Rail Runner Wireless System Project Certification Committee Presentation April 27, 2011 1.

Similar presentations


Presentation on theme: "Rail Runner Wireless System Project Certification Committee Presentation April 27, 2011 1."— Presentation transcript:

1 Rail Runner Wireless System Project Certification Committee Presentation April 27, 2011 1

2 Objective: To provide 100% wireless service allowing passengers to stay connected throughout their use of the NM Rail Runner train transportation system and stations. Implement a wireless system that is flexible and scalable as the service area for the Rail Runner expansion. Future capabilities may eventually include such services as ticket vending, ticket verification, failover operations communications, emergency phones, video displays on both the trains and the platforms, and video surveillance equipment. 2

3 Deliverables Status: Project Start Date – February 19, 2009 Deliverable # 1 Planning & Progress Reporting Bonding - Complete Project Work Plans Design & System Engineering System Test & Acceptance Plan – Status Reporting & Presentation Deliverable # 2 Build Pilot System - Complete o Two Stations = Alvarado & Rio Bravo o Backhaul Sites o NOC (Network Operations Center-MRCOG) o 1 Train Set = 1 Cab & 1 Coach

4 Deliverables Status: Deliverable # 3 Build South Phase (Belen to Bernalillo) - Complete o Installed Coaches & Cabs o Implement Wireless System @ 6 Stations o Install 5 Backhaul Sites Deliverable # 4 Build North Phase (Bernalillo to Santa Fe) - Complete o Implement Wireless System @ 4 Stations o Install 12 Backhaul Sites 4

5 Deliverables Status: Deliverable # 5 System Test and Acceptance – On-Going o Review of Fully Operational System o Knowledge Transfer and Training DOT staff o Conduct System Test and Acceptance o Complete System Acceptance Demonstration and Provide Documentation o Warranty Service

6 Deliverables: Deliverable # 6 Lease contract for La Bajada Backhaul Site – Removed From Project Deliverable # 7 Contract for Broadband Wireless Service - Contract Executed/Complete Deliverable # 8 Contract for WiMAX Spectrum Services - Contract Executed/Complete Deliverable # 9 Contract for Operations & Maintenance - Pending Deliverable # 10 Implement Sandia Pueblo Station - Cin Pending 6

7 Issues: Warranty Contract Negotiations Coverage Issues FCC Licensing/Registration Issues Equipment/Solar Batteries

8 Next Steps: Contract Extended to Aug. 31, 2011 Engineering Study Reengineer and Implement Complete System Acceptance Demonstration Execute Warranty Service Contract PR to Promote Budget Budget: $2,656,237 Expended$2,189,651 8

9 Project Manager Ted J Gaudette Information Systems Officer Mid-Region Council of Governments 809 Copper Ave. NW Albuquerque, NM 87102 Phone: (505)724-3609 Email: tgaudette@mrcog-nm.govtgaudette@mrcog-nm.gov