Presentation is loading. Please wait.

Presentation is loading. Please wait.

Golden Avenue Public School Golden Avenue and Frank P. Krznaric Whitney Public Schools Accommodation Review 2013 – 2014.

Similar presentations


Presentation on theme: "Golden Avenue Public School Golden Avenue and Frank P. Krznaric Whitney Public Schools Accommodation Review 2013 – 2014."— Presentation transcript:

1 Golden Avenue Public School Golden Avenue and Frank P. Krznaric Whitney Public Schools Accommodation Review 2013 – 2014

2 Golden Avenue Public School School Profile Location – 117 Golden Avenue, South Porcupine, ON Year Built – 1975 Gross Floor Area (Square Meters) – 3,301 Grades – JK to Grade 8 English; Grade 7 & 8 French Immersion Autism Program Ministry Rated Capacity (Students - On The Ground Capacity) –2000 – 2001 – 351.5 –2005 – 2006 – 338.0(Classrooms and JK-K reduced to 23.5) –2006 – 2007 – 328.0(Classrooms reduced to 23, JK-K to 20)

3 Ministry OTG Capacity328 2013-2014 Enrollment194

4 Ministry OTG Capacity328 2013-2014 Enrollment194

5 Golden Avenue Public School School Profile Enrolment – October 31 School Year Enrolment 2002 – 2003 286 2003 – 2004 278 2004 – 2005 274 2005 – 2006 247 2006 – 2007 220 2007 – 2008 200 2008 – 2009 179 2009 – 2010 194 2010 - 2011 198 2011 - 2012 201 2012 - 2013 200 2013 - 2014 194 (188 projected, actual as of Sep 6/13) Decline from 2002-2003 = 92 Surplus Spaces 328–194 = 134 Utilization 59.15%

6 Golden Avenue Public School School Profile Projected Enrolment, Surplus Spaces and Utilization – October 31 School YearEnrolment Surplus Spaces Utilization % 2014 – 2015 119 209 36.3 2015 – 2016 118 210 36.0 2016 – 2017 109 219 33.2 2017 – 2018 105 223 32.0 We have used an intake of 10 students coming into Junior Kindergarten in each year from 2014 to 2018. Grade 7 & 8 students have been moved from the school beginning in 2014

7 Golden Avenue Public School School Profile

8 Golden Avenue Public School School Profile 2013 – 2014 School Organization: JK SK, Grade 1 (10, 5, 4) 19 JK, SK, Grades 1, 2, 3 (2, 2, 1, 1, 1) 7 Grades 1, 2 (15, 4) 19 Grades 2,3 (9, 10) 19 Grades 3, 4, 5 (4, 1, 1) 6 Grades 3, 5, 6 (2, 1, 3) 6 Grades 4,5 (14, 8) 22 Grades 5, 6 (11,11) 22 Grade 5, 6, 7, 8 (2, 1, 1, 2) 6 Grades 6, 7, 8 (2, 1, 3) 6 Grades 7, 8 (16, 13) 29 Grades 7, 8 (13, 20) 33 Total 194 Staff: Principal 1.0 Classroom Teachers 9.6 Special Education Resource Teachers 6.0 Educational Assistant 11.5 Secretary 1.0 Custodians 2.3 31.4

9 Golden Avenue Public School School Profile 2013 - 2014 Specialized Programs Early and Later Literacy, Primary Literacy Assessment Battery, Developmental Reading and Assessment School Wide, Math Coach Support, Special Education Intervention, Curriculum Focus Days – Literacy and Math, Roots of Empathy, Autism Program, Restorative Practices Teams Soccer, Basketball, Badminton, Volleyball, Cross Country Running, Track and Field Clubs 100 Km Club, Band/Choir, Robotics Competition/Club, Computer Club, Skating Club Field Trips Cross Country Skiing Porcupine Winter Carnival Science Olympics Science Fair Grade 8 Trip Camp Bickell Grade 4 Swim Program

10 Golden Avenue Public School School Profile 2013 - 2014 Terry Fox Walk Fire Prevention Week Halloween Activities/Parade Remembrance Day Ceremony – School and Legion Food Bank Book Fairs Christmas Concert Public Speaking (Legion) Knights of Columbus Free Throw Competition Christmas Choir Winter Carnival Education Week Handball (Gr 7,8) Junior Boot Hockey (Gr 4,5,6) Primary Dodgeball Autism Awareness Day Earth Day and Green Team Jump Rope for Heart Kickball/Tball Pizza Lunches School Newspaper Buddy Reading (Gr 8 and Gr 3) Character Education Assemblies School Council Dress Down Days Other Extra-Curricular and Parent Council Activities

11 Golden Avenue Public School School Profile 2013 - 2014 Community Use of School –Women’s Volleyball Group –South Porcupine Winter Carnival –NEOFACS Autism Awareness Day –Elections Ontario (in the past, a provincial Polling Station but with Safe Schools, we are no longer allowing them to use our schools) Community Use of School Grounds –South Porcupine Winter Carnival

12 Golden Avenue Public School Transportation – 2013 – 2014 35% of students walk, 65% are bussed Earliest pick-up time 8:02 a.m. Latest drop-off time 4:09 p.m. Longest distance bussed30.7 km Shortest distance bussed 0.2 km

13 Golden Avenue Public School 2013 - 2014 School Condition The school’s infrastructure is generally in good condition, From 2004 to 2013 $598,855 has been spent on an elevator and upgrades (Heating/Ventilation, Barrier Free Washroom, Communication System, Sound Absorption, Upgrade Gym Lighting,Unpaved Sports and Recreational Spaces, Washroom Stalls and Accessories, Flooring, Exterior Doors, Fire Alarm Upgrade, Exterior Lighting, Gas Piping System Study) From the Ministry’s Condition Assessment Report, they have recommended the following upgrades in the amount of $1,749,582 over the next three years: –Millwork Replacement $268,361 –Roof Replacement $320,000 –Interior Lights $337,500 –Replace Playing Fields $23,023 –Replace Lighting Equipment $68,702 –Interior Doors $42,938 –Branch Wiring Study $12,000 –Floors $15,671 –Lockers $193,220 –Replace Domestic Water Distribution System $430,667 –Domestic Plumbing System Study $15,000 –Stacks & Breaching Study $10,500 –Replace other Communication & Alarm Systems $12,000

14 Golden Avenue Public School 2013 - 2014 School Site and Grounds Paved surfaces, main drive and parking are in good condition Walkways are in good condition Landscaping is in good condition Play areas are in good condition except the unpaved playing fields which has been recommended for replacement Accessibility The school is handicapped accessible. Safety The school entry is considered safe, camera and buzz-in system in place. School grounds and play areas supervised during recess, lunch breaks and during bus times

15 Frank P. Krznaric Whitney Public School Golden Avenue and Frank P. Krznaric Whitney Public Schools Accommodation Review 2013 - 2014

16 Frank P. Krznaric Whitney Public School School Profile Location – 712 Earl Street, Porcupine, ON Year Built – 1972 Gross Floor Area (Square Meters) – 2,940 Grades – JK to Grade 8, Single Track English Ministry Rated Capacity (Students - On The Ground Capacity) –2000 – 2001 – 253.0 –2005 – 2006 – 244.5 (Classrooms and JK-K reduced to 23.5) –2006 – 2007 – 237.0 (Classrooms reduced to 23, JK-K to 20)

17 Ministry OTG Capacity237 2013-2014 Enrollment124

18 Frank P. Krznaric Whitney Public School School Profile Enrolment – October 31 School Year Enrolment 2002 – 2003 237 2003 – 2004 227 2004 – 2005 219 2005 – 2006 207 2006 – 2007 179 2007 – 2008 164 2008 – 2009 146 2009 – 2010 148 2010 – 2011 141 2011 - 2012 133 2012 – 2013 130 2013 – 2014 124 (126 projected, actual as at Sep 6/13) Decline from 2002-2003 = 113 Surplus Spaces 237–124 = 113 Utilization 52.32%

19 Frank P. Krznaric Whitney Public School School Profile Projected Enrolment – October 31 School YearEnrolment Surplus Spaces Utilization % 2014 – 2015 97140 40.9 2015 – 2016 92145 38.8 2016 – 2017 77160 32.5 2017 – 2018 75162 31.7 We have used an intake of 8 students coming into Junior Kindergarten each year. Grade 7 & 8 students have been moved from the school beginning in 2014.

20 Frank P. Krznaric Whitney Public School School Profile

21 Frank P. Krznaric Whitney Public School School Profile 2013 - 2014 School Organization: Junior Kindergarten, Senior Kindergarten (8,6) 14 Grades 1, 2 (10, 10) 20 Grades 2, 3 (7, 10) 17 Grades 4, 5 (10, 13) 23 Grades 5, 6 (10, 13) 23 Grades 7, 8 (12, 15) 27 Total 124 Staff: Principal 0.5 Classroom Teachers 7.3 Special Education Resource Teacher 0.5 Education Assistants 2.0 Secretary 1.0 Custodians 1.8 Total 13.1

22 Frank P. Krznaric Whitney Public School School Profile 2013 - 2014 Specialized Programs Breakfast Program, Fruit and Vegetable Program (Porcupine Health Unit) Teams District Cross Country Run, Badminton, Ball Hockey, Basketball, Soccer, Volleyball, Track & Field Intramurals Flag Football, Cross Country Running, Soccer, Floor Hockey, Dodgeball, Ice Hockey Other Activities Community Food Drive – Thanksgiving Parent Night Spring Concert/Variety Show Hot Lunch Orders, once per month Daily Milk Sales Christmas Cheer Baskets Porcupine Music Festival Monthly assemblies focusing on Character Traits Academic Recognition Grade 4 Swim Program Math Night Camp Bickell

23 Frank P. Krznaric Whitney Public School School Profile 2013 - 2014 Teacher Interaction Primary Learning Communities - instructional for 100 minutes each month during class time Primary & Junior/Intermediate Learning Communities - assessments for the Primary & Junior/Intermediate Grades every two weeks Staff Social Committee Teaching Learning Critical Pathway (TLCP) Teachers Learning in Hubs School Improvement Plan Meetings Math Coach Interactions – Math Lessons Math Support – Co-teaching

24 Frank P. Krznaric Whitney Public School School Profile 2013 - 2014 School Condition The school’s infrastructure is generally in good condition, From 2004 to 2013 $353,785 has been spent on upgrades (Flooring, Handicap Accessibility, Flooring, Air Conditioning System, Acoustical Treatment, Upgrade Gym Lighting, Exterior Walls, Fire Alarm Upgrade, Emergency Lighting, Domestic Water Heater, Cabling/Raceways Study) From the Ministry’s Condition Assessment Report, they have recommended the following upgrades in the amount of $1,455,770 over the next three years: –Millwork Replacement $246,891 –Window Replacements $128,813 –Playing Fields $21,470 –Exterior Doors $98,795 –Lighting Equipment and Fixtures $67,493 –Interior Doors $81,583 –Branch Wiring Study $12,000 –Security System $17,360 –Air Handling Units $90,000 –Window Coverings $42,938 –Lockers $42,938 –Plumbing Fixtures $107,345 –Domestic Water Distribution System $370,181 –Domestic Plumbing System Study $15,000 –Domestic Water Heater $6,750 –PA System $45,000 –Other Communication & Alarm Systems $10,000 –Energy Supply $7,500 –Gym Floor $40,000 –Wall Finishes $3,750

25 Frank P. Krznaric Whitney Public School 2013 - 2014 School Site and Grounds Paved surfaces, main drive and parking are in good condition but with poor drainage Walkways are in good condition Landscaping is in good condition Play areas are in good condition except the unpaved playing fields which has been recommended for replacement Accessibility The school is handicapped accessible with a chair lift to accommodate for access to the raised stage area Safety The school entry is considered safe, camera and buzz-in system in place. School grounds and play areas supervised during recess, lunch breaks and during bus times

26 Frank P. Krznaric Whitney Public School School Profile 2013 - 2014 Community Use of School –NEOFACS – Best Starts Program/Early Learning There has been minimal community interest to use the school

27 Frank P. Krznaric Whitney Public School Transportation – 2013 – 2014 30% of students walk, 70% are bussed Earliest pick-up time 7:55 a.m. Latest drop-off time 4:17 p.m. Longest distance bussed31.95 km Shortest distance bussed 0.14 km

28 Combined JK – Grade 6 East End English Public School Golden Avenue and Frank P. Krznaric Whitney Public Schools Accommodation Review 2013 - 2014

29 Combined JK-Grade 6 East End English Public School Projected Enrolment, October 31 School Year Enrolment 2014 – 2015 216 2015 – 2016 210 2016 – 2017186 2017 – 2018180

30 Combined JK-Grade 6 East End English Public School

31 Combined JK-Grade 6 East End English Public School Projected School Profile 2014 - 2015 School Organization: Jr Kindergarten, Sr Kindergarten (18, 6) 24 Sr Kindergarten, Grade 1 (5,9) 14 Sr Kindergarten, Grades 1, 2, 3 (2, 2, 1, 1) 6 Grade 1 20 Grade 2 20 Grades 2, 3 (10,10) 20 Grades 3, 4 (10, 10) 20 Grades 4, 5, 6 (4, 1, 1) 6 Grades 4, 5 (14, 14) 28 Grades 4, 6 (3, 3) 6 Grade 5 28 Grade 6 24 Total 216

32 Combined JK-Grade 6 East End English Public School Projected School Profile 2014 - 2015 Staff: Principal 1.0 Classroom Teachers 11.4 Special Education Resource Teacher 4.0 Education Assistants 7.0 Secretary 1.0 Custodians 2.3 Total 26.7

33 Combined JK-Grade 6 East End English Public School Projected School Enrolment by Grades School YearGrades JKK123456 Self ContainedTotal 2014-2015181129302024422418216 2015-201618 11293020244218210 2016-201718 112930202418186 2017-201818 1129302018180


Download ppt "Golden Avenue Public School Golden Avenue and Frank P. Krznaric Whitney Public Schools Accommodation Review 2013 – 2014."

Similar presentations


Ads by Google