UES Measure Sunsets Regional Technical Forum December 17, 2013
2
UES Measure Sunsets Need to extend sunset date for the following measures: o Air Source Heat Pump Conversions MH o EnergyStar and EcoRated Home MH Reason: Waiting on SEEM calibration for MH Expected: 7/31/14 o PTCS Commissioning, Controls, & Sizing SF Reason: Waiting on LMI decision, revised spec, provisional research plan Expected: 3/31/14
3
UES Measure Sunsets Need to extend sunset date for the following measures: o Built Green Washington o Energy Star Homes SF - WA o Energy Star Homes SF - WA DHP TCO (provisional) Reason: All above depend on new WA code baseline presented today Expected: 2/28/14
4
UES Measure Sunsets I ___________ move that the RTF extend the sunset dates as listed below for the following measures: MeasureSunset Date Air Source Heat Pump Conversions MH7/31/2014 EnergyStar and EcoRated Homes MH7/31/2014 PTCS Commissioning, Controls, & Sizing SF5/30/2014 Built Green Washington3/31/2014 Energy Star Homes SF - WA3/31/2014 Energy Star Homes SF - WA DHP TCO (provisional)3/31/2014
5
UES Measure Sunsets – NC Measures What is the RTFs level of interest in continuing individual new construction measures outside of BOPs? o i.e. Current PTCS Ducts Inside UES measure Difficult to determine baseline case where measure is a possible code compliance path o WA and OR code have Ducts Inside as a possible code compliance path How do we know measure wasn’t used to meet code? Developing multiple baseline cases is likely to require significant staff resources
6
Does RTF want staff to spend time updating PTCS Ducts Inside as a separate UES measure? o Are programs even offering this measure currently? Initial feedback from BPA was that it is not included in the measure database Or, should staff redefine measure to apply only in states where Ducts Inside is not a code path? If RTF does want to allocate staff resources to this measure, Ducts Inside needs a sunset date extension UES Measure Sunsets – NC Measures
7
I __________ move that the RTF (choose one): Deactivate the PTCS Ducts Inside UES Measure OR Redefine PTCS Ducts Inside for states where it is not a possible code compliance path, and extend the sunset date to Feb 28, 2014 OR Develop PTCS Ducts Inside for all states, and extend the sunset date to March 31, 2014. UES Measure Sunsets – NC Measures