Potlach Feeder #2 CR 65 Potlach Feeder #1 Dark Potlach site Non-permitted and improper placement of fill material in the two Potlach cold-water.

Similar presentations


Presentation on theme: "Potlach Feeder #2 CR 65 Potlach Feeder #1 Dark Potlach site Non-permitted and improper placement of fill material in the two Potlach cold-water."— Presentation transcript:

1 Potlach Feeder #2 CR 65 Potlach Feeder #1 Dark River @ Potlach site Non-permitted and improper placement of fill material in the two Potlach cold-water feeder streams, which are themselves designated trout streams, is a violation of Public Water Rules, Chapter 6115.0191, Subpart 7.

2 Potlach feeder #2 depicting fine material washed from the stream and placed on floodplain(riparian area) after bank-full rain event.

3 Potlach feeder #2 depicting damming, down-cutting, vehicle traffic, and washing of fine material from run-of-pit gravel.

4 Scene of Potlach feeder #2 in Fall 2007, depicting vehicle impacts, widening, down-cutting; and washing of fine material after placement of run-of-pit gravel without culvert installation.

5 Fall 2007 scene on the Potlach feeder #2 road crossing depicting erosion, downcutting, and fine material washing onto the flood plain after a bank-full rain event.

6 DNR Fisheries and its project co-sponsors’ low-water crossing at Potlach tributary #2 is NOT consistent with USFS guidance. Rule#1: Do NOT use run-of-pit gravel for creek fords!

7 Fall 2007 scene of the access road to rock and tree stockpiling area at the Potlach north site.

8 Stockpiled rocks and trees hauled on improved road crossings of Potlach tributary #1 and tributary #2. A “connected action” done prior to completion of the EAW process.