Presentation is loading. Please wait.

Presentation is loading. Please wait.

WE ARE PLEASED TO UPDATE YET ANOTHER REMARKABLE NEWS ABOUT OUR RECENT PAST PROJECT WHICH‘S ONE OF AMONG BEST AND MEMORABLE PROJECT WE HANDLED IN THE MONTH.

Similar presentations


Presentation on theme: "WE ARE PLEASED TO UPDATE YET ANOTHER REMARKABLE NEWS ABOUT OUR RECENT PAST PROJECT WHICH‘S ONE OF AMONG BEST AND MEMORABLE PROJECT WE HANDLED IN THE MONTH."— Presentation transcript:

1

2 WE ARE PLEASED TO UPDATE YET ANOTHER REMARKABLE NEWS ABOUT OUR RECENT PAST PROJECT WHICH‘S ONE OF AMONG BEST AND MEMORABLE PROJECT WE HANDLED IN THE MONTH OF OCT/NOV 2014 WHERE MV. HAN ZHI APPOINTED TO OUR AGENCY SERVICES WITH COMPLETE LOGISTIC OPERATIONS. THE CARGO CONSISTED 179 HEAVY AND LONG PACKAGES OF PROJECT CARGO WHICH ARE WEIGHING AROUND 2311.0390 MTONS AND 7176 CBM APPROX. OUR STEVEDORES EFFICIENTLY AND SAFETY DISCHARGED THE CARGOES FROM VESSEL AND TAKE DIRECT DELIVERY UNDER HOOK/HOOK AND ARRANGED INSIDE TRANSPORTATION FROM BERTH TO STOWAGE AREA ALLOTTED BY THE PORT QASIM AUTHORITY, AT THE STOWAGE AREA WE MADE SOME SPECIAL ARRANGEMENT FOR HEAVY UNITS TO OFFLOAD ON JACK STAND FOR SMOOTH LOADING/SHIFTING, AND AS ON COMPLETION OF CUSTOM FORMALITIES WE ARRANGED INLAND TRANSPORTATION OF CARGOES TO JOB SITE WHICH’S DISTANCE TO 1460 KM APPROX.

3 Attock Refinery (ARL) signed contracts with Hyundai Engineering Company for execution of the ARL up-gradation project which comprises installation of a pre-flash unit, Isomerisation unit, Diesel Hydrodesulphurisation unit and expanding the capacity of existing captive power plant. The overall cost of the project amounts to $251 million, which will be financed with a debt-to-equity ratio of 80:20. After the installation of the pre-flash unit, ARL’s refining capacity will increase by 10,400 barrels per day or 25%. Once the Naphtha Isomerisation unit is completed, ARL will be able to enhance production of premier motor gasoline by 20,000 tons per month. The Diesel Hydrodesulphurisation unit will make Attock Refinery capable of producing low sulphur content high speed diesel, which burns cleanly and efficiently. Moreover, Hyundai Engineering has also been given the contract to expand ARL’s captive power plant by 18 megawatts (MW). The agreement was signed at a ceremony at ARL, Morgah, Rawalpindi, where ARL CEO Adil Khattak and Hyundai Engineering Company Project Director Won Ock Kim were present. Speaking on the occasion, Khattak said that the project will prove to be of immense value not only for ARL, but also for the country. He appreciated the efforts of both ARL and Hyundai’s project management teams for their hard work in concluding these agreements and hoped that refinery up-gradation project shall be completed within the agreed time frame. ARL’s CEO also thanked the Ministry of Petroleum and Natural Resources for enabling the local refineries to undertake up-gradation and expansion projects in the country. PROJECT OVERVIEW:-

4 “MV. HAN ZHI” ARRIVED AT: PORT QASIM PAKISTAN ARRIVED ON : OCT 01 2014 PORT OF LOADING: SHANGHAI CHINA BERTHED AT : MW # 02 CARGO MEANT FOR : ATTOCK REFINARY LIMITED (ARL) MORGAH RAWALPINDI : OIL AND GAS DEVELOPMENT COMPANY LIMITED, KARAHCI : CHINA HARBOUR ENGENEERING CO. LIMITED, DHA KARACHI COMMODITY: 137 HEAVY/LONG HAUL PACKAGES FOR UP-GRADATION PROJECT which COMPRISES INSTALLATION OF A PRE-FLASH UNIT, ISOMERISATION UNIT, DIESEL HYDRODESULPHURISATION UNIT AND EXPANDING THE CAPACITY OF EXISTING CAPTIVE POWER PLANT. : 12 PACKAGES /8 TH PARTIAL SHIPMENT AMINE ABSORBER, AMINE REGENERATOR, CONDENSATE STABLIZER INLET GAS ABSORBER, COLUM DE-ETHAIZER : 30 PIECES OF PRETENSIONED SPUN CONCRETE PILES TOTAL PACKAGES: 179 PACKAGES TOTAL WEIGHT: 2,311.0390 METRIC TONES TOTAL CBM : 7176 CBM APPROX

5

6

7

8

9

10

11

12 Suite 701, 7 th Floor, Business Plaza, Mumtaz Hassan Road, I.I. Chundrighar Road, Karachi – Pakistan Tel: +92-21-32415450-1 Fax: +92-21-32416128 E-mail: info@aarasshipping.com THANK YOU FOR YOUR TIME


Download ppt "WE ARE PLEASED TO UPDATE YET ANOTHER REMARKABLE NEWS ABOUT OUR RECENT PAST PROJECT WHICH‘S ONE OF AMONG BEST AND MEMORABLE PROJECT WE HANDLED IN THE MONTH."

Similar presentations


Ads by Google