Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mobility Management during road construction – a Swedish attempt

Similar presentations


Presentation on theme: "Mobility Management during road construction – a Swedish attempt"— Presentation transcript:

1 Mobility Management during road construction – a Swedish attempt
ECOMM 2011 The Swedish Transport Administration

2 Mobility Management during road construction – a Swedish attempt
Background Challenge Working method Results so far Next steps

3 Background Region of Stockholm 2 million inhabitants
Constantly growing

4 The challenge - Planned roadwork

5 Existing knowledge, expertise and applications
Projects

6 Existing cooperations in the Stockholm region
Metropolitan group

7 + What is Mobility Management during construction? ”Hard” measures
Instruments Travel planning Measures for behavioural change ”Hard” measures Improved public transport Optima-zation of sustainable transport MM during construction MM for new PT MM for events MM for wokplaces MM for bottle necks MM for new residential areas +

8 Example application: Road 155
Reconstruction for improvements for traffic safety, public transport and accessibility for the harbour area. New pedestrian- and cycling-lanes Objective for MM: Increased PT-share, decreased share of car traffic MM-Measures: Reserved bus-lane, ride-sharing and heavy transport (also after construction has finished) Increased parking areas for P+R Increased service frequency for busses Information; announcements, workplace-meetings, newsletter Personal travel advice campaign Results: - 10% car traffic + 3% PT trips

9 Example: Calculation of potential
Gärdshemsvägen to Göteborgsvägen, E45 through Trollhättan Increase from two to four lanes, improved cycle-lanes, etc MM-measures: Local travel plans for companies Individualised marketing Estimated costs due to disruptions: 4,5 million SEK Estimated costs for MM- measures: 1,8 million SEK

10 What is missing? Routine for Mobility Management during road construction in the National Transport Administration`s quality management system Principles for and agreements about financing Knowledge about effects and benefits of Mobility Management during road construction General expertise at all involved actors

11 Trace 2: National decisions
Collite experience Draft Anchoring Refine Method Trace 1: New routines Literature studies Interviews Workshops and meetings Trace 2: National decisions Internal + external info Inspiration National contacts + cooperation

12 From study to built road
Existing road-planning process Pre-study Feasibility study Work plan Construction document Construction Operation Draft for process for Mobility Management during road construction Assessment of the need of MM MM study Cooperation agreement Planning of MM-measures Evaluation Implementation of MM- measures

13 Step 1: Assessment of the need of MM
MM study Cooperation agreement Planning of MM-measures Evaluation Implementation of MM- measures Assessment Identification of likely disruptions Size Concerned means of transport Timetable Identification of stakeholders Types (Residence, workplaces, trade, etc) Target population (leisure travel, business travel, business travel, freight, etc.) Conclusion Proceed with MM Only awareness raising No measures at all

14 Step 2: MM study MM study Travel survey:
Assessment Cooperation agreement Planning of MM-measures Evaluation Implementation of MM- measures MM study Travel survey: Target groups, travel habits, potential for change Structural analysis Current situation, weaknesses, additional measures Description of measures Analysis of travel survey and structural analysis, MM-measures Efficacy analyses Traffic, CO2, economics, costs Organization Timetable, responsible actors

15 Step 3: Cooperation agreement
Assessment MM study Planning of MM-measures Evaluation Implementation of MM- measures Cooperation agreement One responsible actor Several responsible actors

16 Trace 2: National decisions
Next steps Trace 1: New routines Regional implementation Routines for evaluation Trace 2: National decisions National routine General financing principles

17 Thank you for your attention
Christine Schnabel, WSP Katarina Appeltofft, National Road Administration


Download ppt "Mobility Management during road construction – a Swedish attempt"

Similar presentations


Ads by Google