Presentation is loading. Please wait.

Presentation is loading. Please wait.

WECC Scenario Task Force (WSTF)

Similar presentations


Presentation on theme: "WECC Scenario Task Force (WSTF)"— Presentation transcript:

1 WECC Scenario Task Force (WSTF)
Weekly Webinar May 31, 2019 WECC 2019 Scenario Assessments (Data Collection and Metrics)

2 2019 Scenario Studies Timeline
Form Teams 2/1/ /1/2019 Scope Studies 3/4/ /31/2019 Collect Data 4/15/ /5/2019 Create Cases 6/3/ /26/2019 Perform Analysis 7/1/ /20/2019 Review Results 8/12/ /1/2019 9/30/ /20/2019 Produce Reports Results Reviewed Data Collected 11/1/2019 7/5/2019 Reports Produced Teams Formed Studies Scoped Cases Created Analysis Completed 3/1/2019 5/31/2019 7/26/2019 9/20/2019 12/20/2019 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2019 Today

3 Modeling Tasks Identify & Adjust Scenario Parameter Metrics
Geospatial Analysis Network Reduction Load Forecasts Gen CapEx Updates Tran CapEx Updates Reduced Network PCM Renewable Potentials Water Constraints CO2 Constraints Policy Goals Reliability Constraints Extend PCM to 2038

4 Context Anchor Data Set Study Scopes
Focus on Reliability Risk Assessment Uncertainty & Plausibility Drill-down Process Key Questions Study Horizons Reporting Metrics Tools Methodology

5 Model Adjustment Categories
Load Transmission Goals Geospatial Generation Economics Constraints Horizon

6 Load Energy Demand Profiles Seasonal Variations
Conforming / Non-conforming Distribution / Transmission Demand Response

7 Generation Technology Type Price Signals Proxies Candidate
Operational Characteristics Qualifying Roles

8 Transmission Interface Paths Transfer Capabilities Expansion Options

9 Economics Generation Capital Expansion Economics
Transmission Capital Expansion Economics Levelized Cost of Energy (LCOE) Locational Marginal Price (LMP) Emission Costs Credits Fuel Costs Locational Water

10 Goals Policy Reliability Flexibility Reserve

11 Constraints Fuel Water Emissions

12 Geospatial Environmental Land Cover Terrain Difficulty Right of Way

13 Horizon Near-term (5 Year) Planned (5-10 Year) Long-term (10-20 Year)

14 Michael Bailey, P.E. WECC Senior Staff Engineer


Download ppt "WECC Scenario Task Force (WSTF)"

Similar presentations


Ads by Google