1 ECOLOGISATION OF VARNA TPP
Kamen Boshnakov ENERGY DEVELOPMENT IN THE CHANGING WORLD – STRATEGIES, CHALLENGES, OPTIONS Sofia, December, 2012, Sheraton Hotel Balkan PRG-ZPD P1E

2 THE ROLE OF VARNA TPP AS PART OF THE NATIONAL ELECTRICAL ENERGY SYSTEM
With three out of its six units, it provides 60% of the cold back-up of the national power system, which was activated 41 times in 2011 Furthermore, it is an essential source for Northeastern Bulgaria Over the last few years Varna TPP has repeatedly managed to prove its exceptional significance in the event of emergency situations, repairs of other capacities of the electrical energy system, increased consumption of electricity, or in energy crisis situations The power plant was crucial for ensuring energy stability in Bulgaria when the deliveries of Russian gas stopped in January 2009, as well as during the prolonged repairs at Unit 6 at Kozloduy NPP in the autumn of The capacities of the power plant have been used time and again in force majeure circumstances to meet abrupt increases in the demand of electrical energy Varna TPP plays a key role for the energy balance of the country and for ensuring stability of power supply These are all but a few examples that evidence the great significance of Varna TPP, not only locally, but also on a national level Ecologisation of Varna TPP

3 ECOLOGISATION OF VARNA TPP
I. Air Emissions 1. Emission restrictions for the units at Varna TPP: UNIT № 2012 2013 2014 2015 2016 Units №1, 2 and 3 700 h/y per unit NOx– 1200mg/Nm3 SO2– 2500mg/Nm3 Dust– 350 mg/Nm3 Unit № 4 NOx– 1200 mg/Nm3 SO2– 2500 mg/Nm3 Dust – 230 mg/Nm3 NOx – 1200 mg/Nm3 Unit № 5 SO2 – 400 mg/Nm3 Unit № 6 Dust – 50 mg/Nm3 - derogation of Article 4, Directive 2001/80/ЕС - compliance with Directive 2010/75/ЕС - compliance with Directive 2001/80/ЕС or decommissioning - transitional period for Directive 2001/80/ЕС - decommissioning 2. Scheduled measures to ensure compliance: Decommissioning units 1, 2 and 3 by the end of 2015 Ecologisation of units 4, 5, and 6 to reach the limits as per Directive 2010/75/EC by constructing desulphurization installation, reconstructing the electrostatic precipitators and installing deNOxing units Ecologisation of Varna TPP

4 ECOLOGISATION OF VARNA TPP
II. Emissions of greenhouse gases Emissions of greenhouse gases Realization of investments in the amount of euro, included in the national investment plan for the period The main issue is the lack of clarity in the legislation regarding the reimbursement of the expenses on free quotas Ecologisation of Varna TPP

5 ECOLOGISATION OF VARNA TPP
III. Reconstruction and environmentalisation of the coal ash pond of the plant Operational limitations of the coal ash pond Coal Ash Pond Section 2012 2013 2014 2015 2016 Section one t Section two t - operation in the conditions of wet disposal - decommissioning, environmentalisation and reconstruction - operation in the conditions of dry disposal Ecologisation of Varna TPP


Download ppt "ECOLOGISATION OF VARNA TPP"