1 PM work plan under the Convention on Long-range Transboundary Air Pollution Henning Wuester Secretariat of the United Nations Economic Commission for Europe http://www.unece.org/env/lrtaphttp://www.unece.org/env/lrtap (for general information) http://www.unece.org/env/tfiamhttp://www.unece.org/env/tfiam (for the Task Force)

2 Intergovernmental bodies, expert groups and scientific centres under the Convention

3 Tentative timetable for work on PM, adopted by EMEP: The basis z Broad timing: y Aimed at supporting the review of the Gothenburg Protocol in 2004. y 2003 reserved for testing and sensitivity analysis y Results of specialized studies and new data should be available by 2002 y 2001 for preparatory work z Coverage: acidification, eutrophication, ozone and exposure to fine particles involving SO 2, NO x, VOCs, NH 3 and the various species of particulate matter. Linkages to climate change policies. Here: only PM-relevant parts

4 Tentative PM timetable: contributors z EMEP (CCC, MSC-W, CIAM, TFIAM, TFMM, TFEIP) covers: y atmospheric modelling, y monitoring, y emissions & projections, y abatement costs, y integrated assessment modelling z Input from: y other bodies under the Convention (effects) and y work done by EEA and the EC y national contributions by Parties

5 Tentative PM timetable: Atmospheric modelling Autumn 2000 Preliminary PM modelMSC-W 2001Workshop on modelling aerosol dynamics MSC-W with Univ. Helsinki et al. Study on regional PM transportMSC-W with … Workshop on Hemispheric modellingMSC-W & CIAM, hosted by Canada & US Workshop on rural-urban linkages and O3 limiting factors MSC-W, hosted by Switzerland 2002Study/workshop on urban modellingEMEP ?, funded/hosted by CAFE (?), … Final 50x50km source-receptor matrices MSC-W

6 Tentative PM timetable: Monitoring Autumn 2000 Preliminary PM monitoring strategyCCC/TFMM 2001Monitoring plan for complianceTFMM, TFEIP, TFIAM Workshop on urban air qualityTFMM, EIONET, funded/hosted by EEA

7 Tentative PM timetable: Emissions and projections 2000Preliminary PM inventory (CEPMEIP) MSC-W, TNO, funded/coordinated by EMEP, EEA, CH, NL 2001Review of PM estimates by PartiesAll Parties, coordinated by MSC-W, CIAM Reporting guidelinesMSC-W, CIAM, TFEIP Reporting of 2000 PM emissionsAll Parties 2002Review of emission trendsMSC-W, CIAM Final PM inventory, projections for modelling All Parties coordinated by MSC-W and CIAM

8 Tentative PM timetable: Abatement options and costs Autumn 2000 Workshop on abatement potential and costs CIAM, TFIAM, funded by Germany 2001Preliminary PM cost curvesCIAM 2002Study on new abatement optionsTFIAM, EIPPCB, … Study on costs and instruments for structural change TFIAM, … 2003Review of PM cost curvesAll Parties, coordinated by CIAM Analysis of side-effect for CD, Pb, PAH/BaP CIAM, MSC-E

9 Tentative PM timetable: Effects 2001Workshop on the measurement and economic valuation of health effects NEBEI, TF Health, hosted by UK Workshop on biodiversity indicators CCE, TFIAM Review of new PM effects dataTFAIM, TF Health, WHO, US, EC 2002Workshop on health impacts indicators TFIAM, TF Health, … Final benefits moduleNEBEI, ICPs, TF Health, TFIAM

10 Tentative PM timetable: Integrated assessment modelling (1) Autumn 2000 Preliminary modelling frameworkCIAM 2001Preliminary reduced form modelMSC-W, CIAM, TFIAM 2002Interface to urban scale model(s)CIAM, TFIAM, CAFE (?) … Update of base year emissions, update of modelling framework and 2010, 2015 and 2020 scenarios CIAM, TFIAM Workshop on shipping emissionsCIAM, MSC-W, TFIAM, BARCOM, …

11 Tentative PM timetable: Integrated assessment modelling (2) 2003Test of scenario analysis, sensitivity runsCIAM, TFIAM Workshop on uncertainty managementTFIAM, … 2004Workshop on national IAM experiencesTFIAM, … Application of the model for policy discussions by the Working Group on Strategies and review CIAM, TFIAM

12 Tentative PM timetable: summary 20002001200220032004 Monitoring PF Atmospheric modelling PF Emissions/projections PF Health impacts PF Techniques/costs PF Integrated assessment modelling PF P – preliminary, F - final

13 Tentative PM timetable: summary