Download presentation
Presentation is loading. Please wait.
Published byKinga Grzelak Modified over 5 years ago
1
API SC 17 Subcommittee on Subsea Production Systems API RP 17U Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment June 2013-Report
2
Report As part of the subcommittee towards RP 17U, the work realized includes the following: Work Group – Concluded Working with API(Ed) in the area of formatiing and addressing the SC 17 group comments. Incorporating comments provided by SC 17 group In the process of getting in contact with members of SC 17 that provided negative feedback in order to address their comments.
3
Current Work Receives comments and suggestions from SC17 members
Addressing comments. Contacting negative voters to discuss their comments to determine a way to resolved them.
4
Thank you
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.