Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.

Similar presentations


Presentation on theme: "Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception."— Presentation transcript:

1 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception (test) Number of wafer PCB and Slab production PCB + Chip Gluing Si Sensors Slab assembly Cosmic test bench Beam Test (DESY) Structure Mechanical support Schedule

2 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Detector slab Structure 1 Structure 2 Structure 3 ACTIVE ZONE (18×18 cm 2 ) 62 mm Silicon wafers with 6×6 pads (10×10 mm 2 ) 62 mm Metal inserts (interface)  3 structures W-CFi ( 1,2,3 x1.4mm)  15 « detector slabs »  Dimension 200x360x360 mm  9720 channels in the proto. 200mm 360mm The ECAL prototype 360mm

3 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status tungsten 8.5 mm Carbone Fiber Detector slab Front End electronics zone Silicon wafer Shielding PCB SCSI connector Carbon Fiber Tungsten The ECAL prototype

4 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Silicon Wafers for the prototype 270 Number of active Wafer needed for the physic prototype : 270. Number of active Wafer needed for the physic prototype : 2 22 270.  150 will be produce by Institute of Nuclear Physics - Moscow State University (M. Merkin, A. Savin, A. Voronin) First test production : February 2003 Delivered : 145 matrices. Some problem : Leakage or depletion !  150 will be produce by Institute of Physics, Academy of Sciences of the Czech Republic – Prague (V. Vrba, P. Sicho ) First test production : March 2004 “Big” Problem with leakage current (aging) ! Today : 30 matrices.  150 will be produce by Institute of Nuclear Physics - Moscow State University (M. Merkin, A. Savin, A. Voronin) First test production : February 2003 Delivered : 145 matrices. Some problem : Leakage or depletion !  150 will be produce by Institute of Physics, Academy of Sciences of the Czech Republic – Prague (V. Vrba, P. Sicho ) First test production : March 2004 “Big” Problem with leakage current (aging) ! Today : 30 matrices. Silicon Sensors : Production we must check all wafers before gluing

5 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Silicon Sensors : Reception (Test) I(V)  Leakage & Breakdown I(t)  aging 36 pixels must be polarized Soon C(V)… Conductive Foam

6 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Silicon Sensors : I(V) Good Wafer Bad Wafer

7 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Silicon Sensors : I(time) Good Wafer Bad Wafer

8 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Silicon Sensors : New Prague Production Visit at EP : Petr Sicho (Institute of Physics, Academy of Sciences of the Czech Republic) Pavel Freundlich & Stanislav Kapsia (from ON semiconductor) New chemical treatment of surface … … Need to be confirmed in term of aging

9 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Silicon Sensors : Production

10 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Production : PCB + Chip TypeNeededProductOKTo be repaired PCB-C (Full)303429 85% 5 PCB-Right (Half)151812 67% 6 PCB-Left (Half)151814 78% 4 Mainly due to assembly

11 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Production : PCB + Chip + Wafer : Slab Full PCB : 9 + (1) Half PCB Right : 1 + (1) Half PCB Left : 1 + (0) Full Slab : 3 Half Slab : 0

12 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Example Run Number : 198 Date : 22/11/2004 Number of Events : 487653 Number of Events on wafers : 418910 Duration : 116 hours (~4,8 days) Cosmic test bench

13 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Cosmic test bench : histo

14 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Cosmic test bench : base line

15 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Cosmic test bench : rms noise

16 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Cosmic test bench : fit …

17 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Structure & Mechanical support Sept. 2004 : Structure 1 & 2 OK Feb. 2005 : Structure 3

18 Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Ecole Polytechnique December 10 : 4 Slab (structure 1) 4 Slab (structure 1) UK DAQ test with cosmic  one week UK DAQ test with cosmic  one week December 14 : 5 Slab (structure 1) End of December and beginning January : Slab production for structure 2 DESY Mid January 2005 : Mecanical support Mecanical support Structure 1 with 5 Slabs Structure 1 with 5 Slabs Structure 2 with 3 or 4 Slabs Structure 2 with 3 or 4 Slabs February and march : Completion of the full prototype Completion of the full prototype Schedule September 2005 : MTBF- Fermilab (electrons/pions/protons up to ~80 GeV) test beam with HCAL …


Download ppt "Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception."