Presentation is loading. Please wait.

Presentation is loading. Please wait.

IEEE TGbd Sep 2019 Agenda Date: Author: Sep 2019

Similar presentations


Presentation on theme: "IEEE TGbd Sep 2019 Agenda Date: Author: Sep 2019"— Presentation transcript:

1 IEEE 802.11 TGbd Sep 2019 Agenda Date: 2019-08-08 Author: Sep 2019
Bo Sun (ZTE)

2 Marriott Hanoi, Hanoi, Vietnam
Sep 2019 IEEE TGbd Meeting Marriott Hanoi, Hanoi, Vietnam Sep 16-19, 2019 Chair: Bo Sun (ZTE) Vice Chair: Hongyuan Zhang (Marvell), Joseph Levy (InterDigital) Secretary: James Lepp (BlackBerry) Tech Editor: Bahar Sadeghi (Intel) Bo Sun (ZTE)

3 Meeting Protocol, Attendance, Voting & Document Status
Sep 2019 Meeting Protocol, Attendance, Voting & Document Status Please announce your affiliation when you first address the group during a meeting slot Cell Phones to be silent or Off Register your attendance via while on meeting SSID (e.g. Verilan-secure) Make sure your badges are correct If you plan to make a submission be sure it does not contain company logos or advertising Questions on Voting status, Ballot pool, Access to Reflector, Documentation, Member’s Area Contact Jon Rosdahl – Bo Sun (ZTE)

4 Patent Policy and Other Guidelines
Sep 2019 Patent Policy and Other Guidelines Following 5 slides Bo Sun (ZTE)

5 Participants, Patents, and Duty to Inform
Sep 2019 Participants, Patents, and Duty to Inform Participants shall inform the IEEE (or cause the IEEE to be informed) of the identity of each holder of any potential Essential Patent Claims of which they are personally aware if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents Participants should inform the IEEE (or cause the IEEE to be informed) of the identity of any other holders of potential Essential Patent Claims Early identification of holders of potential Essential Patent Claims is encouraged Slide #1 Bo Sun (ZTE)

6 Sep 2019 Ways to Inform IEEE Cause an LOA to be submitted to the IEEE-SA or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible; or Speak up now and respond to this Call for Potentially Essential Patents If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance, please respond at this time by providing relevant information to the WG Chair Slide #2 Bo Sun (ZTE)

7 Patent Related Information
Sep 2019 Patent Related Information The patent policy and the procedures used to execute that policy are documented in the: IEEE-SA Standards Board Bylaws ( IEEE-SA Standards Board Operations Manual ( Material about the patent policy is available at If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at Slide #3 Bo Sun (ZTE)

8 Other Guidelines for IEEE WG Meetings
Sep 2019 Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches January be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. Slide #4 Bo Sun (ZTE)

9 Participation in IEEE 802 Meetings
Sep 2019 Participation in IEEE 802 Meetings All participation in IEEE 802 Working Group meetings is on an individual basis •     Participants in the IEEE standards development individual process shall act based on their qualifications and experience. ( section 5.2.1) •    IEEE 802 Working Group membership is by individual; “Working Group members shall participate in the consensus process in a manner consistent with their professional expert opinion as individuals, and not as organizational representatives”. ( section 4.2.1) You have an obligation to act and vote as an individual and not under the direction of any other individual or group. Your obligation to act and vote as an individual applies in all cases, regardless of any external commitments, agreements, contracts, or orders. You shall not direct the actions or votes of any other member of an IEEE 802 Working Group or retaliate against any other member for their actions or votes within IEEE 802 Working Group meetings, see section and section 3.4.1, list item x By participating in IEEE 802 meetings, you accept these requirements. If you do not agree to these policies then you shall not participate. Slide #5 Bo Sun (ZTE)

10 Agenda items for the week
Sep 2019 Agenda items for the week Call for order and appoint secretary IEEE-SA policies and IPR policies Agenda Agreement Approve TGbd minutes Approve updated FRD and SFD documents Liaison update Presenting of technical submissions for the week Two sessions for parallel PHY/MAC Adhocs TG timeline review Teleconference Plan Any other business Adjourn Bo Sun (ZTE)

11 TGbd Sessions in the week
Sep 2019 TGbd Sessions in the week MON TUE WED THU AM1 TGbd TGbd** AM2 PM1 TGbd/PHY* MAC PHY PM2 TGbd*** EVE Note, * the first session in Monday PM1 will start by TGbd plenary in 15 mins, then the rest time will be divided into PHY/MAC adhoc meeting . ** this session is added and confirmed during Mid-week plenary. *** the closing session on Thursday PM2 will start from 4:40pm to avoid confliction with 11be adhoc chair election Bo Sun (ZTE)

12 General Flow of the Week
Sep 2019 General Flow of the Week Monday Sep 16, PM1, 13:30 – 15:30 TGbd meeting (30 mins) Call Meeting to order IEEE-SA IPR Policy and procedure. Call for Submissions Agenda agreement Approve TGbd minutes Approve updated SFD/FRD Spec skeleton plan Ad hoc groups schedule Recess Adhoc group meetings (rest time) Tuesday Sep 17, AM1, 08:00 – 10:00 Liaison update Presentation of the week Wednesday Sep 18, PM1, 13:30 – 15:30 Adhoc groups meeting Thursday Sep 19, AM1, 8:00 – 10:00 Call Meeting to order IEEE-SA IPR Policy and procedure. Presentation of the week Recess Thursday Sep 19, AM2, 10:30 – 12:30 TG Motions Thursday Sep 19, PM2, 16:40 – 18:00 TG Motions (if needed) Timeline update Approve Spec skeleton and call for contribution Telecon Schedule TGbd closing report Adjourn Bo Sun (ZTE)

13 Technical Submissions for the Week
Sep 2019 Technical Submissions for the Week Notes: Docs in green have been presented. Docs in red have been withdrawn. Docs in black have NOT been presented. Docs in yellow were presented but need more discussion or deferred DCN Author Title Adhoc Group 11-19/1158 Yossi Shaul (AutoTalks) Mechanisms for reliable V2X operation TG 11-19/0783 Michael Fischer (NXP) Radio Environment Operational Metric for NGV 11-19/0864 David Lopez (Nokia Bell Labs) NGV PPDU with Hierarchical MCS PHY 11-19/1073 Rui Cao (Marvell) NGV Midamble Period Choice 11-19/1157 Onn Haran (AutoTalks) Upper layer operation of adjacent channel detector MAC 11-19/1162 Hiroyuki Motozuka (Panasonic) OCB for 60 GHz 11-19/0788r2 Stephan Sand (DLR) Considerations on Ranging in NGV 11-19/1151 Yujin Noh (Newracom) Midamble in NGV 11-19/1152 Compressed Midamble in NGV 11-19/1154 20 MHz transmission in NGV TG (20 MHz) 11-19/1109 Dongguk Lim (LGE) Further investigation of mid-amble performance 11-19/1299 Sean Coffey (Realtek) Extended rate modes in 11bd 11-19/1470 Prashant Sharma (Marvell) NGV Frame Format: Simulations 11-19/1471 NGV Frame Format Followup 11-19/1472 NGV Midamble Design Followup 11-19/1473 NGV 20 MHz Spectrum Mask and OFDM Numerology Followup 11-19/1619 Liwen Chu (Marvell) PSDU length indication Bo Sun (ZTE)

14 Technical Submissions for the Week
Sep 2019 Technical Submissions for the Week Notes: Docs in green have been presented. Docs in red have been withdrawn. Docs in black have NOT been presented. Docs in yellow were presented but need more discussion or deferred DCN Author Title Adhoc Group 11-19/1480 Insun Jang (LGE) Harmonization for 20MHz Channel Access TG (20 MHz) 11-19/1481 Signaling for Adaptive Repetition of 11p PPDU in 11bd TG 11-10/1482 Discussion on Multiple Frame Transmission in 11bd MAC 11-10/1484 Dongguk Lim (LGE) Frame format for 11bd PHY 11-10/1485 Auto-detection method for 11bd 11-19/1494 Yossi Shaul (AutoTalks) Fair sub-channel access 11-19/1285 Friedbert Berens (FBConsulting) CAM statistics generation model for simulations 11-19/1478 Hanseul Hong (Yonsei Univ.) Study on 20MHz Channel Access Schemes: follow-up 11-19/1502 James Lepp (BlackBerry) Frame Aggregation 11-19/1503 Wakeup Radio in ITS band 11-19/1596 Rui Yang (InterDigital) PHY signaling for Adaptive Repetition of 11p PPDU 11-19/1636 Feng Jiang (Intel) Preamble design in 11bd Call for submissions for Sep meeting Bo Sun (ZTE)

15 Meeting Slot #1 Agenda Monday PM1, 13:30 ~ 15:30
Sep 2019 Meeting Slot #1 Agenda Monday PM1, 13:30 ~ 15:30 TGbd meeting Call for order IEEE-SA policies and IPR policies Call for submissions Agenda Agreement Approve TGbd minutes Approve updated FRD and SFD Spec Skeleton plan Adhoc groups schedule Recess Adhoc group meetings PHY adhoc  Same meeting room as TGbd plenary MAC adhoc  Another meeting room Bo Sun (ZTE)

16 Sep 2019 Approve TGbd Minutes Approve the TGbd minutes for Jul meeting and TCs before Sep meeting as below: Moved: James Lepp Seconded: Joseph Levy Accepted with unanimous consensus Bo Sun (ZTE)

17 Approve the updated FRD
Sep 2019 Approve the updated FRD Approve the updated FRD document as in 11-19/0495r2: Moved: Bahar Sadeghi Seconded: Qinghua Li Accepted with unanimous consensus Bo Sun (ZTE)

18 Approve the updated SFD
Sep 2019 Approve the updated SFD Approve the updated SFD document as in 11-19/0497r3: Moved: Bahar Sadeghi Seconded: Rui Cao Accepted with unanimous consensus Bo Sun (ZTE)

19 Meeting Slot #2 Agenda Tuesday AM1 8:00 ~ 10:00
Sep 2019 Meeting Slot #2 Agenda Tuesday AM1 8:00 ~ 10:00 Call meeting to order IEEE-SA meeting policies and Patent policy Call for submissions Liaison update IEEE 1609 progress update (John Kenny) Presentation of the technical submissions for the week Recess Bo Sun (ZTE)

20 Meeting Slot #3 Agenda Wednesday PM1, 13:30 ~ 15:30
Sep 2019 Meeting Slot #3 Agenda Wednesday PM1, 13:30 ~ 15:30 PHY/MAC Adhoc groups meeting PHY adhoc  Same meeting room as TGbd plenary MAC adhoc  Another meeting room Bo Sun (ZTE)

21 Meeting Slot #4 Agenda Thursday AM1, 8:00 ~ 10:00
Sep 2019 Meeting Slot #4 Agenda Thursday AM1, 8:00 ~ 10:00 Call meeting to order IEEE-SA meeting policies and Patent policy Presentation of the technical submissions for the week Recess Bo Sun (ZTE)

22 Meeting Slot #5 Agenda Thursday AM2, 10:30 ~ 12:30
Sep 2019 Meeting Slot #5 Agenda Thursday AM2, 10:30 ~ 12:30 Call meeting to order IEEE-SA meeting policies and Patent policy Presentation of the technical submissions for the week PHY SPs TG Motions Recess Bo Sun (ZTE)

23 Meeting Slot #6 Agenda Thursday PM2 16:40 ~ 18:00
Sep 2019 Meeting Slot #6 Agenda Thursday PM2 16:40 ~ 18:00 Call meeting to order IEEE-SA meeting policies and Patent policy TG Motions TG timeline review Approve Spec Skeleton and call for contribution Teleconference plan Presentation of the technical submissions for the week TGbd closing report Adjourn Bo Sun (ZTE)

24 Timeline (updated) PAR approved Dec 2018 First TG meeting Jan 2019
Sep 2019 Timeline (updated) PAR approved Dec 2018 First TG meeting Jan 2019 D Sept 2019  Nov 2019 D1.0 Letter Ballot Nov 2019  Mar 2020 D2.0 LB recirculation Mar 2020  Jul 2020 Form Sponsor Ballot Pool May 2020  Sep 2020 D3.0 LB recirculation May 2020  Sep 2020 D3.0 unchanged recirculation July 2020  Nov 2020 Initial Sponsor Ballot (D4.0) Sept 2020  Jan 2021 Final WG approval July 2021  Nov 2021 802 EC approval July 2021  Nov 2021 RevCom and SASB approval Sept 2021  Dec 2021 Bo Sun (ZTE)

25 Approve the spec draft skeleton document
Sep 2019 Approve the spec draft skeleton document Approve the content of 11-19/1638r0 as the P802.11bd spec draft skeleton document for future spec development: Moved: Bahar Sadeghi Seconded: Hongyuan Zhang Accepted with unanimous consensus Bo Sun (ZTE)

26 Teleconference Plan Planned TC: New TC plan: Zoom/Join.me Date: Oct 8
Sep 2019 Teleconference Plan Planned TC: Date: Oct 8 Time: 6:00pm~8:00pm, ET New TC plan: Date: Oct 29 Time: 10:00am ~ 11:59am Zoom/Join.me Bo Sun (ZTE)


Download ppt "IEEE TGbd Sep 2019 Agenda Date: Author: Sep 2019"

Similar presentations


Ads by Google