Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 SmartWay Transport Partnership Upgrade Kit Call for Projects Call for Projects Workshop January 29, 2007.

Similar presentations


Presentation on theme: "1 SmartWay Transport Partnership Upgrade Kit Call for Projects Call for Projects Workshop January 29, 2007."— Presentation transcript:

1 1 SmartWay Transport Partnership Upgrade Kit Call for Projects Call for Projects Workshop January 29, 2007

2 2 SmartWay Transport Partnership Project Overview Goal: Demonstrate the effectiveness of Advanced Technologies in increasing fuel efficiency and reducing emissions from the trucking industry. Approach: Year-Long Demonstration Project Funding:EPA Grant Award$300,000

3 3 SmartWay Transport Partnership Demonstration Project 1.Eligible Applicants 2.Eligible Activities and Costs 3.Additional Requirements 4.Reporting 5.Project Schedule 6.Application Process 7. Selection Criteria

4 4 SmartWay Transport Partnership Call for Projects Eligibility Criteria Based in ozone nonattainment/maintenance area, and/or operate in DFW Metroplex and/or near US- Mexico Border

5 5 SmartWay Transport Partnership Call for Projects Eligibility Criteria (Continued) Travel consistent, dedicated routes over long distances Will contribute 50 percent of capital costs of fuel- saving and idle-reduction technologies Can maintain SmartWay tractor-trailer combination throughout project, OR create “trailer pools” where a SmartWay trailer is always available Able to maintain and track fuel economy consistently and reliably

6 6 SmartWay Transport Partnership Call for Projects Eligibility Criteria (Continued) Will include fuel economy data from a sampling of trucks traveling similar route that are NOT equipped with Upgrade Kits Willing to provide other project data such as fuel logs, receipts, truck/engine information, and characterization of operations Committed to operating, maintaining, and supporting Upgrade Kit technologies

7 7 SmartWay Transport Partnership Call for Projects Eligible Activities and Costs Upgrade Kits must include at least one of each of the following: 1.Fuel Saving Technology 2.Idle Reduction Technology 3.Emission Reduction Technology

8 8 SmartWay Transport Partnership Call for Projects Upgrade Kit Requirements Fuel-Saving Technologies: Single-Wide Tires Advanced Trailer Aerodynamics Automatic Tire Inflation Systems Low-Viscosity Lubricants Reimbursed 50 percent by NCTCOG

9 9 SmartWay Transport Partnership Call for Projects Upgrade Kit Requirements Idle Reduction Technologies: Auxiliary Power Units (APU) Heating/Cooling Systems Reimbursed 50 percent by NCTCOG

10 10 SmartWay Transport Partnership Call for Projects Upgrade Kit Requirements Emission Reduction Technologies: Diesel Oxidation Catalyst Crankcase Filter Diesel Particulate Filter Reimbursed 100 percent by NCTCOG

11 11 SmartWay Transport Partnership Call for Projects Data Collection Requires the following information for each participating truck: 1.Engine Control Module 2.Supporting Information

12 12 SmartWay Transport Partnership Call for Projects Reporting Once Upgrade Kits are installed, NCTCOG will require monthly reports Monthly reports must include: 1. Overall work status 2. Fuel economy data from the engine control module 3. Supporting documentation (fuel logs, etc.) 4. Identified problems during data collection 5. Any testing, inspection, maintenance, or calibration of engine control modules 6. Any other difficulties that may affect project schedule and proposed solutions

13 13 SmartWay Transport Partnership Upgrade Kit Call for Projects DRAFT Project Schedule CFP OpenedJanuary 15, 2007 Applications DueFebruary 23, 2007 ContractingMarch 2007 Technology Procurement andApril-June 2007 Installation Installation DeadlineJune 15, 2007 Data CollectionJune 2007-June 2008 Data AnalysisJune-July 2008 Final Report to EPAJuly 2008 Publicize Project ResultsJuly 2008 and on

14 14 SmartWay Transport Partnership Upgrade Kit Call for Projects Selection Criteria Eligibility Criteria20 percent SmartWay Transport Partner Status 5 percent Test Truck Operational Characteristics10 percent “Completeness” of Proposed Upgrade Kit20 percent Technology Costs10 percent Inclusion of Control Trucks 15 percent Demonstrated Ability to Perform 20 percent Data Collection Requirements

15 15 Contact Information Lori Pampell Transportation Planner 817-695-9232 lpampell@nctcog.org Carrie Reese Principal Transportation Planner 817-608-2353 creese@nctcog.org QUESTIONS AND ANSWERS


Download ppt "1 SmartWay Transport Partnership Upgrade Kit Call for Projects Call for Projects Workshop January 29, 2007."

Similar presentations


Ads by Google