Presentation is loading. Please wait.

Presentation is loading. Please wait.

PBN and Regional Aircraft Pierre Alibert Marchi Product Development Engineer - Avionics, October 17 th, 2012 Legacy, turboprop and regional issues.

Similar presentations


Presentation on theme: "PBN and Regional Aircraft Pierre Alibert Marchi Product Development Engineer - Avionics, October 17 th, 2012 Legacy, turboprop and regional issues."— Presentation transcript:

1 PBN and Regional Aircraft Pierre Alibert Marchi Product Development Engineer - Avionics, October 17 th, 2012 Legacy, turboprop and regional issues

2 2PBN and Regional Aircraft Embraer Commercial Airplanes 37 PAX ERJ-135 1,750nm ERJ-140 1,650nm In Service Since 1998 In Service Since 2000 Embraer 170 2,100nm ERJ-145 1,550nm In Service Since 1995 In Service Since 2004 Embraer 175 2,000nm In Service Since 2004 Embraer 190 2400nm In Service Since 2005 44 PAX 50 PAX 70 - 80 PAX 78 – 88 PAX 98 – 114 PAX 108 – 122 PAX Honeywell Primus 1000 Honeywell Primus Epic In Service Since 2006 Embraer 195 2200nm

3 3 Introduction – Basic Assumptions  Constructed based on NextGen Operational Statistic (Commercial Aircraft Fleet Readiness Estimative) given by FAA Equipment Interoperability Other Transaction Agreement Project.*Additional information with Mr. Ronald L. Stroup - ronald.l.stroup@faa.gov.  PBN NextGEN Operations Definition:  World wide Commercial Aircraft Fleet Classification :  Regional Aircraft: ERJ-135/140/145, E 170/175, Dash8/Q400, CRJ100/200, CRJ700, CRJ900/705, CRJ1000  Wide-body: 747-400, 747-8, 767, 777, 787, A300, A330/340,A380, A350  Narrow-body: 737NG Family, A320 Family, E 190/195, CS100, CS300 PBN and Regional Aircraft Regional Aircraft Scenario

4 4PBN and Regional Aircraft Enroute Operations BasicInterim

5 5PBN and Regional Aircraft Terminal Operations (SID, STARS) BasicInterim

6 6PBN and Regional Aircraft Approaches Operations BasicInterim

7 7PBN and Regional Aircraft AR Approaches Operations BasicInterim

8 8  Basic RNAV capability already can bring significant benefits: Enroute optimization (using RNAV 5, RNAV 1 and 2), improving capacity and reducing fuel consumption, noise levels, etc.; Replacing conventional routes with RNAV routes leads to reduced maintenance of conventional navaids (eg:NDB, VOR); Terminal airspace optimization and reduced controller-pilot communication. Improves the predictability and situational awareness since it creates a repeatable ground track and patterns of depature and arrival. PBN and Regional Aircraft Conclusion – Are we ready to go?

9 9  Many of the current regional aircraft cannot meet more stringent PBN requirements without retrofits that are often too costly, e.g.: incorporation of a VNAV capability, inertial, etc. Due to current forecasts of service, the economics to justify such retrofit costs may not exist. Therefore we recommend: To explore more the use of RNAV basic capabilities; Consider that for more stringent requirements, the future airspace must accommodate those aircraft without major operational restrictions; Exemptions for mandates need to be considered;  Standards and Requirements need to be frozen in advance of the expected entry into service. In general 3-5 years is necessary; Developments based on preliminary standards add risks and possible re-work. PBN and Regional Aircraft Conclusion – Are we ready to go?


Download ppt "PBN and Regional Aircraft Pierre Alibert Marchi Product Development Engineer - Avionics, October 17 th, 2012 Legacy, turboprop and regional issues."

Similar presentations


Ads by Google