3  Refer to Advanced Utility Coordination Documentation and Concept Plans › Bright House Network HUB has been fully relocated and property has been vacated.

4 I. Description of Work FP ID 411011-4-52-01 Shall include removal of existing utility infrastructure as described in section VI. C. AT&T Bright House (non HUB) Teco Peoples Gas

5 I. Description of Work FP ID 411011-4-56-03 Includes performance of all of Hernando County’s utility design and construction. The Hernando County Utility Department (HCUD) Specifications - Water, Reclaimed Water and Wastewater Construction Specifications Manual (January 2013) are provided as an Attachment to the RFP Hernando County Utility Work Concept Plans are included as a reference document Coordinate with the Department and with Hernando County for final design approval. Design Build Firm shall become the Engineer-of-Record for the UWHCA plans, obtain all required permits and also be responsible for signing and sealing utility construction as-built plans in accordance with Hernando County standards.

6 B. Department Responsibility The Department will be responsible for paying the Utility Agency/Owners (UAO) for reimbursable relocation costs. This does not include any utility costs associated with relocating or re-building the existing guardhouse building at the LaRose Road entrance to the Withlacoochee State Forest’s Croom Motorcycle Area as described in Section I.

7 Department Commitments Hernando County Utility Work Removal of existing facilities for AT&T Bright House Teco Peoples Gas Avoidance of utility facilities either existing or adjusted in advance of this project as outlined within the RFP (and described in next few slides).

8 AT&T – Will relocate in advance of the construction by crossing under mainline I-75 at approximately STA 2048+26 LT to RT and then along the limits of SMF MC. The remainder of the AT&T’s facilities to be adjusted or relocated will be addressed during construction.

9 Teco Peoples Gas – Will relocate in advance of the construction by crossing under mainline I-75 at approximately 2042+14 LT to RT (4” PE) along the south side of SR 50 The remainder of the Teco Peoples Gas facilities to be adjusted or relocated will be addressed during construction.

10 Bright House Networks – Do not impact the underground existing facilities crossing under mainline I-75 from approximately STA 2047+46 LT to RT (3-2” conduit w/138ct FOC in 2 of 3 conduit) The remainder of the Bright House Network facilities to be adjusted or relocated will be addressed during construction.

11 Withlacoochee River Electric Cooperative – Do not impact the underground existing facilities crossing under mainline I-75 from approximately 4027+52 LT to RT (3-4” flex pipe & 1-2” communication line) The remainder of the Withlacoochee River Electric Cooperative facilities to be adjusted or relocated will be addressed during construction.

12 Hernando County – Do not impact the underground existing facilities crossing under mainline I-75 as described below at: South of SR 50 Sewer: 2035+30 LT to RT Water: 2035+50 LT to RT North of SR 50 Sewer: 2057+44 LT to RT Water: 2057+34 LT to RT

13 NOTE: Be sure to read entire section within RFP- DEVIATION FROM THE UTILITY RELOCATION PLAN: The Design Build Firm may request to deviate from the Department’s commitments above, however approval from both the Department and the affected UA/O(s) will be required. If the Design-Build Firm chooses to deviate from the Department’s commitments and receives approval, the Design-Build Firm shall be solely responsible for all increased costs incurred by the utility owner associated with the impact.

14 Removal of existing facilities for AT&T Bright House Teco Peoples Gas

15 Performance of all of Hernando County’s utility work.

16 All other effort as outlined in the executed or to-be-executed agreements.

17 › AT&T - executed › Bright House Networks  HUB - executed  Non-HUB - executed › Hernando County Utilities - executed › Teco Peoples Gas - executed › Withlacoochee River Electric – executed for engineering, pending for construction.

18  Directly after this meeting › Granite/Parsons1:00 – 2:00 › Lane/BCC 2:00 – 3:00 › Middlesex/Wantman3:00 – 4:00 › Prince/Stantec 4:00 – 5:00

19  MONDAY, September 15  Brooksville Training Room › Granite/Parsons9:30 – 10:30 › Lane/BCC 10:45 – 11:45 › Middlesex/Wantman1:15 – 2:15 › Prince/Stantec 2:15 – 3:15