Presentation is loading. Please wait.

Presentation is loading. Please wait.

L1 L2 L3 PE 1 2 3 1 3 5 -KKM1 2 4 6 M ~ 3P+PE -M1~ 3P+PE 6 7 8 9 10 11 1 2 3 -SO MAIN SWITCH 1 3 5 -KKM2 2 4 6 M ~ 3P+PE -M2~ 3P+PE 12 13 14 -KM1 A2 A1.

Similar presentations


Presentation on theme: "L1 L2 L3 PE 1 2 3 1 3 5 -KKM1 2 4 6 M ~ 3P+PE -M1~ 3P+PE 6 7 8 9 10 11 1 2 3 -SO MAIN SWITCH 1 3 5 -KKM2 2 4 6 M ~ 3P+PE -M2~ 3P+PE 12 13 14 -KM1 A2 A1."— Presentation transcript:

1 L1 L2 L3 PE 1 2 3 1 3 5 -KKM1 2 4 6 M ~ 3P+PE -M1~ 3P+PE 6 7 8 9 10 11 1 2 3 -SO MAIN SWITCH 1 3 5 -KKM2 2 4 6 M ~ 3P+PE -M2~ 3P+PE 12 13 14 -KM1 A2 A1 15 -KM2 A2 A1 16 -S1 -S2 4 5 67 5 6 7 8 BUTTON PROD.NAMEFR 224 ELECTRICAL DRAWN BYALİ DEMİREZEN DATE14/04/2003 CHECHEDADNAN AKAR

2 L1 L2 L3 PE 1 2 3 1 3 5 -KKM1 2 4 6 M ~ 3P+PE M~ 3P 6 7 8 9 10 11 1 2 3 -SO MAIN SWITCH 4 5 A2 A1 12 -S1 6 START BUTTON -KM1 5 6 SOIL PROD.NAMEFR 220 / 221 (400V) ELECTRICAL DRAWN BYALİ DEMİREZEN DATE14/04/2003 CHECHEDADNAN AKAR

3 L N PE 1 2 1 3 5 -KKM1 2 4 6 M ~ 3P+PE M~ 1P+N 4 5 6 7 8 1 2 -SO MAIN SWITCH 3 3 A1 A2 -S1 4 START BUTTON -KM1 4 5 TABLE BROWNBROWN BLUEBLUE YELLOWYELLOW -C1 CAPASITOR 9 5 PROD.NAMEFR 220 / 221 (230V) ELECTRICAL DRAWN BYALİ DEMİREZEN DATE14/04/2003 CHECHEDADNAN AKAR

4 PROD.NAMEFR 221 S PNEUMATIC DRAWN BYA.DEMİREZEN DATE27/10/2003 CHECHEDADNAN AKAR

5 PROD.NAMEFR 221 PNEUMATIC DRAWN BYA.DEMİREZEN DATE30/04/2002 CHECHEDADNAN AKAR LEFT CLAMPRIGHT CLAMP LUBRICATOR Y1

6 PROD.NAMEFR 224 PNEUMATIC DRAWN BYA.DEMİREZEN DATE30/04/2002 CHECHEDADNAN AKAR LEFT CLAMPRIGHT CLAMP LUBRICATOR Y1


Download ppt "L1 L2 L3 PE 1 2 3 1 3 5 -KKM1 2 4 6 M ~ 3P+PE -M1~ 3P+PE 6 7 8 9 10 11 1 2 3 -SO MAIN SWITCH 1 3 5 -KKM2 2 4 6 M ~ 3P+PE -M2~ 3P+PE 12 13 14 -KM1 A2 A1."

Similar presentations


Ads by Google