and storage –Pre-blending system –Excess clinker storage Fuel preparation –Bag filter for the horizontal coal mill Process –Process optimisation –NO x reduction

14 To comply with BAT Process (cont.) –Electricity use optimisation –ESP reconstruction or bag filters for cement mills –Bag filters for clinker coolers –Noise reduction EMS establishing –ISO 14000

15 Cost/Benefit Analysis for BAT compliance Estimated total Investment costs  6.100.000  (consultants estimation) Estimated Difference in Operation Costs  - 475.000  / year (consultants estimation) (Only SNCR increases operation costs)

16 Conclusion 1.Applying BAT will have an impact on the competitiveness of the company due to a long pay-back period 2.The impact can be minimised by allowing a reasonable number of years for successive investment


Download ppt "Prague 2004. Plant Data Kilns 2 x 1,300 tpd clinker  Vertical Coal Mill 15 tph  Cement Mills 3 x 100 tph + 1 x 30 tph  Own Quarries for Marl, Limestone."