1 Coordination (R.C.) & UNDP Early Recovery Intervention and Livelihood Activities Baalback & Hermel Caza - Lebanon Wednesday, September 19, 2007 ECHO

2 Objectives Establish a UNRC field presence Establish a UNRC field presence Recovery activities Recovery activities Restore lives and Livelihoods Restore lives and Livelihoods Establishment of effective coordination mechanisms among various contributing bodies in the fields of recovery and development such as UN agencies and NGO’s Establishment of effective coordination mechanisms among various contributing bodies in the fields of recovery and development such as UN agencies and NGO’s Provide technical support to local authorities Provide technical support to local authorities

3 Coordination and Sectorial Meetings Coordination among local & International NGOs & local active institutions &CBOs Coordination among local & International NGOs & local active institutions &CBOs Identification of problems in each sector Identification of problems in each sector – Agriculture and environment sectors – Development and tourism sectors – Health and Education sector Solutions and Priorities of intervention Solutions and Priorities of intervention How projects can address the following issues: How projects can address the following issues: – Feasibility – Sustainability – Avoid duplication – Number of beneficiaries

4 Current status of the activities Since its inception early November 2006 the UNDP Bekaa-Sub office carried out the following: Since its inception early November 2006 the UNDP Bekaa-Sub office carried out the following: – Initial preliminary inception meeting with local authorities and municipalities (Mohafez, Qa’im Maqam, Federation of Municipalities, Local Communities, Civil Society Organizations) – Needs and damage assessments in affected villages – Prioritize and supervise a variety of interventions to reconstruct and rehabilitate affected areas

5 On-going Recovery Projects

6 Baalbak /Al Sayel RoadBaalbak /Al Sayel Road Pavement Pavement Lighting poles Lighting poles Sewage Connections Sewage Connections Storm Water Canal Storm Water Canal Landscaping Landscaping

7 ChmistarChmistar Storm Water Canal Storm Water Canal

8 ChwaghirChwaghir 1500 meters Irrigation Canal 1500 meters Irrigation Canal 2 Bridges over the Assi River 2 Bridges over the Assi River

9 HermelHermel Main entrance rehabilitation Main entrance rehabilitation Lighting poles Lighting poles Pavements Pavements Road Isles and signs Road Isles and signs Retaining walls Retaining walls

10 Completed Recovery Projects

11 BoudayBouday Municipal Roof & Premises Municipal Roof & Premises Lighting poles Lighting poles Generator Generator Irrigation Canals Irrigation Canals

12 Nabi Shiit Nabi Shiit Retaining walls Retaining walls Lighting poles Lighting poles

13 Al SaydehAl Saydeh Main Bridge Main Bridge Lighting Poles Lighting Poles

14 Al AinAl Ain Retaining walls Retaining walls Strom Water Drainage Canals Strom Water Drainage Canals Drinking Water Network Drinking Water Network

15 YounineYounine Lighting Poles Lighting Poles Retaining walls Retaining walls

16 Haddath BaalbackHaddath Baalback Bridge Bridge Retaining walls Retaining walls Lighting poles Lighting poles

17 BritelBritel Lighting poles Lighting poles Retaining walls Retaining walls Sewage Network Sewage Network

18 KhraibehKhraibeh Lighting poles Lighting poles Road Pavement Road Pavement Retaining walls Retaining walls

19 Zahleh – Civil Defense H.Q.Zahleh – Civil Defense H.Q. Well rehabilitation Well rehabilitation Pump, pipes, electrical wires and accessories Pump, pipes, electrical wires and accessories

20 Field Assessment of Trout farms. Damage assessment Damage assessment Proposed farm design Proposed farm design Best management practices Best management practices Define levels of intervention & support: Define levels of intervention & support: – Construction and rehabilitation of race ways (Ponds) – Technical support (shades, liners, demand feeders, air blowers, monitoring equipments) – Management –Trainings…etc – Provision of Alvins and fish feed

21 Field Assessment of Trout farms.

22 Forecasted livelihood projects in Northern Bekaa. Union of Northern Baalbeck (Nabi-Othman): Market place for fruits vegetables and local products Union of Northern Baalbeck (Nabi-Othman): Market place for fruits vegetables and local products Union of Baalbeck Municipalities (Baalbeck): Permanent Exhibition Hall Union of Baalbeck Municipalities (Baalbeck): Permanent Exhibition Hall Union of Agriculture Cooperatives-Deir Al Ahmar: Cold storage Upgrading - Additional cold storage room (140 m 2 ) Union of Agriculture Cooperatives-Deir Al Ahmar: Cold storage Upgrading - Additional cold storage room (140 m 2 ) Union of Hermel Municipalities: Trout fish Processing, Smoking & Packaging plant Union of Hermel Municipalities: Trout fish Processing, Smoking & Packaging plant Union of East Baalbeck Municipalities (Nabi-Sheet): Municipal Equipments (Hydraulic Excavator, Cistern truck, Skid Steer Loader, Wheel loader) Union of East Baalbeck Municipalities (Nabi-Sheet): Municipal Equipments (Hydraulic Excavator, Cistern truck, Skid Steer Loader, Wheel loader) Union of West Baalbeck Municipalities (Chmistar): Municipal Equipments (Hydraulic Excavator, Pick up broom, Skid Steer Loader, Wheel loader) Union of West Baalbeck Municipalities (Chmistar): Municipal Equipments (Hydraulic Excavator, Pick up broom, Skid Steer Loader, Wheel loader) Union of Al Challal (Bouday): Municipal Equipments (Hydraulic Excavator, Pick up broom, Skid Steer Loader, Wheel loader) Union of Al Challal (Bouday): Municipal Equipments (Hydraulic Excavator, Pick up broom, Skid Steer Loader, Wheel loader)

23 Areas of Intervention in Hermel Caza

24 Areas of Intervention in Baalback Caza