“ ” Presentation of mep works in high rise buildings
3
PROVISIONS OF MEP SERVICES IN HIGHRISE HIGH RISE COMMERICAL BUILDING- ALONG WITH GREEN APPROACH
4
High rise Commercial Building Energy performs a critical role in the development and financial development of a country. Around 40% of total strength produced is ate up with the aid of buildings. In a traditional industrial building, annually round 30% strength is bump off through the HVAC systems. The regular effectively of thermal energy plant is around 30%. It skill that rest of 70% exhaust to the surroundings in the form of heat.
5
imagine you are in an architecturally well designed and constructed building. The building has no lighting, and no applicable ventilation, no lifts, no plumbing, absence of security and security systems. Which capability you are inside a non inhabitable concrete structure, in different phrases you are in a 21st Century cave. Everything inner a constructing which makes you blissful is known as 'Building services'. A building should supply the relief to cease user - now not just grant shelter but additionally to provide the remedy where humans can live, work and enjoy.
6
construction technology is what makes a building come alive. These include: energy supply: gas, electricity and renewable sources for adequate ventilation, water supply, sewer and natural light and artificial lighting, elevators for movement. WLN for ventilation and cooling of solar, wind and biomass energy, such as telephone and entertainment. CCTV security. Fire alarm and security detection Air conditioning and refrigeration These systems must be designed by an appropriate MEP.
7
Green building A diagram which presents and endorses the belief of protected dwelling of the human kind. The distinction between a green and sustainable plan is the degree to which the format helps to hold ecological balance, and to grant power saving in terms of water and power savings.
8
A inexperienced constructing is the one that gives excessive performance, over the full existence cycle of the constructing in the following areas: Minimizing natural sources consumption such as, water and building materials, along want zero energy consumption by means of the use of on hand natural recourses. Minimizing emission that have an impact on surroundings and the ecosystem. Minimizing discharge of strong waste and liquid effluents, along with demolition and occupant waste, sewer, and storm water and the associated infrastructure such as S/T/P/ and many others Minimal negative affects on web site ecosystems. Maximum excellent of indoor environment, inclusive of air quality, thermal regime, illumination, acoustics/noise, and visual aspects to provide comfortable human physiological perceptions. While the sustainability is “ offering for the needs of the existing besides detracting from the potential to fulfill the wants of the future”.
9
GREEN INTIATIVE Green initiatives require proper undertaking group with the precise intentions. they have to achieve dedication from the proprietor and early acceptable documentation of sustainable/green goals. The plan crew ought to record the layout groundwork file to be the profitable green project. Design must be consists of certain ones. Proactive proprietors who are willing to execute the whole spectrum of ownership. Green structures are the one which emphasis on built-in format of mechanical, electrical, architectural and different systems.
10
MEP Provisions in High rise building. In a building MEP execution came into at a very advanced stage and final until the remaining handing over of the building to user. At the early phases of development architects, and structural engineers require input from MEP engineers to hold the provisions for MEP machine in the buildings.
11
System Selection FOR MEP Common requirements of excessive upward jostle and low upward shove buildings Environment Power & Communication Network Plumbing Utilities Fire Alarm and Fire Fighting System Earthling machine and protection Specific requirements of excessive rise buildings Fire get away system. Vertical transportation and garbage chutes Equipment placement and provisions for future maintenance and replacement Lightening arrestor. Compound illumination
12
Usual Requirements Environment Temperature, Humidity, Air motion, Air purity or quality, Air modifications per hour, air and water velocity requirements, nearby climate, house strain requirements, capability requirements, security concerns, running cost, protection cost, reliability etc.
13
Power and communication network Power and Communication Network Commercial structures are normally multi person in nature where requirement varies from user to consumer Sufficient provisions has to be saved now not solely to cater the estimated electricity requirements but also for the future modifications and additions. Communications network need to be open protocol
14
Plumbing Water Supply distribution booster machine v/s gravity based totally tank supply. Provisions of pressure reducers and Isolation valves Filling arrangement for overhead tank. Balcony/trace drain, roof drains Centralized ingesting water device
15
Fire Fighting & Alarm System.This has to be designed according to NBC 2019 and CFO conditions. Fire zoning and cubicles Sprinkler system with area manipulate valves Fire hose cabinets for occupants Wet Risers/Fire hose cabinets for fire fighters Centralized Fire Alarm device in fire rated conduits External Fire evacuation lifts for high upward jab buildings greater than 90 mtrs.
16
Earthling System Earthling System System earthling network to be supplied at areas as per MEP consultant. Body earthling for central tools NBC 2019 AND relevant IS codes ought to be observed Security CCTV digital get entry to to a variety of areas to be provided Parking administration system
17
Specific Requirements Mode of fire escape Fire safety code analysis to be conducted Fire cubicles to be described in the mild of furnace protection code evaluation Fire escapes to be provided with perfect markings External hearth evacuation lift has to be provided. Fire break out routes need to be pressurized and must have two hours furnace rated partitions and doors or as prescribed by way of CFO. Smoke extract machine to be furnished
18
Vertical Transportation Traffic learn about tube carried out to define the volume and capacity of lifts Staircases to be furnished alongside with furnace break out floors as defined through the CFO. Separate and committed fire raise has to be provided Garbage chute Sufficient variety and size of garbage chute to be supplied
19
Utilities network and management for MEP Sufficient head room to be furnished to installation the ducting, piping, cable tray, lights etc. Sufficient number and size of shafts to be furnished The vertical shaft size for services in high-rise building is fairly large than low upward push building as it is now not solely to installation the carrier however additionally for regular renovation has to be to kept
20
Multiservice Rooms It is critical to preserve the Multiservice Rooms for HVAC equipment, statistics rooms, electrical rooms at the central region as it reduces the head room requirements and grant evenly distribution of services. Passage for the gear motion from outdoor to the Multiservice Rooms ought to be viewed at preliminary stage. Provision for future elimination and everyday preservation to be provided Lightening safety to be provided as per NBS and CFO guidelines; Façade lighting fixtures to be supplied as per the elevation diagram by the architects
21
System Constraints Once the ultimate preferences are listed, many constraints must be determined and documented. These constraints many encompass the following: Performance limitations Available potential Available house Available utility sources Available infrastructure Building structure
22
Constructability constraints MEP gadget issues must be taken into account earlier than the assignment reaches the construction phase. Some of these constraints which may affect the success of the sketch and can't be not noted in the format phase. Some issues and worries associated with constructability are as follows: Existing conditions Maintaining current constructing occupancy and operation Construction price range Construction schedule Ability to section machine installation Equipment availability (i.e. shipping lead times)
23
Sustainability Sustainable energy consumption can be compromised and long term project success can be lost in case of the end user are not trained to operate and maintain the building systems.
24
Thank you for watching this presentation Kindly subscribe, like and share which will motivate me for further good presentation. In case of any quarries do not hesitate to write to me. the response shall be at the earliest Contact me 1.civilconclave @gmail.com 2. at my telegram group Ask srini telegram group Link