AGIBA TLC UPGRADE PROJECT by Mamdouh Tolba ITC General Manager

Similar presentations


Presentation on theme: "AGIBA TLC UPGRADE PROJECT by Mamdouh Tolba ITC General Manager"— Presentation transcript:

1 AGIBA TLC UPGRADE PROJECT by Mamdouh Tolba ITC General Manager

2 AGIBA TLC UPGRADE PROJECT 1- Phase one Ashrafi concession

3 Fiber Optic Cable (F/O) between Nasr City Exchange and A.H.Q
PHASE ONE Fiber Optic Cable (F/O) between Nasr City Exchange and A.H.Q Nasr City Central AGIBA H.Q Fiber Optic Cable

4 Phase one to improve the connection With Agiba H.Q
PBX VPN Ieoc NASR C.CENTRAL 3xE1 1xE1 1xE1 ISP Internet 1xE1 2xE1 F/O Cisco Router 28xx PSTN 2 x MUX w/ 4E1 each 2 x MUX w/ 4E1 each 4xE1 2xE1 Core Switch HDSL Modem SUCO Servers HDSL Modem Ashrafi LAN IP Gateway PBX PC/Printers AGIBA HQ LAN ASHRAFI

5 AGIBA TLC UPGRADE PROJECT 2- Phase Two Western Desert

6 Project Goals and Scope
To connect Agiba Head Quarter in Cairo (HQ) with its Western Desert Operation Locations (OL) so to ensure seamless communication. To upgrade OL LANs so to ensure seamless data, voice and video integration with the HQ (Triple Play). The OLs in scope are: El-Hamra, Midpoint, Meleiha, Zarif, Faras, Raml, Aghar. Kalabsha could be considered later on.

7 Solution Overview The solution consists of deploying Broadband Wireless Technology (BBW) in combination with Telecom Egypt Fiber Optic (FO) as well as the recently repaired Agiba FO cable linking Meleiha to El Hamra via Mid-Point. Upgrade the Local Area Networks in the various OL by introducing Cisco based IP Telephony and Wi-Fi technology, Video Conferencing. Provide high speed link (Wi-Max) to the Rigs operating in the vicinity of Meleiha, Aghar and Faras (18Mbps up to 30Km distance). The aggregated bandwidth within the Western Desert OL will be more than 48Mbps and 8Mbps to Cairo Head Quarter with 99,999% availability.

8 Aghar Hamra Mid-Point Zarif Meleiha Raml Faras

9 Agiba TLC Upgrade overview
M.P F/O Cable from Cairo Meleiha Hamra Zarif Faras Raml Aghar R1 R2 54 Km 14 Km 53 Km 7 Km 58 Km 78 Km 83 Km Tarek (Khalda) Ras ElHekma S. Rahman Telecom Egypt FO BB Wireless TLC Tower 10 Km 32 Km 40 Km 100m 40m 20m 15m 30 Km TLC Mast

10 Agiba TLC Upgrade overview
Ras Elhekma PSTN 40m 8Mbps El-Hamra Tarik 100m Sister Company Sidi Abdrahman PSTN M.P 8Mbps Meleiha 48Mbps TE FO to Cairo Aghar Repeatr B Zarif Repeater A Rigs B.B.W Point to Multipoint B.B.W Point to Point Fiber optic cable T.E Raml Faras 30m Fiber optic cable Agiba

11 THANKS